| Capacity | Site | Operator / Developer | Campaign groups | Information | |
|---|---|---|---|---|---|
| JERSEY, BAILIWICK OF JERSEY | |||||
| Existing 126,000 | La Collette 2 Reclamation Area, La Collette, St. Helier | Jersey Transport And Technical Services | Save our Shores (SOS) | The La Collette incinerator replaces the old Bellozanne incinerator. Accepted household waste for the first time on the 27th of December 2010 [Source]. In April 2016 it was announced that Guernsey’s waste would be sent to Sweden rather than to Jersey as Jersey was too expensive [Source]. In January 2022 it was reported that a fault with the incinerator was costing the Government £325,000 due to a faulty generator [Source, Source]. In August 2025 it was reported that "there is no reference to the Energy Recovery Facility at La Collette in the recently published ‘Investing in Jersey’ strategy – a 25-year government framework for investing in the island’s infrastructure", which some speculated as meaning that no decision had yet been made to replace the incinerator which due to reach its end of life by 2036. (Entry updated 2025-09-24) | |
| DERBY, EAST MIDLANDS | |||||
| Potential 157,000 | Sinfin Integrated Waste Treatment Centre, Sinfin Lane, Osmaston | Macquarie Asset Management (on behalf of Derby City and Derbyshire County Council) | Derby FoE and Sinfin and Spondon Against INcineration (SSAIN) [Also see Simon’s blog] | In August 2019 Derbyshire and Derby Councils decided to end the contract with RRS but did not yet formally abandon the project [Source]. Development of the gasification plant is effectively on hold until the Councils determine a 'fair value' for the project and better understand what would be needed to get the plant to operate so that they can determine whether or not they wish to purchase the plant. ENERGOS gasification incinerator granted planning permission on re-appeal in September 2012, with completion target delayed until October 2017 [Source, PINS case summary, Source, Source, Source]. Funding from the Green Investment Bank announced in August 2014 [Source]. Planning Application submitted May 2009. Permit WP3133KP issued in November 2010. It was reported in July 2018 that "Bad smells from the controversial Sinfin waste treatment plant are still plaguing residents almost a year after the stink first started" [Source]. In August 2024 it was reported that "The authorities [i.e. Derbyshire County Derby City Council] say they will now push ahead with plans to get the facility up and running" [Source]. The project remains mothballed, but the councils continues to pursue bidders to fix and operate the plant. In July 2025 Viridor withdrew from the bidding for the propject, with the two remaining bidders being Biffa and Thalia [Source]. In October 2025 it was reported that the project had " entered the competitive dialogue phase of the procurement process" which was expected to conclude in 2026 with a final decision on the contract expected in May 2026 [Source]. In May 2026 the Councils announced that "A procurement process to appoint a contractor to fix and operate Sinfin waste treatment centre is being brought to an end by Derby City Council and Derbyshire County Council and no contract will be awarded at this time" and that "The councils will carry out a rapid review of future options for the project and a report will be presented to their respective Cabinets later in the year to set out a recommended way forward. No decisions have been made at this stage regarding the long-term future of the waste treatment centre" [Source]. (Entry updated 2026-06-30) | |
| DERBYSHIRE, EAST MIDLANDS | |||||
| Existing 169,000 | Drakelow Park Renewable Energy Centre, Site of the Former Drakelow C Power Station, Walton Road, Drakelow, Burton upon Trent | Vital Energi | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In March 2025 it was reported that the facility was fully operational [Source]. Derbyshire County Council voted to approve the planning application for the RDF-based gasification plant in October 2015 (ref. CW9/0615/48). Awarded a CfD by BEIS in September 2017 [Source]. An Environmental Permit was issued in April 2020 (ref EPR/GP3031JB/A001). In February 2020 it was reported that Vital Energi had taken over the project in conjunction with technical advisor's Royal Haskoning who are hoping to complete by 2023 and that: "Beauparc Group has been contracted to supply Vital Energi with 169,000 tonnes of refuse derived fuel over the long-term supply contract" [Source]. In November 2023 it was reported by EWB that the "project will not be fully operational this year as was planned" but that a Vital spokesperson had stated said that "Commissioning work at the Drakelow Energy Facility is continuing, albeit that it is taking longer than had been anticipated. There are, however, no major issues as has been suggested". The Companies House records for Vital Energi (Drakelow) Limited note an outstanding (as of 3 June 2024) charge created in January 2020 and delivered in February 2020 which refers to "Aviva Investors Infrastructure Income No.4B Limited on Behalf of Aviva Investors Infrastructure Income Limited Partnership and Aviva Investors Multi Asset Alternative Income Fund, Sicav-Raif Scsp (Acting on Behalf of Sub-Compartments Iv and V)" and similarly named related entities [Source]. According to the Vital Energi Annual Performance Report for year ended 30th June 2025: "We expanded our energy-from-waste (EfW) assets by acquiring Aviva's stake in our existing Drakelow EfW plant and acquiring the Port Clarence EfW plant" [Source]. (Entry updated 2026-02-25) | |
| Potential 230,000 (RDF) | Swadlincote Energy Recovery Facility / "Swadlincote Resource Recovery Park", adjacent to Appleby Glade Industrial Estate (A444), Swadlincote | R&P Clean Power Ltd | Swadlincote Against Waste Incineration | Planning permission CW9/1022/22 granted on appeal in August 2025 (PINS ref APP/U1050/W/24/3354670). A planning application was submitted to Derbyshire County Council in October 2022 [CW9/1022/22]. Pre-application consultation launched in June 2021 for an incinerator intended to treat "household and Commercial & Industrial waste". An updated revision of the planning application was submitted in July 2024. The initial consultation on permit application EPR/LP3327SK/A001 closed on 28 June 2024, and a second round of consultation closed in December 2024. A consultation on a draft permision was launched in September 2025 and is due to close 8 October 2025 [See consultation page]. In September 2024 the Derbyshire County Councillors on the Planning Committee voted to refuse planning permission primarily due to landscape impacts, including conflict with National Planning Policy for Waste Locational Criteria and South Derbyshire District Council local plan policies. In September 2024 the council refused planning permission due to "significant harm to the visual amenity and landscape character of the area". For documents relating to the appeal see the appeal section of the 'Associated documents' tab of the Derbyshire planning portal entry for CW9/1022/22. While the planning appeal was determined based on a 'design capacity' of 186,000 tpa this is not a planning condition and the requested permit would allow for up to 230,000 tpa of "mixed non-hazardous fuel" to be treated. Permit EPR/LP3327SK/A001 was issued in December 2025 with a capacity of 230,000 tpa. (Entry updated 2025-12-09) | |
| LEICESTERSHIRE, EAST MIDLANDS | |||||
| Existing 455,000 | Newhurst Energy Recovery Facility, Newhurst Quarry, Shepshed (near Loughborough - access via Ashby Road East) | Encyclis | Shepshed Against Incinerator Group (SAIG) / Charnwood Against Incinerator (CHAIN) / Loughborough Air Quality Protection Group | Biffa’s planning application for a 300,000 tonne incinerator (proposed 180,000 municipal, 120,000 East Midlands Commercial & Industrial (C&I)) was granted planning permission on appeal on the 28th of June 2012 [Source, Source]. Permission for increased capacity of 350ktpa approved in October 2014 (ref 2014/1440/02) [Source]. In June 2017 it was reported that Covanta had been brought on as a partner [Source]. In July 2018 it was reported that Biffa applied for a variation to the Environmental Permit to match the 350,000tpa capacity for which it secured planning permission [Source]. A permit variation was applied for in July 2018 to reflect the changes to the proposal and this was approved in May 2019 [EPR/TP3036KB/V004]. In February 2020 it was reported that Biffa had reached financial close in conjunction with Covanta and Macquarie's Green Investment Group (GIG) [Source]. Permit variation to change operator from Covanta to Encyclis issued is in July 2023. In August 2023 it was reported that the facility entered full operational status when it was handed over in early June 2023. Permit variation to increase capacity to 455ktpa was approved in 2024 (EPR/RP3004MA/V005). In July 2025 it was reported that Encyclis had bought out Biffa's shares [Source]. (Entry updated 2025-07-31) | |
| LINCOLNSHIRE, EAST MIDLANDS | |||||
| Existing 190,000 | Lincolnshire Energy from Waste Facility, Whisby Road, North Hykeham, Lincoln | FCC (Formerly Waste Recycling Group) and Green Recovery Projects (GRP) / ICON | Lincolnshire Anti-Incineration Alliance (LAIA) | Operational incinerator. Planning permission granted July 2009 [Source]. WRG were announced as the preferred bidder of the Lincolnshire Waste PFI in October 2010 ahead of Shanks/Wheelabrator [Source]. The contract was signed on the 4th of March 2011, and WRG began construction in May 2011 [Source]. In March 2026 the constened capacity was increased by 20,000 tpa to 190,000 tpa [Source]. The minutes of the March 2026 meeting states "That planning permission be granted as set out in the officer report, subject to completion of a deed of variation to the unilateral undertaking to carry forward the HGV routing via the A46" [Source]. Nothing on the planning portal entry for the variation records that the decision notice was issued as of 30 June 2026, but an April 2026 Needs Assessment produced by the Council states that the capacity was increased [Source]. (Entry updated 2026-06-30) | |
| Potential 25,000 (Plastic) | Clean Planet Energy Eco Plant, Plastics-to-fuel plant / SWIP for syngas generated in the production of Purified Pyrolysis Oil, Plot 2, Sleaford Moor Enterprise Park, Sleaford | Clean Planet Energy | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning application submitted in November 2025 for a "waste pyrolysis plant building (plastics to fuel facility)" (PL/0094/25). The Planning Statement states that "the end products are hydrocarbon oil, gas and residue" and that the "Purified Pyrolysis Oil" would be sold to the petrochemical industry. The Planning Statement also notes that the pant would require a Small Waste Incineration Plant (SWIP) permit. According to the process description in the Air Quality Impact Assessment: "The pyrolysis process thermally treats the plastic in the absence of oxygen to produce a gas that is condensed to produce a base oil. The non-condensable gases that are produced in the process form a synthesis gas (or syngas) that comprises a mixture of gaseous species (e.g. methane, ethane, butane, ethane, etc). This is combusted on site to provide the heat for the pyrolysis process. Emissions from this process are treated in a thermal oxidiser with the exhaust gas from the treatment being subject to the emission limits referenced in the IED. The vaporised base oil from the fired heater is thermally treated using steam to create product oils. Emissions from this process are treated in the thermal oxidiser and are subject to the emission limits referenced in the IED. Emissions to air from the main operation is discharged via a single core stack. An emergency flare system is maintained to treat non-condensable gases when the thermal oxidiser is not available. The flare system is used while the thermal oxidiser is reinstated or while the process shuts down". (Entry updated 2025-12-09) | |
| NORTHAMPTONSHIRE, EAST MIDLANDS | |||||
| Potential 154,000 | Resource Recovery Park, Brookfield Plantation, off Gretton Brook Road, Corby | ESF Energy (previous scheme involved Gretton Brook Estates Ltd) | Corby Against Waste Plants and Gretton Parish Council / Gretton and Weldon (Facebook) | In April 2020 the applicant put in a planning application to vary the consent to allow a change of technology to bubbling fluid bed (BFB) combustion and to increase the total maximum throughput to 154,000 tonnes per annum and this was approved in August 2020 (20/00022/WASVOC and 20/00023/WASVOC). The permission was varied again in April 2022 to increase the stack height from 25m to 35m (NN/21/00059/WASVOC). Previous planning application put on hold indefinitely due to lack of environmental information in December 2014, with an expectation that the developer would apply with a new application taking account of the various changes to the proposal and their environmental impacts [Source]. Outline planning application (ref 13/00027/OUT) submitted January 2013 states that the Renewable Fuel Production and Recycling Facility (which already has planning consent) "will accept up to 120,000 tonnes per annum of the mixed domestic and commercial waste stream to produce approximately 50,000 tonnes per annum of biomass derived fuel", and that the fuel is "intended for use in a biomass powered energy generation facility, within the Resource Recovery Park". DRENL applied in December 2014 to allow waste from further afield at their RDF-production plant [Apps 14/00093&00094/WASVOC] [Source]. In May 2024 the Environment Agency did not include this facility in their list of plants that had a permit or outstanding permit application. (Entry updated 2024-05-13) | |
| Potential 357,408 | Energy Recovery Centre, Willowbrook East Industrial Estate, Shelton Road, Corby | Encyclis | Camp Brookfield and Lee Barron MP | Planning application approved in October 2019 (19/00027/WASFUL) [Source]. Proposal announced in January 2019 for a combustion plant, which is presumably a conventional moving grate mass-burn incinerator. In January 2021 the planning permission was varied to to accommodate the facility as a single line plant, with a condition that the development must begin before 5th October 2022 (NCC Ref 20/00048/WASVOC). Not to be confused with the Clean Power Properties gasification proposal proposed within the same site footprint which had a lower stack and building height. Permit application to increase capacity to 360ktpa submitted in Setepmber 2023 [EPR/EP3629SF/A001]. In December 2023 Encyclis applied to the Environment Agency for a permit, stating a maximum capacity of 357,408 (EPR/EP3629SF/A001). In May 2024 it was reported that this facility was "thought to be close to making financial close" [Source]. It was reported in February 2025 that it was understood that "Encyclis is preparing to begin full construction" [Source]. Permit EPR/EP3629SF/A001 issued on 4th June 2024. As of July 2025 there is no mention of the Corby facility on the Encyclis website either as operational or under construction, whereas the Walsall plant which was listed alongside Corby as being in "in the final stages of development" in a Janaury 2023 press release is listed as being under construction [Source, Source]. North Northamptonshire Council stated in March 2026 that: "In regards to planning permission ref: 19/00027/WASFUL, as amended by 20/00048/WASVOC, the Waste Planning Authority was satisfied on 23 June 2022 that the development had lawfully commenced... Although works began on site to implement the permission, the development itself has not yet been fully built out. Therefore, as the planning permission has commenced, the planning permission cannot expire." (Entry updated 2026-04-20) | |
| NOTTINGHAM, EAST MIDLANDS | |||||
| Existing 310,000 | Eastcroft Energy from Waste Facility / "Nottingham Waste Incinerator", Eastcroft, Incinerator Rd, off Cattle Market Road | FCC (formerly Waste Recycling Group) / WasteNotts (Reclamation) Ltd and Green Recovery Projects (GRP) / ICON | Nottingham Friends of the Earth (FoE) and previously by Nottingham Against Incineration and Landfill (NAIL) | Permitted capacity at the existing two lines increased to 200ktpa in June 2012. Planning permission to add a third line granted at appeal in February 2009 (Appeal Ref. 2063129), with consented capacity for all three lines increased to 310ktpa/340ktpa in January 2016 (15/02548/PMFUL3). Although as of December 2022 the third line has not entered operation, construction technically commenced and so the permission remains extant. Takes waste primarily from Nottingham City Council and Nottinghamshire County Council. A report to Nottingham City Council's Audit Committee from 25th September 2020 included a reference to: "A significant capital investment is needed to replace the deteriorating district heating infrastructure including the distribution network, power generation plant (Enviroenergy) and Energy-From-Waste (EFW) facility (Eastcroft incinerator)...An estimated £300m 30-year contract is being negotiated..." [Source]. (Entry updated 2022-12-15) | |
| NOTTINGHAMSHIRE, EAST MIDLANDS | |||||
| Potential 24,369 | Proposed Waste-to-Feedstock Facility and Energy Recovery Facility, site of the former recycling plant and current Waste Transfer Station, Shireoaks Road, Worksop | Envale | Shireoaks and Rhodesia Against Plastic Pyrolysis (SRAPP) Action Group. Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning application for an "Plastic Chemical Recycling Facility and Energy Recovery Facility" submitted to Nottinghamshire County Council in April 2024 [ES/4644]. It is unclear whether the facility would be regulated by Bassetlaw District Council as a SWIP, by the Environment Agency, or as a hybrid. As of 5th March 2025 no permit application has been announced. In October 2025 Nottinghamshire County Council issued a second Regulation 25 request which included a total of 19 questions to be answered prior to the determination of the planning application, and the applicant responded to this in December 2025 with a consultation on this new information running until February 2026. (Entry updated 2026-02-25) | |
| Potential 524,550 | East Midlands Energy Re-generation (EMERGE) Centre, Site of the Ratcliffe on Soar Power Station | Uniper UK Ltd | Stop Ratcliffe Incinerator and Breathless in Nottingham - Campaign against the Incinerator (Facebook Group) and XR Nottingham. | In August 2020 Uniper put in a planning application for a merchant incinerator and the Council voted to approve this in March 2022 subject to a potential call-in by the Secretary of State (ref ES/4154). According to the scoping request, the facility would use conventional incineration technology to burn C&I and LACW waste, including RDF, and have the potential to treat combustible fractions of construction and demolition waste as well as being intended to be capable of accepting certain waste biomass fuels. According to the applicant, the gross generating capacity would be 49.9MW, which is just below the threshold to be considered an NSIP. The Environmental Permit was issued in March 2022 [See EA consultation page]. Permit NP3608BQ issued in February 2022. In May 2024 the Environment Agency listed the facility status as "construction not started". In November 2024 it was reported that doubt had been cast over the future of the project after an investor disposed of its shares in the scheme [Source]. Development technically commenced in February 2025, preserving the planning permission, although there has been no announcement of financial close and no sign of meaningful construction as of February 2026. In November 2025 Uniper applied for a revised Local Development Order for the wider Ratcliffe on Soar site to create a larger data centre complex on the site, with Plot A (which includes the EMERGE plant) listed still as "Energy generation & storage; advanced manufacturing and other industrial uses; data centres; logistics (up to 180,000m² GFA), research & development; education, skills & training uses" - there is no indication that the source of energy generation would be incineration, but this has not been explicitly ruled out (25/02015/LDO). (Entry updated 2026-02-25) | |
| BEDFORDSHIRE, EAST OF ENGLAND | |||||
| Existing 657,000 | Rookery South Energy Recovery Facility, Rookery Pit / Ampthill near Stewartby | Encyclis / Veolia | Marston Moreteyne Action Group (MMAG) and Bedfordshire Climate Change Forum (BCCF) and Bedforshire Against Covanta Incinerator (BACI) (see also BACI blog) and Marston Park Residents Association (MPRA) and XR Bedfordshire | Mass-burn incinerator granted planning permission by the Infrastructure Planning Committee (IPC) in October 2011 [See decision notice, Source]. Designed for both municipal and C&I waste. Veolia joined the project in May 2016 (Source). Permit EPR/WP3234DY issued in January 2018 [See permit]. In March 2019 it was reported that the project had reached financial close, with Veolia owning 20%, Covanta 40% and Green Investment Group 40% and that construction would be led by Hitachi Zosen Inova [Source]. In March 2022 it was reported that this facility was operational [Source, Source]. In November 2024 it was reported that Encyclis was consulting on carbon capture plans which would require Council planning approval [Source]. In December 2025 planning permission was approved by Central Bedfordshire Council for a carbon capture plant to connect with the incinerator (See documents, Source). According to the Environmental Statement for the variation, carbon capture would reduce electricity export by 258,400 MWh a year (representing a reduction of more than 53% compared to 2024 electricity export levels) [Source]. (Entry updated 2026-02-25) | |
| CAMBRIDGESHIRE, EAST OF ENGLAND | |||||
| Existing 110,000 | Peterborough CC EFW Plant, Fourth Drove, Fengate, Peterborough | Viridor / KKR / Peterborough City Council | Peterborough Friends of the Earth | Officially began operations in January 2016. Planning permission for a conventional 65,000 tpa incinerator approved in November 2009 [Source]. Planning application to increase capacity to 85,000 tonnes submitted in September 2012 [Source]. Viridor were named the preferred bidder to operate the facility in August 2012 [Source, source]. Permit BP3836GR issued in October 2010 which was replaced by Permit NP3638ZS in December 2016. In 2023 Viridor announced plans to increase capacity to 110ktpa (permit ref EPR/NP3638ZS/V006). Not to be confused with the gasification plant proposed nearby. (Entry updated 2022-08-07) | |
| Potential 12,000 (clinical) | Envar site, St Ives Road, Somersham | Envar Composting Ltd | People Opposing Woodhurst Incinerator (POWI) ( Facebook / Website) | Granted planning permission on appeal in July 2024 (APP/E0535/W/23/3331431). In June 2022 Cambridgeshire County Council issued a Regulation 25 request for further environmental information. Planning application submitted to Cambridgeshire County Council in June 2021 for a healthcare waste incinerator (ref. CCC/21/088/FUL). In September 2021 a Q&A session was held with the applicant [Source]. In April 2023 planning application CCC/21/088/FUL was refused by Cambridgeshire County Council. This refusal was appealed and the appeal was subsequently recovered for determination by the Secretary of State (CCC/21/088/FUL). An application was submitted in May 2026 to discharge planning conditions 9, 12, 29, 31, and 33 [CCC/26/065/DCON]. (Entry updated 2026-06-30) | |
| Potential 625,600 | Medworth Energy from Waste Combined Heat and Power Facility, Land on the Algores Way Industrial Estate to the west of Algores Way in Wisbech, Fenland, Cambridgeshire | MVV Environment Ltd | Wisbech Without Incineration (WisWIN) / No Incinerator in Wisbech | Development Consent Order (DCO) issued in February 2024 for this NSIP application [See NSIP page]. Permit EPR/HP3441QA/A001 issued in May 2024. It was announced in February 2025 that Kanadevia Inova (formerly known as Hitachi Zosen Inova or HZI) is the builder for the incinerator and that MMV "has commenced the first stages of construction works on its Medworth Energy from Waste (EfW) facility" [Source, Source]. ENDS reported in December 2024 that this project had yet to reach financial close [Source]. While it was announced in February 2025 that ground clearance had begun on the site, the announcement did not state whether or not the project had reached financial close [Source]. However, in October 2025 it was reported that "main site construction works" had begun which indicates that financial close had been reached [Source]. As of 5th June 2025 the following requirements (planning conditions) had been discharged by Cambrideshire County Council: 2: Requirement 2 (detailed design) - part discharged in relation to Work No. 10 (Acoustic Fence); 6: Biodiversity Net Gain Strategy; 11: (Construction Traffic Management Plan) - part discharged in relation to Work No. 10 (Acoustic Fence); 21: Employment and Skills Strategy; 26: Air Safety (Parts 1 and 2); 24: Community Liaison Manager; and 27: Local Air Quality Monitoring Strategy. DCO Requirement 27 requires local air quality monitoring, and the strategy was approved in December 2024. The monitoring period is due start prior to commencement and is to carry on until the fourth anniversary of the date of final commissioning. (Entry updated 2025-11-25) | |
| ESSEX, EAST OF ENGLAND | |||||
| Existing 595,000 | Rivenhall Airfield, Coggeshall Road (Braintree) | Indaver (with land leased from Gent Fairhead) | Parishes Against Incineration (PAIN), No Essex Incinerator and Essex and Colchester FoE / Eastern Green Party | Incinerator for municipal and C&I RDF and paper pulp granted planning permission in March 2010 after a public inquiry [Source]. Application to allow for a maximum of 595,000 capacity approved in February 2016 (ref ESS/34/15/BTE). Allocated Round One Contracts for Difference funding in February 2015 [Source]. In April 2015 permission was granted by Essex County Council for the facility to take SRF/RDF from further afield [Source]. An environmental permit application was made in November 2015 (EPR/KP3035RY/A001), with Schedule 5 notices issues by the Environment Agency in March 2016 and July 2016, and refused in December 2016 [Source]. Consultation on draft revised permit announced in March 2017 with stack height increased to 58 metres [EPR/FP3335YU/A001]. Planning application to increase stack height to 58 metres submitted in July 2017 and refused in April 2019 [ESS/36/17/BTE, Source]. Environmental permit issued in September 2017 with a 58 metre stack height [Source]. Permit variation application to allow a reduced stack height was approved in June 2020 (EPR/FP3335YU/V002). In February 2022 the Council voted to extend the permission for the site but not to allow for the incinerator to be built without the associated infrastructure which formed part of the original application [Source]. In September 2022 the Planning Inspectorate confirmed that Indaver Rivenhall Ltd had lodged an appeal against the Council's Condition 66 decision which require that the current planning consent can only be implemented as part of a wider scheme (PINS Appeal Ref 3306429). In November 2023 an NSIP application to increase generating capacity to 65MW was submitted to the Planning Inspectorate, and this was approved in December 2024 (see NSIP page). In July 2025 it was reported that Essex County Council had requested a review of the planning applications by the Secretary of State [Source]. In April 2025 Indaver applied to Essex County Council for a "continuation of development" (ref ESS/23/25/BTE) to allow for various deviations from the conditions of the existing consent including a "void" area for carbon capture, a change to what the MRF can process, the removal of the "no visible plume" requirement, and to allow for a "phased development" which would allow for the incinerator to be built before the MRF (with no deadline for when the MRF would have to be built). The carbon capture element was also the subject of related 'slot out' and 'slot in' applications made in parallel (ESS/39/23/BTE/NMA13 and SS/24/25/BTE). In June 2025 Braintree District Council objected to these three applications and called for the Secretary of State to call them in. The site was reported to have taken its first waste delivery in July 2025 [Source]. In August 2025 the Environment Agency opened consultation on variations to the permit that would increase the types of waste that could be incinerated at the plant and allow for a "phased" delivery of the wider project, and this was approved in November 2025 (EPR/CP3906LP/V003). In January 2026 the Secretary of State rejected a request from the operator to be able to vary the details of the approved incinerator in ways that could impact the environment without securing permission from the Secretary of State [Source]. (Entry updated 2026-04-20) | |
| Potential 379,658 | Thameside Energy Recovery Facility (previously "Tilbury Green Power Facility"), Former Cargill Sweeteners Plant, Tilbury Dock | Viridor / KKR | Biofuelwatch | In March 2020 the Secretary of State for BEIS approved a variation to increase capacity from 280ktpa to 350ktpa of MSW, C&I, SRF or RDF Source. Planning permission granted for 600ktpa wood burning incinerator in 2009, and extended in August 2015 to allow construction to commence by August 2015 [Source]. Permission to vary to allow 300ktpa of SRF, MSW and C&I to be burned at the incinerator submitted in August 2011 [Source]. Obtained £35m of GIB funding in March 2015 [Source]. In February 2019 Tilbury Green Power submitted a variation application to BEIS under the Electricity Act which stated: "Planning permission (13/01179/FUL) was granted by Thurrock Council for an amended Waste Wood Storage and Processing facility in April 2014...A decision to change the initial concept (30 MWe waste wood biomass plant and a 30 MWe waste to energy plant) to a 40 MWe waste wood biomass and a 20 MWe waste to energy facility was made in 2013, based on financial assessment of the project...For the second generating unit, it is proposed to convert 350,000 tonnes per annum of waste material delivered to the Phase 2 unit to electricity...The proposed Phase 2 configuration will consist of conventional moving grate combustion technology" [Source]. A permit variation application for 350ktpa of capacity went out for consultation in February 2023 (EPR/WP3007LM/V002). In October 2023 Thameside Energy Recovery Facility Limited applied to increase permitted capacity from 170,000/350,000 tpa to 379,658 tpa and this was approved in January 2024 (EPR/WP3007LM/V002). In May 2024 the Environment Agency listed the facility status as "construction not started". In November 2024 it was reported that the project had reached financial close and that "construction will begin shortly, marking the next phase of the project" [Source, Source]. It was reported in June 2025 that "The facility remains on track for commercial operation in 2028" and that the construction work to date had comprised of ground clearance (i.e. "groundwork and substructure activities") [Source]. (Entry updated 2025-07-31) | |
| Potential 8,000 (SRF) | Land adjacent to Chelmsford City Racecourse, Great Leighs, Chelmsford | Moulsham Hall Farms Ltd and EPower International / easyPower | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning application made in May 2021 (and approved in September 2021) for a 1MW pyrolysis demonstrator plant intended to treat Solid Recovered Fuel (SRF). According to the planning application the plant would use "easyPower's pure pyrolysis technology" and that "the plant will generate syngas which will be used as a fuel to provide a nominal output of 750 MWe from one on site gas engine" (ref. ESS/61/21/CHL). Planning permission graned in September 2021 and conditions 1, 19, 22 and 28 were discharged in November 2021 including notification of commencement. (Entry updated 2024-08-22) | |
| NORTH NORFOLK, EAST OF ENGLAND | |||||
| Potential 50,000 | Waste R&D Trial / "Temporary installation and testing of proprietary pyrolysis plant and equipment", Scottow Enterprise Park, Lamas Road, Badersfield | Standard Gas SG No.1 Limited (Standard Gas) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In December 2023 planning permission was granted by North Norfolk District Council for a "Temporary installation and testing of proprietary pyrolysis plant and equipment" (PF/23/1796). This permission was varied in August 2025 to extent the 18 month timeframe to a 24 month timeframe but this variation did not seek "any change to the 60-day operational period during which the facility will be operational". A permit consultation opened in June 2025 and closed in July 2025 (ref EPR/TP3529LW/A001). According to the Supporting Information provided in the permit application by the applicant: "The Standard Gas pyrolysis technology will produce a clean ‘End of Waste’synthesis gas and therefore meets the definition of an Installation as defined by Section 1.2 ‘Gasification, liquefaction and refining activities’ paragraph A(1)(f)(iv) namely: ‘Activities involving the pyrolysis, carbonisation, distillation, partial oxidation or other heat treatment of other carbonaceous materials.’ On the basis that all gas combusted by the process meets the ‘End of Waste’ criteria, the CHP engines will be regulated as Medium Combustion Plant (MCP) and Specified Generators (SG) and operated in accordance with the Environmental Permitting (England and Wales) Regulations 2018 (As Amended)". The applicant also states that the feedstock would be pre-processed waste, "principally Refuse Derived Fuel (RDF) and other similar combustible material". A permit was issued in April 2026 which noted that: "The plant will pyrolyse refuse derived fuel (RDF) to produce cracked and cleaned syngas. The syngas will be burned in two CHP engines to generate power and provide heat to the wider Scottow Enterprise Park. It will treat about 50,000 tonnes of waste per year and generate approximately 5 MWe of electricity and 2.5 MWth of heat. The operator intends to clean the syngas to the extent that it is no longer a waste and emissions cannot be higher than from burning natural gas, in which case the requirements of IED chapter IV will not apply when it is burned. The operator intends to demonstrate gas quality equivalent to natural gas during commissioning, incineration emission limits will apply if this gas quality is not demonstrated" (EPR/TP3529LW). (Entry updated 2025-09-23) | |
| SUFFOLK, EAST OF ENGLAND | |||||
| Existing 295,000 | Suffolk Energy from Waste Facility, Highways depot opposite Masons Landfill Site, Great Blakenham, Ipswich | Suez Environment (formerly SITA) | Suffolk Against Incineration and Landfill (SAIL) and Mid Suffolk FoE | Plant opened in December 2014 [Source]. Suffolk County Council signed a contract with SITA in early October 2010 and SITA/Suez submitted an application on 11 January 2011. Planning permission granted on 21st July 2011 [Source, Source, Source, See Non-technical Summary]. Permit WP3438HZ issued in September 2011. In August 2019 Suez applied for a permit to increase the capacity from 269,000 to 295,000 tpa to "reflect the design capacity within the firing diagram for the as-built facility" [Source]. (Entry updated 2020-01-06) | |
| Potential 24,369 | Beccles Recycling Centre, Benacre Road, Ellough | VC Cooke LTD | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In April 2023 the RDF incinerator was granted planning permission by Suffolk County Council (SCC/0063/22W). SWIP permit issued by the Coucil in January 2024, with Council stating that they had "included a condition in the permit requiring V.C. Cooke to submit a carbon-management plan showing that the incinerator does not contribute to climate change." [source, see further information]. In February 2025 it was reported that work on the site was "underway" [Source]. In March 2025 it was reported that: "VC Cooke have begun construction of their waste incinerator at Ellough, with the smoke-stack now visible from the A145 roundabout nearby" [Source]. (Entry updated 2026-02-25) | |
| ISLE OF MAN, ISLE OF MAN | |||||
| Existing 60,000 | Richmond Hill, Douglas | Royal Bank of Scotland International. Operated by Suez Environment (formerly SITA) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Building completed in 2004. It was reported in September 2013 that: "Central government is withdrawing the subsidy for using the Energy from Waste plant and the bill is being picked up by ratepayers, increasing every year from £57.35 per tonne in April this year [2013] to £161.35 per tonne by 2018" [Source]. It was reported in January 2020 that the 3% rate rise was due in part to "gate fees at the incinerator" [Source]. In May 2019 the plant was bought by Royal Bank of Scotland International from the Isle of Man Bank [Source]. Tonnes burned: 56,129.9 (2006); 57,226.4 (2007); 55,051.3 (2008); 53,619.1 (2009); 52,847.7 (2010); 49,049 (2014); 47,622 (2015); 49,961 (2016); 50,476 (2017); 50,120 (2018). A fire was reported at the site in November 2021 [Source]. (Entry updated 2021-11-09) | |
| NORTH LONDON, LONDON | |||||
| Existing 560,000 | Edmonton Solid Waste Incinerator, Advent Way, Edmonton | LondonEnergy (formerly London Waste Ltd) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | The North London Waste Authority currently seem to intend to keep using Edmonton until 2025, with a replacement Energy from Waste facility expected to be in place by 2025 to keep the district heating scheme running [Source]. (Entry updated 2021-10-04) | |
| Potential 700,000 | Edmonton EcoPark AKA "North London Heat and Power Plant", near the Edmonton Solid Waste Incinerator on Advent Way, Edmonton | North London Waste Authority | Stop The Edmonton Incinerator Rebuild and Extinction Rebellion | Incinerator proposed to replace existing Edmonton incinerator by around 2025, to be located next to the current incinerator site. Consultation began in November 2014, with a second phase of consultation in June 2015 [Source]. A Development Consent Order was issue by BEIS in February 2017 and "construction preparation could start in 2019. The existing plant would be decommissioned and demolished 2028, once the new facility up and running." [Source, Source, See dedicated webpage]. Environmental Permit issue in June 2017 [EPR/UP3232AC/A001]. In May 2024 the Environment Agency listed the facility status as "construction not started" but according to the project website construction started at the site in 2019 [Source]. It was reported in August 2024 that "High costs and labour shortages could delay the opening of the new Edmonton incinerator by two years, according to officials" and that "the NLWA, which is leading the project, said the incinerator will not be fully up and running until 2027, because of a 'challenging period' for the construction industry" [Source]. In August 2025 it was reported that "the construction of the new Edmonton incinerator is continuing to drag amid a series of local and international challenges" and that the 2027 completion date is now in doubt, with Delays were attributed in part to "challenges being faced by [sub-contractor] Acciona" by NLWA chair Councillor Clyde Loakes [Source]. (Entry updated 2025-09-23) | |
| SOUTH EAST LONDON, LONDON | |||||
| Existing 464,000 | SELCHP, The Kennels Site, Landmann Way, Lewisham | South East London Combined Heat and Power Limited / Veolia | ? | The BEIS 2020 Q1 Heat Networks Pipeline Report associates this incinerator with a heat network [Source]. (Entry updated 2020-07-08) | |
| Existing 805,920 | Riverside 2 / "Riverside Energy Park", Norman Road, Belvedere (London Borough of Bexley) | Cory | Save Crossness Nature Reserve, CPRE London, Not Another Incinerator In Bexley (NAIIB) and the Greenwich-Bexley Environment Alliance. | Application for an incinerator with a nominal capacity 655ktpa and a maximum throughput of 805ktpa received by the Planning Inspectorate in November 2018 under the National Infrastructure Planning regime [See NIP website]. This facility would be next to the existing Cory incinerator. The DCO was granted in April 2020 [Source]. In August 2021 Cory Riverside held an inception meeting for their 'Cory Decarbonisation Project' to add carbon capture to Riverside 1 and 2, which would be partially built on paddocks that form part of the Crossness Nature Reserve (designated as Metropolitan Open Land), and an NSIP application is expected to be submitted to the Planning Inspectorate in Q1 2024 (see document library, see NSIP page). The project announced financial close in December 2022 [Source], and according to the operator construction began in January 2023 [Source]. In May 2024 the Environment Agency listed the facility status as "construction not started", but Cory has publicly stated that construction has started and in May 2024 a constructor stated they had completed "underground bunker and foundation piles for the new facility" [Source]. In November 2025 the Environment Agency opened a permit consultation for the proposed Cory Decarbonisation Project which is due to close on 8th January 2026 [EPR/JP3020LL/A001]. (Entry updated 2025-12-09) | |
| Existing 850,000 | Riverside 1 / "Riverside Resource Recovery Facility" / "Belvedere", Norman Road, Belvedere (London Borough of Bexley) | Cory / Riverside ReSource Recovery Limited | Save Crossness Nature Reserve, CPRE London and Bexley And District Against Incineration Risks (BADAIR) | Granted planning permission by the Department of Trade and Industry in June 2006 [Source]. In August 2022 the Environment Agency issued permit for expansion of capacity from 785ktpa to 850ktpa. "At its meeting on 16th June 2009 the London Borough of Bexley awarded a 25 year contract to Cory Environmental to treat up to 70,000 tonne per annum of its residual waste through the Belvedere EfW Facility". In June 2018 the incinerator was sold to a consortium which included Dalmore Capital, Swiss Life Asset Managers, Fiera Infrastructure and Semperian PPP Investment Partners [Source]. In May 2021 Cory applied to BEIS to vary the consent to increase capacity from 785ktpa to 850ktpa (see Cory webpage). In September 2022 the Environment Agency granted a permit variation increasing capacity to 850ktpa (EPR/BK0825IU/V009). In August 2021 Cory Riverside held an inception meeting for their 'Cory Decarbonisation Project' to add carbon capture to Riverside 1 and 2, which would be partially built on paddocks that form part of the Crossness Nature Reserve (designated as Metropolitan Open Land). The NSIP exmination for Cory Decarbonisation Project closed in May 2025, with a decision expected in early November 2025. (see document library, see NSIP page). In November 2025 the Environment Agency opened a permit consultation for the proposed Cory Decarbonisation Project which is due to close on 8th January 2026 [EPR/JP3020LL/A001]. (Entry updated 2025-12-09) | |
| SOUTH LONDON, LONDON | |||||
| Existing 382,286 | Sutton Waste Management Facility / "Beddington Energy Recovery Facility ", Beddington Lane, Sutton | Viridor / KKR | Stop the South London Incinerator and London Green Party | Construction began in July 2015 and it was reported in July 2018 that the site was in commissioning and that the facility was expected to be operational in August 2018 [Source, Source]. In July 2019 there was a fire at the incinerator's waste storage unit [Source]. Granted planning permission in August 2013 [Source]. A long-term municipal waste management contract was signed between Viridor and the South London Waste Partnership in November 2012 [Source]. Croydon Council led the procurement process for the South London Waste Partnership (SLWP), which also includes the boroughs of Sutton, Merton and Kingston. On the 20th of October 2010 the Government withdraw PFI funding for the project [Source]. A permit variation to increase the permitted capacity from 302,500tpa to 347,422tpa was issued by the Environment Agenncy in December 2020 (EPR/TP3836CT/V004). In November 2022 Viridor applied for a variation to increase capacity from 347,422 tpa to 382,286 tpa, and this was granted in June 2026. See Merton TV record of emission limit breaches for this incinerator. In August 2025 it was reported that the incinerator had broken air pollution limits 916 times due to a series of errors - See June 2025 Compliance Assessment Report for details [Source, Source]. (Entry updated 2026-06-30) | |
| DURHAM, NORTH EAST | |||||
| Potential 10,500 (clinical and hazardous) | Fornax Specialist Waste Treatment Facility, Merchant Park, Newton Aycliffe / Land North Of Hitachi Rail Europe Ltd, Millennium Way, Aycliffe Business Park | Fornax Environmental Solutions Ltd | Stop Heighington Lane Incinerator and Heighington Lane Incineration Plant Information Group (Facebook Group) and Great Aycliffe Town Council | Planning permission was granted on appeal in December 2022 (PINS appeal ref 3292099). A planning application was made in May 2021 for a "High Temperature Incineration Facility" to treat health care, hazardous, hygiene, and medical waste as well as law enforcement confiscated material (Durham CC planning ref. DM/21/01500/WAS). In July 2024 the applicant applied for planning conditions 7 and 10 to be discharged. In November 2024 it was announced that development began in June 2024, the steel framework had been completed at the site, and the project was due for completion by 2025 after which it would undero a 3 month commissioning period [Source]. In March 2025 it was reported that the plant would be operational by Spring 2025 [Source]. Permit consultation closed in July 2025 (EPR/QP3720LP/A001). It was reported in July 2025 that the would-be operator hopes the plant will "be in operation in the first quarter of 2026" and that "The EA is expected to announce a draft decision on the permit in the winter and then another public consultation will be held on that decision" [Source]. (Entry updated 2025-09-24) | |
| REDCAR AND CLEVELAND, NORTH EAST | |||||
| Potential 250,000 - 300,000 (RDF) | rDME Production Facility, Plot 6, Dorman Point, Teesworks | Circular Fuels Arboretum Ltd, a joint venture between Dimeta (which is itself a joint-venture between SHV Energy and UGI International) and KEW Technology | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning application approved by Redcar & Cleveland for Waste-to-rDME (Dimethyl Ether) plant in June 2023 (R/2023/0080/ESM). According to the planning statement: "The plant is designed to process approximately 250,000 – 300,000 tonnes per annum of RDF fuels to undergo an advanced thermal treatment process, namely gasification, from which the resultant syngas will be scrubbed, CO2 stripped, compressed, and chemically converted to form the organic compound Dimethyl Ether...or DME...The primary use for the products produced by the plant will be as a direct replacement for fossil fuels (LPG, Propane, Butane etc) that are currently sold into the commercial and residential consumer markets". It was published in The Gazette (the official Public Record) in February 2025 that KEW Projects Limited and KEW Technology Limited had appointed liquidators [Source, Source, Source, Source] (Entry updated 2025-03-05) | |
| Potential 250,000 | Second waste-to-energy plant / "Teesport East Specialist Waste Processing and Conversion Centre", Teesport Commerce Park, Middlesbrough | PD Ports / Wentworth Clean Power Limited / Teesport East Specialist Waste Processing and Conversion Centre Limited | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | On the 10th of November 2020 a proposal for a 300ktpa plant at the TeesPort Commerce Park was announced [Source], and on the 25th of November 2020 a related announcement for a second plant with 250ktpa of capacity was announced [Source]. According to the press release for the 250ktpa plant, "the project is likely to be considered a Nationally Significant Infrastructure Project and various works and studies are already underway in advance of a formal planning application being submitted in the second half of next year [i.e. 2021]". Whilst the press releases refer to the project as using "highly advanced" technology, it is unclear whether they will be using conventional incineration or gasifcation/pyrolysis. Because the press release for the 250ktpa plant refers to 250ktpa of "specialist feedstocks" it is anticipated that this plant is related to "Teesport East Specialist Waste Processing and Conversion Centre Ltd" owned by Wentworth Clean Power Limited and would use some form of 'advanced conversion' technology rather than conventional incineration. No sign of the project on the NSIP website as of 16 February 2023. (Entry updated 2023-02-16) | |
| Potential 300,000 | Teesport Renewable Energy Centre, Dockside Road, to the south of Teesport Commerce Park, Middlesbrough | PD Ports / Wentworth Clean Power Limited / Teesport Renewable Energy Centre Limited | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | On the 10th of November 2020 a proposal for a 300ktpa plant at the TeesPort Commerce Park was announced [Source], and on the 25th of November 2020 a related announcement for a second plant with 250ktpa of capacity was announced [Source]. According to the press release for the 250ktpa plant, "the project is likely to be considered a Nationally Significant Infrastructure Project and various works and studies are already underway in advance of a formal planning application being submitted in the second half of next year [i.e. 2021]". Whilst the press releases refer to the project as using "highly advanced" technology, it is unclear whether they will be using conventional incineration or gasifcation/pyrolysis. No sign of the planning application on the Council website as of 16 February 2023. (Entry updated 2023-02-16) | |
| Potential 500,000 (RDF) | Redcar Energy Centre, Site of Redcar Bulk Terminal, Redcar | Partnership betweem Low Carbon and PMAC Energy | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development | In July 2022 it was reported that the facility was awarded Contracts for Difference support [Source]. Project announced in July 2018 [Source]. Planning permission was granted in January 2021 and is set for completition in 2025 [R/2020/0411/FFM, Source]. Permit issued in May 2025 (EPR/TP3502MS/A001). In ealy 2026 an Environmnet Agency Compliance Assessment Report (CAR) reported that: "The site is still awaiting construction. The operator advised [that] the project is in an advanced stage of development but the next step of selecting project partners will take place over the next 12-18 months". (Entry updated 2026-03-03) | |
| Potential 450,000 | Tees Valley ERF (TVERF / TV ERF), Grangetown Prairie, Land East of John Boyle Road and West of Tees Dock, Grangetown | Viridor | Stop Incineration North East (S.I.N.E), Newcastle Green Party, South Tees Green Party and Darlington Green Party | Outline planning permission granted in July 2020 (ref R/2019/0767/OOM) and various reserved matters were approved in August 2023. In July 2020, it was reported that a coalition of Local Authorities (Newcastle, Durham, Darlington, Hartlepool, Middlesbrough, Stockton, Redcar and Cleveland councils) were looking to progress a joint project to build an incinerator [Source, Source]. In January 2023 the Enviornment Agency published for consultation a permit application by FCC for an incinerator on the site with an increased capacity of 512ktpa (EPR/ZP3309LW/A001). Planning applications covering reserved matters and the discharge of planning conditions were submitted in March 2023 approved in August 2023 - Viridor's are reference R/2023/0247/OOM and R/2023/0246/RMM and R/2023/0227/CD, while Green Recovery Projects Ltd (FCC and iCON) has references R/2023/0253/RMM and R/2023/0224/CD. In August 2024 it was reported that the unstarted construction had been delayed and the project was not now expected to enter fully operation until 2029 [Source]. In January 2025 it was reported that Viridor was the only remaining bidder [Source]. In July 2025 a permit was issued to Viridor (EPR/AP3627SL). In August 2025 Viridor was named as the preferred bidder [Source]. In April 2026 it was reported that "Viridor and Tees Valley Energy Recovery Limited (TVERL) have reached financial close on the Tees Valley Energy Recovery Facility (TVERF)" and that "The contract has a value of £2 billion over 29 years, with the facility expected to be operational from 2030" [Source, Source]. (Entry updated 2026-06-30) | |
| STOCKTON ON TEES, NORTH EAST | |||||
| Potential 200,000 | Land At New Road, Billingham | Billingham Energy Ltd and China Power Engineering (EPC Contractor) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In January 2025 Stockton-on-Tees Brorough Council received a Section 73 application to very conditions 4 and 6 of the planning application to remove the reference to gasificaiton from the description of the development to allow for a change of technology from the approved gasification plant to more conventional combustion, but this application was withdrawn in May 2026 - it is possible that this proposal could return in a different form as the reasons for withdrawal have not been stated (25/0148/VARY). A Shadow Habitats Regulations Assessment was submitted December 2025, and Natural England subsequently requested further information on 18 December 2025. Neither a Regulation 25 request or response are available on the Council website relating to this request for further informat as of 20 April 2026. Further information was subsequently provided. Planning permission for a gasification plant was issued to O2N Energy in February 2014 (13/2892/EIS). This was varied in January 2016 by O2N Energy to increase the capacity for the ERF including MRF from 150ktpa to 200ktpa (16/0195/VARY) and permission was technically implemented "through the demolition of buildings and works to construct the site access onto New Road". The permission was was varied again (20/2620/VARY) in January 2021, this time by EQtec, to "accommodate the proposed changes to the footprint and layout of the development", but retained the 200ktpa capacity and combination of gasification and MRF. (Entry updated 2026-06-30) | |
| TEES VALLEY UNITARY AUTHORITY, NORTH EAST | |||||
| Existing 756,000 | Teesside Energy from Waste Plant & "North East Energy Recovery Centre (NEERC)", Tees Valley Lines 1-5, Haverton Hill Road, Billingham, Teesside | SITA Tees Valley Limited (Suez Environment , formerly SITA) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Lines 1 and 2 known as Haverton Hill opened in 1998 and was refurbished in 2014. Line 3 is an extension to Haverton hill which opened in 2009. Lines 4 and 5 known as North East Energy Recovery Centre (NEERC) are on neighbouring site but are regulated as part of the same facility. The proposed Line 6 is in a separate entry. (Entry updated 2026-02-25) | |
| Potential 375,000 (RDF) | Billingham Reach EfW, Billingham Reach Industrial Estate, Stockton | Tees Eco Energy Ltd (TeesEco) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Original planning application for fluidised bed biomass-only plant approved in October 2009 (09/1562/EIS). Application to vary to being a moving grate (conventional incineration) RDF plant approved in November 2016 (16/2165/VARY). Permit application for RDF plant made in November 2017 and granted in September 2018 [EPR/NP3537YY/A001]. In November 2022 the operator "elected to defer permit review" and in October 2023 a permit variation was issued to requiring a report to be submitted showing compliance with the updated BAT Conclusions before the incinerator can be operated. Not to be confused with the two nearby Haverton Hill incinerators operated by Suez/Sita. (Entry updated 2023-10-24) | |
| TEESSIDE, NORTH EAST | |||||
| Existing 333,000 | Port Clarence Energy Plant / "Teesside Renewable Energy Plant", Land at Clarence Works at Port Clarence Road , Port Clarence | Port Clarence Energy Ltd (owned by Vital Energi) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Construction commenced in 2015, but was halted in 2019 when the construction company was dropped [Source]. In April 2023 an application was made to vary the permit to allow the plant to burn RDF (EPR/MP3333WX/V004). In June 2023 it was reported that Womble Energy (linked to CoGen) was taking over this project to convert it to a 350ktpa incinerator (an increase over the previous 333ktpa figure). An updated permit which allows the plant to burn RDF was issued to Port Clarence Energy Limited in January 2024 with a capacity of 333ktpa. It was reported in March 2025 that Vital Energi had purchased Port Clarence Energy Ltd and was taking over the project and that it was understood that a historic structural steel issue had been "completely resolved" [Source]. In November 2025 it was reported that "N+P has signed a 10-year contract to supply Refuse Derived Fuel (RDF) to Vital Energi’s Energy from Waste (EfW) facility at Port Clarence" [Source]. (Entry updated 2025-12-09) | |
| Existing 500,000 | Wilton 11, Wilton International, Middlesbrough | Suez Environment (formerly SITA) and Sembcorp | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | It was reported in June 2018 that the facility was officially opened [Source]. Mass-burn incinerator to burn "around 400,000 tonnes of non-hazardous office and household waste" [Source]. SITA awarded waste management contract by Merseyside Recycling and Waste Authority on the 30th of May 2013: "The 30-year contract covers the annual treatment of 430,000 tonnes of municipal waste collected from six local authorities: Liverpool, Knowsley, St Helens, Wirral, Sefton and Halton..." [Source]. (Entry updated 2019-06-06) | |
| Potential 200,000 | North East Energy Recovery Centre (Line 6), Haverton Hill Road, Billingham, Teesside | Suez Environment (formerly SITA) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | It was reported in September 2018 that "SUEZ is currently in the process of procuring an EPC contractor to build the new facility and it is anticipated that it will become operational in 2022" [Source]. Incinerator intended to treat household and business waste [Source]. Lines 1-3 are the Teesside Energy-from-Waste Facility, and Lines 4 and 5 are the North East Energy Recovery Centre. No sign of Line 6 enter construction as of February 2026. (Entry updated 2026-02-25) | |
| Potential ~1,000,000 | Lighthouse Green Fuels Project SAF Plant, Land at Port Clarence, near Stockton‐on‐Tees | Lighthouse Green Fuels Limited / alfanar Energy Ltd | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In February 2026 confirmed that they had yet to receive a permit review against the 2019 BAT Conclusions and so waste combustion is not yet permitted as this site. In October 2022 the Applicant applied for a direction from the Secretary of State that their proposed gasification facility to produce aviation fuel ("SAF") would be considered a proposal for an NSIP [Source]. Following this, in October 2022 the Secretary of State designated the proposa as an NSIP. In December 2022 it was announced that this project had been awarded Government funding from the Advanced Fuels Fund and it was claimed that the plant would use "black bag waste" and "gasification and Fischer-Tropsch technology", and that "the plant is expected to be operational in 2028 and produce 86.6 kt/y of SAF when at full operational capacity" [Source]. The development could be related to 23/0437/PICON registered in July 2023 but as of 29 August 2023 the name of the applicant had yet to be listed. In February 2026 Lighthouse Green Fuels posted an article stating that "Teesside...is moving from design into delivery" with "Front-End Engineering Design (FEED) close to completion and development consent progressing, the project is currently the most advanced second-generation SAF project in the UK", explaining that second-generation SAF meant their plant "converts solid biogenic waste and residues into fuel" and that "Second-generation SAF depends on sustainably-sourced biomass" such as forestry, sawmill and agricultural residues, and discussing the potential for carbon capture (Source). (Entry updated 2026-02-25) | |
| CARLISLE, NORTH WEST | |||||
| Potential 15,000 (Tyres) | Heathlands Tyre Pyrolysis Facility, Kingsmoor Park, Heathlands Industrial Estate | Canigou PTD Ltd | Carlisle Residents Against Incinerator (CRAIN), Rockcliffe and District Action Group, and Sustainable Carlisle | A proroposed D10 (disposal) tyre pyrolysis facility intended to treat granulated waste tyres to produce syngas, pelletised char, and pyrolysis oil. Classified as a Small Waste Incineration Plant (SWIP). Permit consultation held by Cumberland council in July 2024 [Source]. The December SWIP permit application stated that a planning application will be submitted to Cumbria County Council and that pre-application discussions have taken place. (Entry updated 2024-08-22) | |
| Potential 24,000 | Embedded Advanced Thermal Treatment and CHP Plant, Land adjacent to former Unit D, Kingmoor Park Rockcliffe Estate, Rockcliffe | North West Recycling / North West Regeneration Ltd | Carlisle Residents Against Incinerator (CRAIN) and Rockcliffe and District Action Group. Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning application for "Establishment of an Energy from Waste facility comprising of a Solid Recovered Fuel (SRF) fed Gasification Plant with a 20m high flue stack and associated synthetic gas fuelled Combined Heat & Power (CHP) generation engines..." submitted in November 2023 to Cumbria County Council (1/23/9005). The latest application amends the stack height to 23m. Planning Statement refers to "ETGAS Gasifier Units". Briefing Note from the Applicant states: "Due to the nature of the operations, the processes will require to be regulated either by the Local Authority as a Schedule 13A Small Waste Incineration (SWIP) Process or the Environment Agency (EA) as a Bespoke Waste Installation under Part A(1) Section 1.2(g) Combustion Activity of the Environmental Permitting Regulations (EPR regulations) dependent on scale". Section 1.2(g) relates to "Activities involving the liquefaction or gasification of other carbonaceous material". Planning application 1/23/9005 was refused by Cumberland Council in June 2025, with the applicant having lodging an appeal in December 2025. Campaigners are receiving support from a barrister to participate in the inquiry [Source, Source]. The hearings are due to begin on 2nd June 2026 and the appeal documents are on the Council website's appeal tab (3377058, 1/23/9005). (Entry updated 2026-02-25) | |
| CHESHIRE, NORTH WEST | |||||
| Existing 500,000 | Protos Energy Recovery Facility, Ince Marshes / Protos | Encyclis | CHeshire Anti-Incinerator Network (CHAIN) | It was reported in December 2020 that financial close had been reached [Source]. Entered construction in Decmber 2020. Was expected to be operational in 2024, but as of July 2025 it was reported that following delays construction was due to be completed in 2026 [Source, Source]. The facility benefits from Track-1 CCUS funding from the UK Government. Enclyclis completed their acquisiton of Biffa's share in the plant in June 2025 [Source]. The site has permission for 600ktpa, but the current limits capacity to 500ktpa. Planning application submitted to Cheshire West and Chester Council in July 2016 and approved in November 2016 (16/03074/FUL) [Source]. In May 2016 joint venture between Peel and Covanta was announced "with construction anticipated to start as early as 2017" [Source]. Planning consent for a 600,000 tonne RDF fluidised-bed incinerator was granted in August 2009 along with outline planning permission for a "ReSource Recovery Park" [Source, Source]. The RDF incinerator was issued an Environmental Permit back in December 2006. In October 2011 an environmental permit application was made to increase the incinerator capacity to 850,000 tonnes, change the technology to moving grate incineration and change the operator from Peel to Covanta [Source]. Permit EPR/LP3132FX/V007 issued in January 2023. In July 2025 it was reported that Encyclis had bought out Biffa's shares [Source]. In November 2025 the Environment Agency issued a permit for carbbon capture at the plant (EPR/LP3132FX/V010). According to the permit, electricity export with Carbon capture will be about 54% of what it is without Carbon capture: "The Installation will generate up to 415,200 MWh of electricity, with up to 375,000 MWh being exported while the CC plant is not in operation. The Installation will generate up to 300,400 MWh of electricity, with up to 203,000 MWh being exported when the CC plant is in operation". It was announced in March 2026 that hot commissioning had begun [Source]. (Entry updated 2026-04-20) | |
| Existing 685,000 (consented) and 728,000 (proposed) | Lostock Sustainable Energy Plant (LSEP), Lostock Works Site, Griffiths Road, Lostock Gralam, Northwich | FCC / CIP | CHeshire Anti-Incinerator Network (CHAIN) and Breathe Clean Air Group (BCAG) and Sustainable Northwich | In December 2022 the application to increase capacity from 600ktpa to 728ktpa was refused by the Secretary of State, but it was reported that the plant was under construction and expected to be fully operational "by the end of 2025", however in August 2024 local campaigners informed us that the facility was not now expected to become fully operational until early 2026 [Source]. In March 2019 it was reported that the facility had reached financial close in a deal where Copehenhagen Infrastructure Partners (CIP) would own 60% and FCC 40% and that the facility was scheduled to begin operations in Autumn 2023 [source]. Planning permission granted by DECC in October 2012 [Source, DECC project page]. Cheshire Proposal for a "power generating station" to manage "pre-treated municipal solid waste ("MSW"); commercial and industrial ("C&I") waste; solid recovered fuel ("SRF"); and biomass" [Source (PDF)]. Permit granted January 2014 [Source]. In April 2017 it was reported that Tata were undertaking the discharge of planning conditions [Source] and in October 2017 it was reported that clearing work had begun on the site [Source]. In August 2018 it was reported that Tata was applying for a permit variation to BEIS to increase gross electrical output from 60MW to 90MW, and this was issued in December 2022. In May 2024 the Environment Agency issued a Draft Decision Document increasing the capacity from 600,000 to 685,000 tonnes per year (EPR/WP3934AK/V004). This variation to increase capacity was confirmed in June 2024. In June 2026 LSEP Ltd announced their intention to submit an application under S36C of the Electricity Act to vary the existing consent to "enable the plant to process more waste" which is expected to be submitted to DESNZ "in late 2026", with a pre-submission consultation running until 21 July 2026, and noted that "we expect it [the incinerator] will reach full operation in the first half of 2027" [Source]. The consultation page states that this will involve increasing the maximum capacity to 728,000 tpa [Source]. (Entry updated 2026-06-30) | |
| Existing 100,000 | Ellesmere Port Incinerator, Bridges Road, Ellesmere Port, Wirral | Veolia ES Cleanaway (UK) Limited | CHeshire Anti-Incinerator Network (CHAIN) | Permitted to incinerate a wide range of hazardous and non-hazardous wastes. (Entry updated 2010-11-25) | |
| Existing 1,100,000 | Runcorn EFW Facility, Picow Road Farm, Weston Point, Runcorn | Ineos Chlor (Invoyn), Viridor / KKR and John Laing | CHeshire Anti-Incinerator Network (CHAIN) and Halton Action Group Against The Incinerator (Halton Breathe/HAGATI) | Began commissioning in March 2014, followed shortly by a serious incident involving lime spillage [Source]. Two further incidents occurred in November 2014 [Source, Source]. BERR granted planning permission for the facility by in September 2008 [Source]. Possibly the biggest incinerator of its type in Europe. Issued an environmental permit in May 2011. Developer varied planning consent to increase quantity of RDF allowed through the road from 85,000ktpa to 480ktpa. Permit EP3731XL issued in May 2011. Project received a £182m loan from the European Investment Bank in 2009 [Source]. In May 2017 the Greater Manchester Waste Disposal Authority announced plans to cancel the contract that was relied on for feedstock for the plant [Source]. Planning application to increase capacity to 1.1 million tonnes submitted in August 2017 and approved in February 2019 (18/00417/S72), and associated permit applicaion approved in March 2019 (EPR/RP3638CG/V005). In April 2021 it was reported that legal proceedings had been issued against Viridor on behalf of 196 householders "for the various alleged emissions from the plant which include noise, dust, smells and steam" [Source]. In April 2023 the Environment Agency announced a consultation on their draft decision to allow for up to 10% (110,000 tonnes per annum) of the feedstock to be mixed municipal waste (rather than RDF), and this was granted in May 2023. In July 2025 the Environment Agency issued a permit consultation for the Runcorn carbon capture facility (EPR/QP3724SE/A001). (Entry updated 2025-07-31) | |
| Potential 600,000 | Fulcrum NorthPoint, Essar, Stanlow Manufacturing Complex, Ellesmere Port | Fulcrum BioEnergy | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In January 2023 Fulcrum BioEnergy was awarded Advanced Fuel Fund support to develop a waste-to-aviation fuel (SAF) plant. According to media reports the facility is due to come on-stream in 2027. (Entry updated 2023-08-29) | |
| Potential 175,000 (RDF and Waste Wood) | Bio-Substitute Renewable Fuels Facility / "Protos Energy Hub", Protos, Grinsome Road, Ellesmere Port | Peel Environmental and Progressive Energy | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning application for a gasification-type incinerator to treat waste wood and RDF and convert it into transport fuels was approved in November 2019 [Source, Source] (Planning reference 18/04671/WAS). It was reported in March 2019 that a planning had been submitted for a gasification facility intended to convert RDF and Grade B and C Waste Wood into a gas for possible injection in to the Grid [Source]. Planning permission18/04671/WAS approved in March 2022. It was reported in February 2024 that "construction work is yet to be confirmed on a bio-substitute natural gas renewable fuels facility" [Source]. As of August 2024 the project was not listed by the developer as an active project [Source]. (Entry updated 2024-08-22) | |
| GREATER MANCHESTER, NORTH WEST | |||||
| Existing 128,000 | Bolton Thermal Recovery Facility / "Bolton Incinerator", Raikes Lane, Bolton | Suez | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | This incinerator was temporarily shut down due to a fire in September 2017 [Source]. It was reported in November 2018 that the plant had experienced "a significant number of temporary shutdowns" since it re-opened in July 2018 [Source]. (Entry updated 2019-06-06) | |
| LANCASHIRE, NORTH WEST | |||||
| Potential 24,000 (pelletised SRF) | Burnley gasification plant, land at Hapton Valley Transfer Station, Envirofuels site, Hapton Valley Estate, Accrington Road, Burnley | ETGAS Burnley Ltd | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning permission for a SRF gasification plant was approved by Lancashire County Council in November 2023 (LCC/2023/0024). The facility would be permitted as a SWIP. (Entry updated 2023-11-29) | |
| Potential c. 1,000 tpa of low and intermediate-level radioactive material | Bulk Processing Unit, Clean Energy Technology Park, near the Sprinfields nuclear fuel production installation, Station Road, Salwick, Preston | Perma-Fix / Westinghouse | Radiation Free Lakeland | Announced in March 2022 as a "refractory lined oven" called a "Bulk Processing Unit (BPU)" intended to treat "a wide range of low and intermediate-level radioactive material" [Source]. In April 2022 the Environment Agency stated: "The Environment Agency has been approached by Westinghouse UK and Springfields Fuels Limited to discuss the potential for a Perma-Fix waste treatment facility to be constructed and operated at the Springfields site. We have provided advice and guidance on the permitting requirements for such a facility, and the information that would need to be submitted to us in order to proceed with a permit determination. At this early stage, we have not had sight of detailed design proposals for the facility and we have not been given an indication of when a permit application could be submitted." [Source]. No sign of a planning or permit application as of August 2024. (Entry updated 2024-08-22) | |
| Potential 120,000 | Thornton Energy Recovery Centre (TERC), Hillhouse Business Park, Thornton-Cleveleys | Sesona Ltd | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | The planning application was submitted January 2023 (LCC/2023/0003), with further ecological and noise information published in July 2023. According to the application: "The TERC would generate electricity by way of an Organic Rankine Cycle (ORC) which would be driven through the combustion of up to 120,000 tonnes per annum (tpa) of residual waste / RDF". Environmental permit application launched by the Environment Agency in July 2023, with the permit issued in March 2024 (EPR/ZP3329SS/A001) . In April 2024 the Council resolved to approve the planning application (LCC/2023/0003) subject to a legal agreement to secure highway improvements and biodiversity enhancements and this position was confirmed in July 2025 when the application was reconsidered by the Planning Committee in light of the Defra Capacity Note. As of 16 January 2026 the planning permission has yet to be formally issued as the Section 106 agreement has yet to be signed. (Entry updated 2026-01-16) | |
| MERSEYSIDE, NORTH WEST | |||||
| Existing 260,000 | Hooton Park Sustainable Energy Facility / "Hooton Bio Power", Hooton Park, North Road, Eastham | CoGen / Aviva | Wirral Council and Eastham Village Preservation Association | Under construction since late 2018. In June 2017 it was reported that CoGen had signed a 15-year 240ktpa feedstock supply deal with Dutch RDF Supplier N+P Group to supply feedstock for the planned facility [Source]. Vote to grant planning permission for a revised gasification plant proposal approved in October 2014 (Ref: APP/14/00314) [Source]. The previous proposal on the site was by Mersey Green Solution Limited (joint partnership between Biossence and New Earth Energy), which was disolved in April 2012 [Source]. Permit application submitted in June 2014 [EPR/YP3039EX/A001] and issued in December 2015 [Source]. In October 2019 Hooton Bio Power Limited applied for a permit variation to change the gasification technology to Kobelco and this was approved in April 2021 (EPR/CP3733QJ/V0002). In May 2023 it was reported that the plant will be fully operational by Summer 2023 [Source]. (Entry updated 2023-05-25) | |
| Potential 60,000 (RDF) | Southport EfW Plant, Southport Hybrid Energy Park | Eqtec and Rotunda Group (and its subsidiary Shankley Biogas) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In September 2020 it was reported that Eqtec had signed a co-development agreement with Rotunda Group and Shankley Biogas for the Southport Hybrid Energy Park project, which was said to be a gasification plant to treat "more than 55,000 tonnes of RDF" [Source]. The proposed site is the site of Southport Skip Hire (55 Crowland Street, Southport) which is where Iona Capital Ltd obtained a mix of full and outline permission for 80,000tpa of Anaerobic Digestion, Waste Transfer Station and biomass boiler capacity from Sefton Council in 2016 (ref DC/2016/00534). According to a July 2022 Fact File from Eqtec, by June 2022 they were co-developer and gasification technology provider of the project, working closely in partnership with Rotunda Group and its subsidiary Shankley Biogas at Watts Industrial Estate, Southport Hybrid Energy Park, Merseyside, UK, and had "selected Wood as our technology partner for design and deployment of a ...waste-to-hydrogen solution during Phase 2 development of the multi-technology project" [Source]. A project page last updated in September 2022 indicated that they had yet to reach financial close [Source]. (Entry updated 2024-08-22) | |
| WEST LANCASHIRE, NORTH WEST | |||||
| Potential 3,650 (hazardous waste) | Simonswood Incinerator | Culzean W2E Ltd | Stop the Simonswood Incinerator (Facebook Group) | Planning application for a medical waste incinerator submitted to Lancashire County Council in January 2022 (LCC/2022/0003). Planning committee voted to approve the planning application (LCC/2022/0003) in December 2022, but as of August 2024 no section 106 had been agreed. (Entry updated 2024-08-22) | |
| ANTRIM AND NEWTONABBEY, NORTHERN IRELAND | |||||
| Potential 4,650 | 6A Caulside Drive, Newpark Industrial Estate | McQuillan | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning application LA03/2023/0131/F for a "thermal recovery building" approved in April 2024 - according to the report feedstocks would include "pharmaceutical waste, oil sludge, paint/adhesives, rags/wipes, polymer waste, laboratory smalls/solid toxic solvents and various liquid solvents" [Source, See planning page]. (Entry updated 2024-04-16) | |
| ARMAGH CITY BANBRIDGE AND CRAIGAVON, NORTHERN IRELAND | |||||
| Potential 7,728 | Combined Heat & Power Thermal Treatment System, 113 Milltown Road, Tullymore Otra, Milltown, Armagh (near Benburb) | AIC Group | Residents Against Incineration [FB Page] | A pre-application "community engagement meeting" was held in December 2025 for a proposed small waste incineration plant (SWIP) intended to treat a mix of hazardous (10-15%) and non-hazardous (85-90%) waste from Northern Ireland [Source]. A revised Pre-Application Notification was approved in March 2026 to hold a drop-in event on 1st May 2026 and a webpage to be live for at least 28 days. As of 30 June 2026 the PAN webpage is no longer online. (Entry updated 2026-06-30) | |
| BELFAST, NORTHERN IRELAND | |||||
| Existing 144,000 | Full Circle Generation EfW, 7 Airport Road, Belfast Harbour Estate | Full Circle Generation Ltd ("consortium of equity investors including RiverRidge Energy Limited, UK Green Investment Bank plc (GIB), Equitix and P3P Partners") / Bouygues | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Gasification-type incinerator to burn RDF from Commercial and Industrial waste. Granted planning permission in January 2014 [Source] [Application ref: Z/2012/1387/F]. It was reported in November 2015 that the plant "will be fully operational by late 2017" [Source] Permit reference P0446/14A [See entries on NIEA website, See documents from an information request]. Accoding to Tolvik, the plant entered commissioning in Q3 2015 as of December 2019 the plant had still not come out of commissioning [Source]. Not to be confused with the nearby Shorts Bombardier facility at 3 Airport Road (permit P0135). (Entry updated 2020-05-29) | |
| CO ANTRIM, NORTHERN IRELAND | |||||
| Potential 314,000 (pre-treated mixed waste and biomass such as waste wood) | Kilroot Multi Fuel CHP Facility, Lands at Kilroot Power Station, Station Road, Carrickfergus | EP Kilroot Ltd (subsidiary of EP UK Investments) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning application received in April 2021 and granted in May 2022 (LA02/2021/0439/F). It was reported in May 2022 that "it is anticipated that the facility will be up-and-running by the end of 2025" [Source]. Various planning conditions were discharged in 2023 and 2024, including the Final (Contractors) Construction Environmental Management Plan (CEMP) which was approved in February 2024. The Construction Traffic Management Plan from May 2024 which is a supplement to the CEMP (LA02/2024/0152/DC) states that: "The proposed construction programme is expected to take 3 years. It is anticipated that construction will commence in Q4 2024". In April 2025 EPUKI implied that they have yet to enter construction and yet to secure waste contracts, stating that while "all pre-commencement planning conditions have now been discharged" that "comprehensive engagement with construction partners is ongoing", that "we are already in the process of securing waste contracts", and that the EPUKI "look forward to moving on to the next phase and the facility being operational in 2028" [Source]. As of December 2025 no announcement has been made that full construction has begun. (Entry updated 2025-12-09) | |
| COUNTY ANTRIM, NORTHERN IRELAND | |||||
| Potential 211,000 nominal capacity (wider site has capacity for 300,000 of up capacity to be split between MBT and EfW) | Hightown Quarry, Boghill Road, Mallusk, Newtonabbey, nr. Belfast | Arc21 / Becon Consortium (E.ON) | NARC21 (No-ARC21), Friends of the Earth Northern Ireland, Green Party, Residents Against the Hightown Incinerator, Sinn Fein | Direct combustion incinerator intended to burn RDF and untreated waste. Planning application currently under consideration again following a complex legal history (T/2014/0114/F). Updated Planning Statement and Environmental Statement Addendum submitted in April 2025. In September 2025 DAERA announced that "New information received from the applicant, consultation responses and representations will be published here on the Planning Register" and set out the position of various public bodies. On 6 March 2026 the Department for Infrastructure wrote to the applicant in a 49-page letter asking for additional information, setting out queries from various DAERA departments, with the applicant being given 3 months to submit a response [Source]. The proposal has a long history: Granted planning permission in September 2017, but a successful legal challenge was brought by NoArc21 in November 2017 and the decision was quashed by the High Court in May 2018 and this quashing was upheld by the Court of Appeal in July 2018 [Source, Source, Source]. Planning application submitted March 2014, refused September 2015 by the Environment Minister, and appealed to the Northern Ireland Planning Appeals Commission in October 2015 (T/2014/0114/F) [Source]. Proposals were announced in March 2013 as part of the arc21 Residual Waste Treatment Project (Source). arc21 is "the umbrella waste management group for 11 councils in the east of Northern Ireland". Planning permission was refused by the Infrastructure Minister for Northern Ireland in March 2021 [Source]. In May 2023 Northern Ireland's High Court quashed the refusal, meaning the planning application was "remitted back to the Department for the decision to be retaken" [Source, Source]. (Entry updated 2026-04-20) | |
| ABERDEEN, SCOTLAND | |||||
| Existing 150,000 | NESS Energy Project, Greenbank Crescent, East Tullos | Suez (Interim operator) working for Aberdeen City Council and Aberdeenshire and Moray Councils | Concerns have been raised by Torry Community Council, Kincorth and Leggart Community Council and Nigg Community Council. Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | According to SEPA, the plant was commissioned and fully operational from the 6th of October 2023. Aberdeen City Council granted planning consent in October 2016 (P160276). It was reported in August 2019 that the 156m GBP contract to build the incinerator was awarded to a consortium led by Acciona and would be operated by Indaver [Source, Source]. In April 2021 it was reported that plans had been lodged to build an incinerator bottom ash (IBA) storage and processing facility at Cairnrobin, close to Portlethen, to be used for IBA produced by the incinerator [Source]. A permit for the incinerator was issued by SEPA in May 2022 (PPC/A/1186430). According to SEPA, the facility became operational from October 2023. Indaver publish some emissions data via a Google spreadsheet (see data). In July 2025 it was reported that Indaver was in dispute with sub-contractor Acciona and that the incinerator was not currently operating. In August 2025 it was reported that Indaver withdrew from the North East Scotland Shared (NESS) Energy-from-Waste (EfW) project and that the incinerator was expected to soon restart full operations [Source]. In December 2025 it was reported that the incinerator had closed for the second time in six months, with Suez as the interim operator [Source]. See public register for permit documents. (Entry updated 2026-02-05) | |
| ABERDEENSHIRE, SCOTLAND | |||||
| Potential 200,000 | Inverurie Energy Plant / "Thainstone Energy Plant", Paper Mill Building, 4 Kirkwood Commercial Park, Thainstone, Inverurie | Agile Energy | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning application approved by Aberdeenshire Council on 25 June 2021 (ref APP/2020/1324). No sign of an environmental permit application as of mid-March 2024, indicating that the project might be stalled. Was previously the site for Kirkwood Homes Investments Ltd 's proposal for a "Small scale" plasma gasification incinerator intended for RDF derived from C&I and MSW back in 2012. The previous proposal was for "alterations and extension and change of use from General Industrial Class 5 (Paper Mill) to Energy From Waste Facility Utilising Plasma Gasification". SEPA stated in April 2024 that no pre-application discussions for a permit had taken place in the past year. IIn May 2024, the Applicant submited a request to delay the discharge requirement of Condition 9 (Landscaping) to allow proposal to be implemented prior to this condition being discharged (APP/2024/0902). This request was subsequently withdrawn, and instead the applicant has applied to discharge the planning condition through the original planning consent. The Council has accepted that development commenced on the site despite the pre-commencement condition for landscape not having been met. (Entry updated 2024-08-06) | |
| DUNDEE, SCOTLAND | |||||
| Existing 153,216 | Baldovie EfW CHP Facility, Forties Road, Baldovie Industrial Estate, Angus (Tayside) | MVV | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | It was reported in June 2016 that MVV Environment were proposing to replace the Derl Baldovie plant with another conventional incinerator in Baldovie [Source]. Planning permission granted in March 2017 for the MVV replacement facility due to become operational in 2020 [Source]. It was reported in June 2018 that construction had begun [Source, Source] and in January 2022 it was reported that the facility had been fully commissioned [Source]. Permit PPC/A/1003157 issued by SEPA in February 2019. In April 2020 it was announced that the operator had: "sought permission from Dundee City Council and SEPA to continue to operate the existing facility alongside the new facility once the latter is completed" [Source, Source]. See public register for permit documents. (Entry updated 2022-03-08) | |
| Existing 160,000 | Baldovie Energy from Waste, Forties Road, Baldovie Industrial Estate, Angus (Tayside) | MVV (previously operated by Dundee Energy Recycling Ltd (DERL)) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | The 20-year old incinerator was originally going to be closed down when a second incinerator became operational on an adjacent plot of land, but the operator stated in April 2020 that "we are confident that it can continue to operate for a further 10 years" and that they had "sought permission from Dundee City Council and SEPA to continue to operate the existing facility alongside the new facility once the latter is completed" [Source, Source]. It was reported in March 2026 that the old incinerator (lines 1 and 2) was to be shut down by Summer 2026 [Source]. According to SEPA, the facility had poor history of license/permit compliance in 2018, 2016 and 2014 [Source]. Dundee Energy Recycling Ltd (DERL) is a special purpose company, formed between BICC plc, Kvaerner Investments and Dundee City Council, under the Private Finance Initiative (PFI). See public register for permit documents. (Entry updated 2026-04-20) | |
| EAST LOTHIAN, SCOTLAND | |||||
| Existing 390,000 | Dunbar EfW / "Oxwellmains EfW", Dunbar Landfill, Oxwellmains, Dunbar | Viridor / KKR | Communities Against Toxics Scotland (CATsScotland) and Incensed Residents Against Toxic Emissions (IRATE) and Green Alternatives to Incineration in Scotland (GAINS) | In July 2022 it was reported that this facility will process waste from Highland Council Highland Council [Source]. Construction work started in July 2015 [Source]. In August 2018 it was announced that the plant had entered hot commissioning [Source]. Granted planning permission in December 2010 following a public inquiry [Source]. Planning condition to limit feedstock to a defined catchment area removed in October 2012 [Source]. It was reported in January 2019 that Interserve and Babcock and Wilcox had handed the facility over to Viridor [Source]. In July 2023 the permitted capacity was increased from 325ktpa to 390ktpa by PPC/A/1032878 VAR01. See public register for permit documents. (Entry updated 2024-03-14) | |
| EDINBURGH, SCOTLAND | |||||
| Existing 189,500 | Millerhill Energy Recovery Centre, Former Millerhill Marshalling Yards, Whitehill Mains Road, Millerhill, Dalkeith, Midlothian | FCC / Vattenfall and Green Recovery Projects (GRP) / ICON | Green Alternatives to Incineration in Scotland (GAINS) | The facility was officially opened in September 2019 [Source]. Planning Permission approved in September 2015 for an incinerator at this site intended to treat household, industrial and commercial wastes [Source, Source]. Planning permission in Principle for an "energy-from-waste facility" of up to 100ktpa on the site was granted in 2011. It was reported in June 2013 that Edinburgh and Midlothian councils intended to purchase electricity at the facility from one of the three potential operators of the site [Source], and FCC was named the preferred bidder in December 2014 [Source]. It was reported in October 2016 that the Green Investment Bank committed £28m of debt finance to the plant, joining a lending club that includes Investec, Siemens Bank and Credit Agricole [Source]. In February 2020 it was reported that heat from the incinerator "is to be used as part of a district heating network for a new town being built on the outskirts of Edinburgh" [Source]. Permit reference PPC/A/1136072. See public register for permit documents. (Entry updated 2020-03-25) | |
| FALKIRK, SCOTLAND | |||||
| Existing 274,000 (RDF) | Earls Gate Energy Centre, Earls Road, Grangemouth | Encyclis / Hargreaves / Earls Gate Energy Centre Ltd | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In February 2024 SEPA informed UKWIN that: "The site is not yet operational and [is] still undergoing commissioning". While the plant was under construction since late 2018, in June 2024 it was reported that commissioning was completed in mid-May 2024 and that the plant was now fully operational [Source]. Planning application granted in January 2017 for MSW and C&I RDF incinerator (P/16/0321/FUL). It was reported in June 2017 that: "Hargreaves has signed a Memorandum of Understanding to develop the project in partnership with the Green Investment Bank, which is expected to take a 50 per cent stake" [Source]. SEPA received a permit application in July 2017. A permit was issued by SEPA in March 2018 (PPC/A/1157446). In August 2023 it was reported that "Local authority Falkirk Council has revealed it will send its residual waste to the Grangemouth-based Earls Gate EfW plant when it starts up later this summer. The project is jointly owned by Encyclis and infrastructure investor Brockwell Energy and according to the council is due to become 'operational in late summer 2023". In November 2023 it was reported that the facility had entered commissioning in October 2023 was expected to be fully operational in 2024. In January 2025 it was reported that Brockwell Energy intended to add carbon capture to this facility [Source, Source]. See public register for permit documents. (Entry updated 2025-03-05) | |
| Potential 176,000 | Avondale, Avondale Quarry, Avondale Road | NPL Group | Friends of the Earth Scotland | In February 2024 it was reported that "the project construction is likely to commence in 2025 and is expected to enter into commercial operation in 2026" [Source]. Full planning permission was granted in November 2020. Avondale Holdings Ltd and Avondale Environmental Limited's 2023 company report submitted in January 2024 states that: "Avondale remains in advanced negotiations to take this project forward and implemented planning permission in late 2023". Implementing planning permission is not the same as building the facility, and typically means doing enough to prevent the permission from expiring. No sign of an environmental permit application as of mid-March 2024. It was previously stated that: "The construction is expected in 2022/2023 and the facility commissioned for use in mid-2024" but there appears to be no sign that any substantial has begun as of mid-March 2024 [Source]. SEPA stated in April 2024 that no pre-application discussions for a permit had taken place in the past year. In September 2025 Avondale Environmental Limited entered administration [Source] (Entry updated 2026-01-16) | |
| FIFE, SCOTLAND | |||||
| Existing 250,000 | Fife Environmental Energy Park / "Westfield Eco Innovation Park", Former Westfield Opencast Coal Site, Kinglassie, Fife | Westfield Energy Recovery Limited (Owned by Viridor and Equitix) and Brockwell Energy | Westfield Action Group and Cardenden Community Council. | In January 2023 it was announced that construction was underway and that the plant is now expected to be operational by May 2025, and that Viridor and Equitix were intending to complete this incinerator after having purchased Westefield Energy Recover Ltd from Brockwell Energy. In November 2024 it was reported that Viridor had started the commissioning process and expected the facility to become operational in 2025 [Source]. In July 2025 the site was was said to have received the first delivery was delivery was waste, implying that the site had entered hot commissioning [Source]. Permit reference PPC/A/1181922. A proposed "conventional combustion plant" to treat c. 238ktpa of waste. In October 2017 the Planning Committee voted to approve the scheme (ref 16/03661/EIA) and it was reported in February 2019 that the scheme had been given the "green light" and that construction was expected in Spring 2019 [Source]. SEPA issued a permit in June 2020 and this was varied in May 2023 and May 2024. A non-material variation to the planning consent was approved in October 2019 (18/02342/NMV1). See public register for permit documents. (Entry updated 2025-07-31) | |
| GLASGOW, SCOTLAND | |||||
| Existing 385,000 | South Clyde Energy Centre, Bogmoor Road, Hillington | Fortum Glasgow (joint venture between Fortum Oyj and Verus Energy) and Gren | Green Alternatives to Incineration in Scotland (GAINS) | In July 2022 it was announced that construction had started on the plant [Source], and in May 2024 the facility was still under construction. Planning permission granted by Glasgow City Council for this RDF-burning incinerator in December 2012 [Source]. It was reported in April 2019 that the facility had been purchased by Fortum and Verus from Peel Environmental [Source]. The facility was bought by Fortum Glasgow in April 2019, and at that time it appears that construction had yet to commence[Source]. In June 2024 it was reported that "half of the project was sold to Gren earlier this month, with reports the utility company could move for the rest of the project and push it forward to construction" [Source]. See public registers #1 and #2 for permit documents. The July 2025 project update newsletter indicates that a significant portion of the construction had been completed [Source]. According to the South Clyde Energy Centre website: "The facility will enter commercial operations by the end of 2026." [Source]. See public register for permit documents. (Entry updated 2025-12-09) | |
| Existing 154,000 | Glasgow Recycling and Renewable Energy Centre (GRREC), Next to the Polmadie Recycling Centre, 425 Polmadie Road | Viridor / KKR and RSM Group AS | Communities Against Toxics Scotland (CATsScotland), Friends of the Earth Scotland, Glasgow Alternatives to Incineration and Green Alternatives to Incineration in Scotland (GAINS) | Site officially opened in August 2019 [Source]. Energos Gasification-type incinerator granted planning permission in January 2013 [Source]. Construction work began in November 2013, but in May 2016 it was reported that construction had been delayed due to "technical issues with the plant" [Source]. Viridor awarded contract by Glasgow City Council in December 2011 [Source, Source]. In November 2016 Viridor "sacked Interserve from the Glasgow job" and in February 2017 it was announced that Babcock would complete the job [Source, Source]. In February 2018 Viridor reported that the gasification process was in "final commissioning" [Source]. Permit reference PPC/A/1110002. See public register for permit documents. (Entry updated 2020-03-25) | |
| NORTH AYRSHIRE, SCOTLAND | |||||
| Existing 180,000 | Oldhall Energy Recovery Facility , 16-20 Murdoch Place, Oldhall Industrial Estate, Irvine, Ayrshire | Doveryard Limited (owned by Octopus Renewables) | Irvine Without Incinerators and Scottish Greens | It was reported in July 2024 that construction was continuing on the site [Source]. Planning permission granted in January 2020 [Source]. Previous planning permission for a 120ktpa gasification unit granted in August 2007. With the collapse of Energos the threat seemed to be lifted. However, in January 2018 Lowmac purchased the site and announced that they were looking for a partner to develop an incinerator [Source]. While Lowmac owns the site, the use of the site for an incinerator is being promoted by Dovetail who ran consultation events in May and June 2019 [Source]. In October 2021 it was announced that Doveyard Ltd had been bought out by Octopus Renewables [Source]. According to the Renewable Energy Planning Database the plant entered construction on the 28th of February 2021 under planning reference 19/00539/PPM [Source]. In March 2023 an application to increase the stack height by 10m was approved by North Ayrshire Council (23/00058/PP). Environmental permit (Ref no. PPC/A/1197167) granted in Novmber 2025. See public register for permit documents. (Entry updated 2025-12-09) | |
| NORTH LANARKSHIRE, SCOTLAND | |||||
| Existing 333,600 | Drumgray Energy Recovery Centre, Greengairs Waste Management Complex | Green Energy Projects Ltd (51% owned by FCC and 49% owned by iCON) | Friends of the Earth Scotland | In September 2022 it was reported that the facility had entered construction and was expected to be operational "in early 2026" [Source]. No recent updates on construction progress on operator website as of mid-March 2024 [Source]. In February 2023 FCC wrote to North Lanarkshire Council to re-discharge planning conditions. The contaminated land aspects of the site investigation were subject to peer review in January 2024, with various concerns raised. As such, it is possible that delays in discharging permit conditions might be delaying the construction. Intended to treat waste from households and businesses. Planning permission was issued in August 2020 [ref 19/01284/FUL]. A permit application was submitted in October 2019 [See SEPA entry]. A permit was issued in June 2021 (PPC/A/1187576). See public register for permit documents. In November 2024 it was reported that this project "is yet to move to full construction, despite FCC previously targeting having the Scotland-based EfW being operational in 2026" [Source]. As of 9th December 2025 the last update on construction status on the FCC website is the 2022 announcement that initial construction works had started at the site, meaning the construction status remains unclear [Source]. (Entry updated 2025-12-09) | |
| PERTHSHIRE, SCOTLAND | |||||
| Potential 85,000 | Binn Eco Park, Binn Farm, near Glenfarg | Binn Group / Iona Capital / Paprec Energies Binn | Communities Against Toxics Scotland (CATsScotland) and Tayside Environmental Action Group and Green Alternatives to Incineration in Scotland (GAINS) | In November 2023 it was reported that Martin GmbH will supply the grate system and that the plant could come online as early as 2026 [Source]. In January 2020 it was reported that the Binn Group intended to apply to vary the proposal to increase the capacity to nearly 85,000 tonnes per annum, and that they were hoping the facility would be operational by 2023 but in February 2021 this was delayed to 2024 [Source, Source]. In April 2020 it was reported that a proposal of application notice (PAN) had been submitted to Perth and Kinross Council [Source]. Permission to increase the capacity was approved in 2020 (20/01242/FLM) [Source]. Sita gained planning permission for a gasification-type incinerator at the site in October 2011 (10/01767/FLM). Supposedly "most of the material processed will be from households, with a small amount of business waste". Sita obtained planning permission for a mass-burn incinerator of the same capacity at the site in 2007 but reportedly had a change of heart regarding the type of thermal treatment [Source]. In March 2022 it was reported that "TIRU is to build and operate a £70 million facility near Perth on behalf of owners Binn Group and investment partners Iona Capital" and that the incinerator would not be operational before late 2024 at the earliest [Source]. In August 2023 it was reported that "Local authority Perth & Kinross Council awarded a £50m residual waste treatment contract to Paprec Energies Binn Ltd" for this incinerator. In April 2024 SEPA informed UKWIN that: "EfW plant is currently in the early stages of construction at Binn Eco Park however an application for a new PPC Permit has not yet been submitted to SEPA. On contacting the site operators over the last week, they have stated that an application is imminent". However, in October 2024 it was reported that Paprec had "been forced to dramatically halt work at its Scotland-based build due to a delay in securing grid connection" and that it was unclear when development would resume [Source]. In December 2025 it was reported that plans for the incinerator were "disarray" and that "Perth and Kinross Council has scrapped a £50m contract to send non-recyclable household waste to a controversial incinerator plant", with Perth and Kinross Council describing the move as a "mutual termination of the current contract" [Source, Source, Source] (Entry updated 2026-01-16) | |
| SHETLAND ISLANDS, SCOTLAND | |||||
| Existing 24,999 | Peak Load Boiler Station, Gremista, Lerwick | Shetland Heat Energy & Power Ltd | Communities Against Toxics Scotland (CATsScotland) | The incinerator burns domestic and commercial waste from Shetland, Orkney and from the offshore oil industry. See public register for permit documents. (Entry updated 2020-03-25) | |
| SOUTH LANARKSHIRE, SCOTLAND | |||||
| Existing 131,000 | Gladsmuir Resource Recovery (previously "Levenseat ACT"), Levenseat Waste Management Site, By Forth, Lanark | Gladsmuir Operations Limited / Cobalt Energy / Beaverbrook Energy (taking over from Levenseat Renewable Energy Ltd) | Green Alternatives to Incineration in Scotland (GAINS) | Gasification-type incinerator granted planning permission by West Lothian Council in June 2013 (ref. LIVE/0424/FUL/13), with original consent granted in December 2010 (ref. 0528/FUL/10). Permit application submitted in December 2014 for a "fluidised bed close-coupled gasification plant" to treat RDF, a variation on the previous permit granted in July 2009 that seemingly proposed to use the same technology that failed in Dargaval (Source) [See public register for permit PPC/A/1150156]. Received £28m of funding from the GIB in March 2015 [Source]. In April 2020 the operator stated that "Hot commissioning is going well and we expect to finish by the end of the year [i.e. 2020]". A spokesperson for BIG stated in February 2022 that: "A defect was identified with the refractory lining, with replacement works being completed in December 2021". In May 2023 it was reported that Outotec was no longer part of the project and that LREL would be bringing operations in-house [Source]. In May 2025 PWC announced that "It is with deep regret that 52 of the 89 employees [at Levenseat Renewable Energy] had to be made redundant immediately on appointment" and that "The administrators will retain some employees to support in winding down operations and clean-up of waste materials on site" [Source]. STV reported that: "In recent years, the company has experienced outages due to machine failures which required significant funding to fix" but that the company was unable to "secure crucial investments" in advance of the June 2025 debt repayment deadline [Source]. LREL is not to be confused with Levenseat Resource Management (LRM) which has assured investors and employees that things are "business as usual" for their operations and they have not entered administraiton [Source]. In July 2025 it was announced that Cobalt Energy would be taking over operation and maintenance of the plant [Source]. See public register for permit documents. (Entry updated 2025-07-31) | |
| BERKSHIRE, SOUTH EAST | |||||
| Existing 464,280 | Lakeside Energy from Waste Incinerator, Colnbrook, Slough | Lakeside Energy From Waste Limited (S Grundon Waste and Viridor/ KKR) | Slough’s Anti-Incinerator Network (SAIN) and The Air That We Breathe Group (TATWBG) | Opened in October 2010 [Source]. In January 2025 the UK Government confirmed their plan to proceed with a third runway at Heathrow, and previous work indicated this would require the Lakeside incinerator to be replaced at a different location [Source]. A location land west of the Iver South Sludge dewatering Centre and south of the M4 motorway was previously proposed as the replacement site (see separate entry), but it has yet to be confirmed whether this remains the preferred alternative site. The permit was updated in May 2021 (EPR/BT7116IW/V006) to incinerate more than 1.5% hazardous waste ("up to 6,900 tonnes of contraband tobacco waste and 13,800 tonnes of clinical waste per annum") [Source]. (Entry updated 2025-05-30) | |
| Existing 525,000 | Slough Multifuel, 342 Edinburgh Avenue, Slough Trading Estate, Slough | Slough Heat and Power Ltd (SSE and Grundon) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In October 2018 SSE stated that they had begun decomissioning work for their old Combined Heat and Power Plant and that they had obtained planning permission for it to be replaced with a "new Multifuel facility" [Source]. In 2018 they expected construction works to commence in 2019 and to continue for approximately 3 years. According to the SSE website: "The facility will produce electricity and heat through burning waste-derived fuels made from various sources of municipal solid waste, commercial and industrial waste, and waste wood" [Source]. In April 2020 it was announced that SSE had sold a 50% stake in the project to Copenhagen Infrastructure Partners [Source]. A permit for the plant was issued 2016 (EPR/CP3031SX). In September 2020 a permit variation application was submitted (EPR/CP3031SX/V005) to increase capacity to 480,000tpa and it was stated that the facility was under construction. It was announced in August 2021 that "Main construction work began in May 2021 and is expected to be completed in 2024" and confirmed the 480ktpa capacity [Source]. In November 2023 the Secretary of State granted development consent for the application to increase the thermal of the plant from 50 to 60 MW gross output (See NSIP page). Permit varied in December 2023 to allow co-incineration hazardous waste wood. In August 2024 it was reported that the facility was fully operational [Source]. It was reported in October 2025 that it is understood that: "developers SSE and Copenhagen Infrastructure Partners (CIP) are looking to sell the facility in Berkshire, a year after the plant became operational" [Source]. In February 2025 a permit variation was issues which "authorises the operator to increase annual fuel throughput of the plant from 480,000 tonnes per year to 525,000 tonnes per year, due to increased annual boiler availability" (EPR/KP3702MY/V003) (Entry updated 2026-06-30) | |
| Potential 440,000 | Lakeside Energy from Waste (Replacement), Land west of the Iver South Sludge dewatering Centre and south of the M4 motorway, Colnbrook, Slough | S Grundon Waste and Viridor / KKR | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In January 2025 the UK Government confirmed their plan to proceed with a third runway at Heathrow, and previous work indicated this would require the Lakeside incinerator to be replaced at a different location [Source]. A site on land west of the Iver South Sludge dewatering Centre and south of the M4 motorway was originally announced as the replacement site in February 2019 and this was subject to both a planning application (P/17826/000) and a permit application (EPR/PP3330QY/A001), but in October 2019 it was reported that "the intended site for Lakeside Energy interferes with its plans for a Heathrow rail link". Specifically: "Network Rail warns that the incinerator would interfere with a ventilation shaft and building for the tunnel, and states that the site will have to be redesigned". In August 2020 it was reported that the application had been withdrawn due to successful legal action against the third runway [Source]. However, it is possible that a new re-worked proposal on this site might be submitted in the future. (Entry updated 2025-05-30) | |
| BUCKINGHAMSHIRE, SOUTH EAST | |||||
| Existing 345,000 | Greatmoor EfW, Lower Greatmoor Farm, Edgcott, Aylesbury (near Calvert) | FCC (Formerly Waste Recycling Group) and Green Recovery Projects (GRP) / ICON | Wycombe Labour for a Green New Deal and Buckinghamshire Residents Against Incinerators (BRAINS) and Bucks Environmental Strategy for Treating Waste (BestW) | The facility was reported to have taken its first waste load in February 2016 and was reported to be fully operational in July 2016 [Source, Source]. The planning committee resolved to grant permission on 20th April 2012 (ref 11/20000/AWD, submitted February 2011) [Source]. WRG/FCC were named as the preferred bidder in November 2010 for Buckinghamshire County Council’s Waste PFI and included the Aylesbury site in their bid. The 30-year contract to build and operate the facility was awarded to FCC in July 2012 [Source]. (Entry updated 2020-09-17) | |
| EAST SUSSEX, SOUTH EAST | |||||
| Existing 242,000 | Newhaven Incinerator, North Quay, Newhaven | Veolia ES South Downs Ltd | Defenders of the Ouse Valley and Estuary (DOVE) and Lewes District Friends of the Earth | The facility is currently operational [Source]. Conditional planning permission was granted and works started in April 2008 following "years of legal challenges" [Source]. In October 2014 Veolia requested for the planning condition be varied to remove the catchment boundary restriction for waste being brought to the facility [Application LW/748/CM]. (Entry updated 2016-06-09) | |
| HAMPSHIRE, SOUTH EAST | |||||
| Existing 110,000 | Integra North Energy Recovery Facility / "Basingstoke Incinerator", Whitmarsh Lane, Reading Road, Chineham, Basingstoke | Veolia ES Hampshire Ltd | The Basingstoke Burner Action Campaign (BBAC) and New Forest Friends of the Earth | (Entry updated 2019-06-06) | |
| Existing 220,000 | Marchwood Incinerator / "Integra South West ERF", Oceanic Way, Marchwood Industrial Park, Marchwood, Southampton | Veolia ES Hampshire Ltd | New Forest Friends of the Earth | (Entry updated 2019-06-06) | |
| Existing 220,000 | Portsmouth Incinerator / "Integra South East ERF", Quartremaine Road, Copnor, Portsmouth | Veolia ES Hampshire Ltd | New Forest Friends of the Earth | (Entry updated 2019-06-06) | |
| ISLE OF WIGHT, SOUTH EAST | |||||
| Existing 44,000 (RDF) | Forest Park, Forest Road, Newport | Veolia and Isle of Wight Council (using Michaelis technology) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In August 2018 it was announced that building works were "substantially completed" with commissioning due to start in September 2018 with the facility expected to be fully operational by Summer 2019 [Source]. In May 2017 plans were announced for a "moving bed incineration" plant [Source]. However, in November 2019 delays were reported meaning the plant was not expected to be operational before the spring of 2020 [Source]. Planned to replace an Energos gasification facility on the same site that was permitted to burn RDF and clean wood waste. That gasification plant entered commissioning in 2008 but never worked reliably [Source]. It was a Demonstrator project related to the upgrading of an existing waste incinerator [Source] and it was reported in June 2017 that: "Plans to refurbish the Forest Road...gasification plant have been shelved" because the Council was unable to find another contractor after Energos went into administration [Source]. In November 2017 permit EPR/QP3337AD/V003 was issued for an incineration plant to burn RDF [Source]. The BEIS 2020 Q1 Heat Networks Pipeline Report associates this incinerator with a proposed heat network [Source]. In June 2021 it was reported that the facility was on track to become fully operational by the Summer of 2021 [Source]. It was reported in May 2022 that the plant was returned to hot commissioning after problems had been found, and that handover could occur as early as July 2022 [Source]. In February 2024 it was reported that the facility "has completed hot commissioning several years behind schedule and is now in the 'final testing stage'" [Source, Source]. In December 2025 it was reported that "Veolia is set to take over the provision of waste collection and disposal services on the Isle of Wight following Thalia Waste Management’s decision to walk away from its £225million contract with the Isle of Wight Council" and that the facility "came online at the start" of 2025 [Source]. It was announced on the 13th of April that Veolia will "operate and maintain the Council’s waste infrastructure, including the Energy Recovery Facility and Materials Recovery Facility" in conjunction with Isle of Wight Council [Source] (Entry updated 2026-04-20) | |
| KENT, SOUTH EAST | |||||
| Existing 657,000 | Kemsley Sustainable Energy Plant / "K3 CHP", DS Smith Paper’s site, Kemsley Mill, Sittingbourne | E.On, efinium and DS Smith | Pinkham Way Alliance | SRF-burning incinerator. In February 2021 the Business Secretary granted permission to increase capacity from 550ktpa to 657ktpa [Source]. E.ON/Wheelabrator’s bid was to build an incinerator at a facility which would also take material from the nearby mill [Source]. Initial planning permission for the facility was granted in September 2011 [Source]. After Veolia pulled out, E.ON/Wheelabrator was the remaining bidder for the North London Waste Authority contract to manage 250,000-300,000 tonnes of anticipated municipal waste [Source]. The previous NLWA procurement was through PFI but funding was withdrawn by the Government in October 2010 [Source]. NLWA procurement abandoned in September 2013 [Source]. Allocated Round One Contracts for Difference funding in February 2015 [Source]. The project was financed with an 18 year loan from the GIB and others [Source]. Permit SP3431KJ issued in July 2011 for the 550ktpa facility. In September 2019 an Environmental Permit was made seeking to increase permitted capacity from 550ktpa to 657ktpa, and in August 2020 this was approved (EPR/JP3135DK/V004, Source). In December 2020 Wheelabrator announced the sale of their UK EfW division to the European Diversified Infrastructure Fund III, an infrastructure fund managed by First Sentier Investors (FSI) [Source] and in June 2021 the compay was re-branded efinium [Source]. (Entry updated 2021-06-30) | |
| Existing 560,000 | Allington Integrated Waste Management Facility, 20/20 Business Park, Allington, Maidstone | Kent Enviropower Ltd / FCC (formerly Waste Recycling Group) and Green Recovery Projects (GRP) / ICON | Guildford Anti-Incinerator Network (GAIN) and Against Incineration in Maidstone Kent Local Environment Action Now (AIM-KLEAN) | Extension to add a fourth line to increase capacity by c350ktpa proposed in October 2019, but it was reported that FCC had withdrawn their application [Source]. According to the NSIP website: "the application is expected to be submitted to the Planning Inspectorate October 2020.". In the summer of 2007, during testing, the furnace linings were found to be faulty [Source]. In October 2022 it was reported that FCC had abandoned their plans to expand the incinerator [Source]. In February 2025 it was reported that this incinerator was granted money from the Green Heat Network Fund to develop a heat network. [Source] (Entry updated 2025-03-05) | |
| Potential 606,000 | Medway Energy Centre, MedwayOne Energy Hub, Site of the Former Kingsnorth Power Station, Hoo St Werburgh, Rochester, Medway | Indaver / Low Carbon / Uniper | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | RDF/SRF incinerator granted outline planning permission by Medway council in August 2023 (MC/21/0979). Various reserved matters approved in July 2024 (MC/24/0489 and MC/24/0421). Advertised as being planned to have a 49 MW capacity. ENDS reported in December 2024 that this project had yet to reach financial close [Source]. In August 2025 the Environment Agency issued an environmental permit for the site (EPR/DP3126SA/A001) with a permitted capacity of 606,000 tonnes per year and a waste type of "RDF & SRF". In February 2026 Indaver announced that it had e[Source] "secured exclusive rights to acquire the Medway Energy Centre, from Low Carbon" and that "Indaver is also in advanced discussions with a leading EPC contractor to provide design, build and construction services" [Source] (Entry updated 2026-04-20) | |
| MILTON KEYNES, SOUTH EAST | |||||
| Existing 94,000 | Milton Keynes Waste Recovery Park, Dickens Road, Old Wolverton | Thalia MK ODC Ltd (replacing AmeyCespa and RSM Group AS) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | First accepted waste in November 2016 [Source, Source]. Planning consent granted on the 12th of July 2013 [See planning application 13/00861/FULEIS]. AmeyCespa were named in October/November 2012 as the preferred bidder to design and build a RDF-burning gasification facility using technology to be supplied ENERGOS as part of a long-term municipal waste management contract with Milton Keynes at the council-owned site, and the contract was signed in June 2013 [Source]. Milton Keynes were previously part of Project Reduce which lost Government PFI funding in October 2010 [Source]. It was reported in September 2017 that: "Amey has been awarded a contract with Central Bedfordshire Council to treat household waste at its energy-from-waste facility in Milton Keynes." [Source]. It has been reported that the plant has been "fully operational" since March 2018 [Source]. (Entry updated 2023-08-07) | |
| OXFORDSHIRE, SOUTH EAST | |||||
| Existing 378,000 | Ardley EFW Plant, Ardley | Viridor | Oxford FoE and Oxford Brookes People and Planet and Ardley Against the Incinerator (AAI) | Operational. In December 2017 the capacity was increased from 300,000 [Source]. Oxfordshire County Council rejected Viridor’s original application just weeks after selecting the company as preferred bidder. The developer appealed this refusal and also submitted a revised planning application in April 2010 [Source] which was approved in October 2010 [Source]. The Secretary of State issued a "minded-to" letter in December 2010 supporting a grant of permission for the original application, and he decided not to call in the revised application. Permit FP3134GU issued in September 2010. (Entry updated 2019-06-06) | |
| SURREY, SOUTH EAST | |||||
| Existing 61,320 | Shepperton Eco Park, Charlton Lane, Shepperton | Suez Environment (formerly SITA) | Spelthorne Against The Eco-Park (SATEP) and Capel Action Group | According to its Annual Performance Report, the facility combusted 27,036 tonnes of waste in 2022 with an average parasitic load for the year of 47.6%. In June 2018 it was reported that commissioning was due to begin late Summer 2018 [Source]. Planning permission granted in August 2014 (ref SP13/01553/SCC, and amended proposal approved September 2014) [Source, Source]. It was reported in July 2013 that planning permission was being sought for an RDF-fed fluidised-bed gasification-type incinerator [Source, Source]. New technology supplier chosen as Ascot Environmental were forced into administration on the 18th of May 2012, rendering the previous planning consent and contract out of date [Source, Source]. A series of amendments were approved in March 2017 (ref: SP13/01153/SCA1). Defra stated in November 2020 that the gasifier plant commenced 'Hot Commissioning' phase in February 2020. A permit variation (V009) was approved in June 2024 that increased the capacity from 55,460 to 61,320 tpa and an increase in waste going to pre-treatment from from 55,460 to 94,339. According to the supporting information from the applicant: "Following the commencement of commissioning of the pre-treatment plant, SUEZ has discovered that approximately 35% of the incoming waste has poor CV or non-combustible material, which is not suitable for gasification. For instance, the proportion of food waste within the incoming waste is much higher than had been measured when designing the plant. Due to this change in waste composition there is a lower RDF yield from the pre-treatment process, to the extent that it limits the operating hours of the gasifier to ~6,500hrs/yr. The original intent was that the gasifier would operate for 7,984hrs/year. A shortfall of ~1,500hrs/yr (2 Months)". Explaining the increase in gasification capacity, the supporting information noted: "The gasification plant was designed to thermally treat up to 44,710 tonnes per annum with an assumed availability of 91%, equivalent to 7,984 hours per annum. During commissioning and optimisation we have also identified that the gasifier is not only capable of operating at a higher throughput, but also works more efficiently at a higher throughput when fed with a consistent and good quality RDF. Allowing for the theoretical maximum availability of the gasification plant and its increased throughput capacity, it is capable of processing up to 61,320 tonnes per annum of waste" [Source]. (Entry updated 2026-06-30) | |
| WEST BERKSHIRE, SOUTH EAST | |||||
| Potential 150,000 (RDF) | Reading Quarry, Berrys Lane, Burghfield, Reading | J Mould (Reading) Ltd | Reading Against the Incinerator (RATI). Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning permission granted on 2nd September 2022 [20/02029/COMIND]. According to the planning application's planning statement, it is intended to treat RDF from household, industrial and commercial sources "from the on-site Reading Quarry Waste Recycling and Transfer Facility (WRTF) and other sites in the locality" [Source]. The form of incineration technology is unclear - the environment statement claims: "RDF is gasified within a furnace before being combusted to create high pressure steam" which uses the term gasification but seems to more closely match a technical description of a conventional incinerator as it does not refer to thermal treatment taking place in the absence of oxygen. The REPD for January 2023 stated that the plant entered construction in 2023 [Source]. In May 2024 the Environment Agency did not include this facility in their list of plants that had a permit or outstanding permit application and there has been no sign of a permit application as of 23 September 2025. In September 2025 West Berks council confirms that: "we consider that the planning permission to have been implemented" because the applicant had notified them that development had technically commenced in August. (Entry updated 2025-09-23) | |
| Potential 104,000 | Advanced Conversion and Recovery Facility at Theale Quarry, Theale, Reading | Vertigo (consultancy) and EPI (technology provider) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In March 2025 West Berkshire Council approved planning permission for a "Advanced Conversion and Recovery Facility" (24/00247/MINMAJ). According to the Planning Statement: "The proposal seeks to develop a facility which would include 12 pyrolysis units processing a total of 104,000tpa", with the output to be a "fuel gas and a solid carbon char" and it is stated that: "...the main commercial focus of the plant is to produce hydrogen and/or bio-naphtha (a precursor of Sustainable Aviation Fuels or other liquid fuels), it is quite possible that the gas engines will only be used occasionally, or not at all. They are however included in the scheme for purposes of commercial flexibility/resilience" but that: "The gas engines could be used if the hydrogen/bio-naphtha markets become unviable, or if there is a need for the creation of power for the use of the plant if electricity supplies become unreliable or uneconomic". Proposal discussed in 21 May 2024 in a presentation to West Berkshire's Environment Advisory Group Open Forum. According to the minutes, the site would use "EPI's pure pyrolysis technology" to treat "small pieces of card, wood, or other organics, plastic or films – Refuse derived fuel (RDF), that other Materials Recycling Facilities would not take" and "would take sustainable biomass, forestry, and agricultural waste. Such as short rotation willow, miscanthus" and would "Target the commercial and industrial construction and demolition markets run by private companies". (Entry updated 2025-07-31) | |
| WEST SUSSEX, SOUTH EAST | |||||
| Existing 75,000 | Enviropower Energy from Waste / "Lancing Combustion Plant", Unit 2, Chartwell Road, Churchill Industrial Estate, Lancing | Rabbit Waste Management (formed of a merger between Sussex Waste Recycling and Enviropower) and potentially Biomass Power Ltd | ? | Primarily used for Construction & Demolition waste from the Waste Transfer Station operated by Rabbit Waste Management Ltd, but could also take trade waste and skip waste collected by Rabbit. In June 2017 it was reported that a fire burnt "over 500 tonnes of wood chippings being stored ahead of incineration" [Source]. Permit number XP3030XX. (Entry updated 2019-06-06) | |
| Potential 230,000 | Centre for Horsham Energy Recovery (CHER), Former Wealden Brickworks off Langhurst Wood Road, Horsham | Qair | No Incinerator 4 Horsham (Ni4H) [also see Ni4H Facebook Page] | Planning permission WSCC/062/16/NH allowed on appeal in Februay 2020 with 28 planning conditions, including an R1 condition (PINS Ref APP/P3800/W/18/3218965). Initial planning application withdrawn (with stated intention to re-submit) in July 2017 after planning officer recommended refusal [Source]. Second planning application submitted in March 2018 (ref: WSCC/015/18/NH and refused planning permission in June 2018 [Source]. Environmental Permit Consultation closed on 2nd August 2021 [See consultation]. Later in August the Environment Agency issued a Schedule 5 notice asking for further information about noise, site condition, waste input and effluent discharge. Permit issued in November 2022. ENDS reported in December 2024 that this project had yet to reach financial close [Source]. In August 2024 it was reported by ENDS that developers were targetting financial close in the first half of 2025, but as of 9th December 2025 financial close had yet to be announced [Source]. At the November 2025 Community Liaison Group for the Horsham incinerator QAIR stated that financial close had yet to be reached for the Horsham plant. ) (Entry updated 2025-12-09) | |
| Potential 15,000 | Hangar Building, Rudford Industrial Estate, Ford | SCS Waste (Hoare Construction Holdings Limited / South Coast Skips Limited) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Vote to grant planning permission granted by West Sussex County Council passed on 10th January 2023. Application reference WSCC/015/22 for change of use of existing hangar building, with planning consent issued in September 2023. A SWIP incinerator intended to use RDF generated from the adjacent Waste Transfer Station. SWIP permit application is dated November 2023 (See consultation page) (Entry updated 2023-01-12) | |
| WINDSOR AND MAIDENHEAD, SOUTH EAST | |||||
| Potential 150,000 | Hythe End Farm ERF, Fowles Crushed Concrete, Hythe End Farm, Hythe End Road, Wraysbury, Staines | Wraysbury Resource Management Limited (was previously listed as Fowles Crushed Concrete Limited) | Hythe End Road Estate Limited and its chair Simon are a contact point for those opposing this development. Contact coordinator@ukwin.org.uk to be put in touch with others opposing this development. | Scoping opinion issued by Royal Borough of Windsor and Maidenhead in May 2025 (24/02253/EIASCO) but no sign of planning application of May 2025. No indication within the scoping request that this site is intended as a replacement for the Lakeside incinerator, but the site is being proposed near to Heathrow airport. According to the applicant's scoping request: "The waste will be primarily commercial and industrial waste (C&I), but the facility will be capable of treating residual municipal waste in the event it is awarded a local authority contract". (Entry updated 2025-06-25) | |
| BCP, SOUTH WEST | |||||
| Potential 260,000 | Canford Resource Park, Arena Way, Magna Road, Wimborne | MVV | Extinction Rebellion Bournemouth, Christchurch & Poole (BCP) and Magwatch | Planning application refused by BCP in June 2025, and MVV has appealed. The appeal formally started on 8th January 2026, with interested party submissions due on or before the 12th of February 2026 and heargins scheduled to begin 2nd June 2026 (Appeal ref 6002440). In July 2023 MVV submitted a planning application BCP Council for their proposed incinerator (APP/23/00822/F). In January 2023 MVV announces that they would be running three information events in January 2023 for their proposed incinerator [Source]. Scoping Report submitted by MVV to BCP Council in April 2022 stated that the incinerator would use residual waste and Refuse Derived Fuel on land previously granted permission for a gasification and pyrolysis plant [Source]. Environmental permit issued by the Environment Agency in June 2025 (EPR/SP3127SF/A001). (Entry updated 2026-01-16) | |
| Potential 60,000 (consented) and 105,000 (planned) | Chapel Gate ERF, Eco Park, Chapel Lane, Parley (near Bournemouth Airport) | Eco Sustainable Solutions | Stop Parley and Canford Incinerators (Facebook Group) and Hurn Parish Council, West Parley Parish Council, and Ferndown Town Council | Planning permission granted by BCP Council for 60,000 tpa plant in December 2022 (ref 8/21/0207/FUL). In October 2024 it was announced that there were plans to increase the capacity from 60,000 tpa of residual waste to 105,000tpa of Refuse Derived Fuel [Source], however as of 5th March 2025 no planning application has been advertised. In September 2020 it was reported that there Eco Sustainable Solutions had plans to build an incinerator [Source]. In May 2024 the Environment Agency did not include this facility in their list of plants that had a permit or outstanding permit application, and no permit application has been publicly advertised as of 25 September 2025. In November 2024 Eco Sustainable solutions Ltd submitted an EIA Scoping Request to increase the capacity to 105,000 tpa and increase the building height (8/24/0808/SCOPE). A scoping opinion was provided in January 2025. In June 2026 a planning consultation began on the proposed expansion to 105,000 tpa, which included the addition of a front-end process to extract up to 25,000 tpa of material prior to the 105,000 tpa of "thermal combustion" at the otherwise conventional incinerator (P/26/02462/FUL). The scheme would involve a higher stack height of 42m compared to the consented 38m. (Entry updated 2026-06-30) | |
| BRISTOL, SOUTH WEST | |||||
| Existing 427,050 | Severn Road ReSource Recovery Centre, Severn Road, Avonmouth, Bristol | Viridor / KKR | Bristol Against Mass Burn Incineration (BAMBI) | Operational from the end of 2020. Incinerator supposedly intended to accept waste from "local businesses and local authorities". Turned down by Bristol City Council but approved on appeal in April 2011. Viridor had expected to begin construction in early 2012 [Source], but the plans were put on hold until Somerset Waste Partnership announced in November 2016 that they would provide up to 35% of the feedstock for the plant which was reportedly scheduled to begin operation in 2020 [Source]. In January 2021 it was reported that in December 2020 construction was completed and operations were handed over to Viridor by CNIM [Source]. Permit GP3834HY issued in September 2011. In November 2023 Viridor applied to increase capacity from 376,500 tpa to 427,050 tpa and to allow more waste types to be incinerated (EPR/SP3301LA/V003) and this request was approved in March 2024. According to the application: "Viridor is applying to increase the annual waste processing capacity of the Facility to allow for operation at the 110% Maximum Continuous Rating (MCR) thermal capacity point on the firing diagram. Continuous operation at the 110% point on the firing diagram would be achieved through changes to the combustion control system. The changes to the combustion control system will enable the Facility to process a higher waste throughput on an hourly basis" (Entry updated 2024-06-03) | |
| Potential 28,500 | Avonmouth High Temperature Incinerator / "Avonmouth Energy Facility", Kings Weston Lane, Avonmouth | Grundon | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Permit consultation launched for High Temperature Incinerator in July 2024 to vary the permit from the historic "Non-hazardous waste incinerator pyrolysis facility" plant associated with New Earth Solutions (EPR/LP3505LQ/V002) [Source]. It was reported in July 2024 that: "...in February 2021 the facility was sold on to Grundon Waste Management, which has now removed the former-gasification technology and is replacing it with a rotary kiln combustion system" [Source]. Grundon secured permit for this variation in January 2026 (LP3505LQ). (Entry updated 2026-04-20) | |
| CORNWALL, SOUTH WEST | |||||
| Existing 240,000 | Cornwall EFW Recovery Centre, Rostowrack Farm, St Dennis | SITA Cornwall Ltd (Suez Environment) | Cornwall Sustainable Waste Network (CSWN) and St. Dennis Incinerator Group (STIG) | Facility operational. Environmental permit granted in December 2010 [Source]. Planning permission granted on appeal in May 2011 [Source, See decision]. Permit GP3433GH issued in December 2010. SITA emissions data avilable from here and independent monitoring reports available from here. In March 2019 local campaigners were informed that repairs were being carried out to replace the faulty turbine. The turbine problem meant that no electricity was generated by the plant since June 2018 [Source]. In October 2025 it was reported that workw as due to start "on repairs to Cornwall’s waste incinerator at St Dennis, which has been out of action for months due to a very serious accident which damaged the plant’s boiler" [Source, Source]. (Entry updated 2025-12-09) | |
| DEVON, SOUTH WEST | |||||
| Existing 275,000 | North Yard Energy from Waste Plant, Land at North Yard, HM Naval Base, Devonport, Plymouth | MVV Umwelt | Devon Alliance for Incineration Alternatives (DAIA), Plymouth Without Incineration (PlyWIN), Stop The Incinerator Fouling Land at Ernesettle (STIFLE), Incineration Is Wrong (IIW) and the Plymouth Labour Party | It was reported in January 2016 that the incinerator was fully operational [Source]. South West Devon Waste Partnership signed a PFI contract with MVV Umwelt in April 2011 and the Devonport site was part of MVV’s bid [Source]. Anticipated feedstock is 70-80% MSW and 20-30% C&I [Source]. Planning application approved in December 2011 [Source]. It was reported in February 2019 that a contract to incinerate waste from Devon had been agreed [Source]. (Entry updated 2019-06-06) | |
| Existing 65,700 | Matford Park Energy from Waste Plant / "Exeter Energy Recovery Facility", Grace Road, Marsh Barton, Exeter | Cyclerval UK under contract to Viridor / KKR | Exeter Friends of the Earth | Formally opened October 2014 [Source]. It was reported in February 2019 that a contract to incinerate waste from Devon had been agreed [Source]. Permit PP3234UG/HP3538CR issued. The BEIS 2020 Q1 Heat Networks Pipeline Report associates this incinerator with proposals for a South West Exeter Heat Network [Source]. In March 2024 it was reported that "processed more than it was allowed to last year, prompting operators to apply for an increase in its permitted capacity" to 65,700 tpa, and this was increased in a March 2024 permit variation [Source]. (Entry updated 2026-03-03) | |
| Potential 87,000 (RDF) | Hill Barton Energy Generation Facility, Hill Barton Business Park, Stuart Way, Clyst St. Mary, Exeter | Exeter Waste to Energy Limited | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning permission granted by Devon County Council in March 2010 (DCC/2909/2009) and varied in November 2019 (DCC/4150/2019). Permit application consultation announced in December 2020, which states that the plant would "process commercial and industrial waste in the form of RDF through gasification" (EPR/EP3105BJ/A001). The permit was issued in July 2021. In May 2022 it was reported that money had been set aside to provide heat from a "forthcoming plant" in East Devon which Letsrecycle understood to be the Hill Barton plant. [Source]. In May 2024 the Environment Agency listed the facility status as "construction not started". In February 2025 it was reported that this incinerator was granted money from the Green Heat Network Fund to develop a heat network. [Source]. (Entry updated 2025-03-05) | |
| DORSET, SOUTH WEST | |||||
| Potential 202,000 (RDF) | Portland Port, Castletown | Powerfuel Portland | Stop Portland Waste Incinerator, The Portland Association, Jurassic Coast Incinerator Action Group and Coalition Against The Burner | Planning permission granted on appeal in September 2024 (APP/D1265/W/23/3327692), and in October 2024 it announced that legal challenge had been issued by a local campaigner [Source]. A legal challenge against the grant of planning permission is ongoing as of July 2025 with a hearing expected by Spring 2026. Plans for the incinerator intended to burn RDF were announced in November 2019 [Source, Source]. Planning application was submitted in September 2020 [See application ref WP/20/00692/DCC]. In March 2023 the Dorset council voted unanimously to refuse planning permission WP/20/00692/DCC (See video recording). Environmental permit AP3304SZ was issued in February 2025. On 5th November the Environment Agency opened a consultation on a variation to the permit that would increase the number of waste codes that could be incinerated, with the consultation closing on 18 December 2025, with a Fire Prevention Plan and other additional published in February 2026 in response to a Schedule 5 notice - people can make submissions to the EA on this additional information [EPR/AP3304SZ/V002]. (Entry updated 2026-02-25) | |
| GLOUCESTERSHIRE, SOUTH WEST | |||||
| Existing 190,000 | Javelin Park, Haresfield | FCC | Community R4C, Gloucestershire Against Incinerators (GlosAIN) and Glos Rapid Earth Action Network (GREAN) and No Monster Incinerator in Gloucestershire (NoMoInGlo) and Extinction Rebellion | Commissioning completed in November 2019 with the facility transferred from UBB to Urbaser Environmental Limited. Secretary of State granted planning permission in January 2015 (appeal ref 2200210). Planning application refused by Gloucestershire Planning Committee on the 21st of March 2013 [Source, Source]. On the 20th of October 2010 the Government withdraw PFI funding for the project [Source]. The Council decided to go ahead with the project anyway, and on the 14th of December 2011 named Urbaser and Balfour Beatty as preferred bidder; the contract was awarded in September 2012 [Source]. See Plume Plotter record of emission limit breaches for this incinerator. Details on the contract can be found on the Council's Frequently Requested Information page and a letter dated 3rd February 2025. (Entry updated 2025-03-24) | |
| PLYMOUTH, SOUTH WEST | |||||
| Potential 60,000 (RDF, SRF and Waste Wood) | Plymouth EfW Facility AKA "Biomass UK No 4", Units 21-29, 1 Belliver Way, Roborough | Aviva / Biomass UK No.4 Limited | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | According to a permit application consultation that began in February 2024, the applicant "intends to upgrade the existing facility and make changes to the combustion technology and boiler to enable the plant to operate reliably on a wider range of fuels to include refuse derived fuels (RDF), Solid Recovered Fuels (SRF) as well as mixed (PAS111:2012- Grade A – C) non-hazardouswaste wood feedstocks" and "previous plant owners and operators, Dartmoor Bio Power Limited (DBPL), under environmental permit number EPR/XP3134AW, using waste wood as a feedstock for gasification. Following DBPL entering into administration in 2018, the site was closed and permit duly surrendered by the Environment Agency (EA) on the behalf of the company" (EPR/BP3124SC/A001). Permit EPR/BP3124SC issues in November 2024. . (Entry updated 2025-03-05) | |
| SOMERSET, SOUTH WEST | |||||
| Existing 122,640 (RDF) | Land at Showground Road, Bridgwater | Bridgwater Resource Recovery Ltd (Equitix / Iona Capital) | Bridgwater Town Council. Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Under construction since late 2018 [Source]. Facility gasification of waste-derived fuel. Original planning application submitted in August 2014, granted in April 2015 (1/37/14/091). Variation submitted in December 2015, granted in October 2016 (1/37/15/093). In November 2018 it was reported that Equitix and Iona Capital would finance the plant which would be operated and maintained by Pinnacle Power and that the waste would be supplied by Geminor, with construction due to start in 2019 [Source]. An environmental permit was issued in July 2021 (EPR/UP3708SB/A001). In March 2023 it was reported that the facility's takeover had been delayed until at least October 2023 [Source]. ENDs reported on 10th July 2024 that wok at the plant was "about to restart after downtime for a maintenance outage" [Source] (Entry updated 2024-08-14) | |
| SOUTH GLOUCESTERSHIRE, SOUTH WEST | |||||
| Existing 467,082 | Severnside Energy Recovery Centre, Severn Road, Avonmouth | Suez Environment (formerly SITA) (leading consortium that also includes Lloyds Banking Group and the ITOCHU Corporation) | Bristol Against Mass Burn Incineration (BAMBI), FoE Bristol and West of England Liberal Democrats | In March 2020 Suez secured a variation of their environmental permit to increase the capacity from 400,000 to 500,000 tonnes per annum [EPR/ZP3937KL/V007]. In December 2016 it was reported that operations were set to begin [Source]. Intended to burn municipal waste from the West London Waste Authority (WLWA) as well as commercial and industrial waste. Granted planning permission on appeal in September 2011. [See decision document]. Environmental Permit issued by the Environment Agency. It was reported in November 2015 that "Construction started December 2013 and will be complete in August 2016" [Source]. Contract signed with West London Waste Authority in November 2013 [Source]. GBP 20m invested by Green Investment Bank in November 2013 [Source]. It was reported in February 2019 that a contract to incinerate waste from North Devon had been agreed [Source]. Permit ZP3937KL issued in July 2010. (Entry updated 2020-05-29) | |
| WILTSHIRE, SOUTH WEST | |||||
| Potential 243,000 | Northacre Renewable Energy Centre, Stephenson Road, Northacre Trading Estate, Westbury | Qair | North Wiltshire FoE and Westbury Gasification Action Group (WGAG) / No Westbury Incinerator and South West Wiltshire Green Party | In July 2024 it was reported that, although Hills maintains a shareholding, Qair had brought the project from Evero and was expected to provide the majority of the feedstock - it was also reported that "Qair is now aiming for financial close on the Northacre project next year and “expects” the plant operational in 2028" [Source]. In July 2022 Hills appealed on the grounds of non-determination, and subsequently on 27th July 2022 Wiltshire Councillors voted that their position was that planning application should be refused [Source]. The planning inquiry closed in December 2022, and on 21 February 2023 the grant of approval was announced. In June 2022 the EA granted permit ref EPR/CP3803LV/A001. In August 2020 a planning application was made to change the technology to conventional incineration and the Council voted to approve this in June 2021 subject to a potential call-in by the Secretary of State [Source] (20/06775/WCM / AP-36551). Not to be confused with the Honda plant at the same industrial estate. In January 2021 it was reported that Northacre Renewable Energy Ltd and Bioenergy Infrastructure Group (now known as Evero) had applied to increase the capacity from 160ktpa to 243ktpa and to move from advanced thermal technology to moving grate combustion [Source]. ENDS reported in December 2024 that this project had yet to reach financial close [Source]. While it was reported in June 2025 that the project was "making progress", as of 9th December 2025 no financial had been announced [Source]. At the November 2025 Community Liaison Group for the Horsham incinerator QAIR stated that financial close had yet to be reached for the Horsham plant. (Entry updated 2025-12-09) | |
| CARDIFF, WALES | |||||
| Existing 425,000 | Trident Park, Cardiff Bay (near Splott) | Viridor / KKR and PMG Estates Ltd / Prosiect Gwyrdd (Project Green) | Cardiff FoE, Scam Gwyrdd Wales Green Party, South Wales Without Incineration Network (SWWIN) and Cardiff Against The Incinerator | Began operating in March 2015 [Source]. In March 2017 capacity was increased 350ktpa to 425ktpa [Source]. Viridor were winning bidder for Prosiect Gwyrdd after WRG pulled out in May 2011, Covanta pulled out in October 2011 and Veolia pulled out in March 2013 [Source, Source, Source]. Contract signed December 2013 includes building an incinerator on the site [Source]. Planning permission granted by Cardiff Council in June 2010. Issued permit LP3030XA in November 2010. In November 2015 four other Welsh local authorities agreed to use the capacity [Source]. In 2016 it was announced that the European Investment Bank were to make a £110m loan for the scheme [Source]. In February 2019 it was reported that Pembrokeshire County Council were contracted to supply 20ktpa a year to the Trident Park incinerator for the next eight years [Source, Source]. The BEIS 2020 Q1 Heat Networks Pipeline Report associates this incinerator with the proposed Cardiff Heat Network [Source]. [See public register for permit LP3030XA] (Entry updated 2020-07-08) | |
| NORTH WALES, WALES | |||||
| Existing 232,000 | Parc Adfer, Deeside Industrial Estate, Flintshire | North Wales Residual Treatment Project (NWRWTP) / enfinium | Burton Residents’ Association & Mon and Gwynedd FoE | Planning permission for a conventional incinerator granted in May 2015 [Source]. Facility entered commissioning in July 2019 [Source]. Planning application submitted in October 2014 (ref. 052626) for an incinerator intended to burn both MSW and C&I waste. The site was officially "chosen" as the location for incinerator proposals in August 2012 as part of a Welsh Assembly Government scheme [Source]. Environmental permit issued in 2015. It was reported in December 2016 that the facility - to be operated under a Public-Private Partnership involving Flintshire, Isle of Anglesey, Gwynedd, Conwy and Denbighshire councls - recieved 35m GBP GIB investment [Source]. Construction began in January 2017 and was reported as being fully operational in January 2020 [Source, Source]. In December 2020 Wheelabrator announced the sale of their UK EfW division to the European Diversified Infrastructure Fund III, an infrastructure fund managed by First Sentier Investors (FSI) [Source] and in June 2021 the company was rebranded efinium [Source]. In February 2023 the applicant submitted an application to increase the capacity from 200 ktpa to 232 ktpa and this variation was issued in August 2023 (EPR/AB3092CV/V007). In September 2025 Enfinium invited public comments on their carbon capture and storage plans for the site [Source]. See public register for AB3092CV. (Entry updated 2025-09-24) | |
| Potential 80,000 | Deeside Refuse Derived Fuel Project gasification plant, Site of the former Gaz De France power station, land off Weighbridge Road, Deeside Industrial Estate, Flintshire | EQTEC and the Rotunda Group | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | It was announced in July 2020 that EQTEC and the Rotunda Group would seek permission for an "advanced gasification technology" plant to use waste from the nearby RDF plant which currently has a capacity for 182,000tpa as part of a deal with Logik Developments Limited [Source, Source]. Following the Welsh Government's moratorium on incinerators of 10MWe and over, the proposal was revised to be a gasification plant with a reduced capaicty of 9.9MWe and a reduced throughput of 80,000tpa and this was approved by Flintshire Council in October 2021 with a time limit which would only allow the facility to operate until 2050 [Source, Source]. In February 2023 it was reported that Eqtec "has been unable to offload its incomplete Deeside...gasification technology facility...." [Source, Source]. (Entry updated 2023-08-29) | |
| POWYS, WALES | |||||
| Potential 23,150 | Combined heat and power CHP development at Ffaldau Waste Re-Cycling Centre, Landridnod Wells | Argrivio / Powys Environmental Ltd | Penybont & Llandegley Community Council | Small Waste Incineration Plant granted planning permission granted in March 2025 with pre-operational conditions requiring of approval of ammonia scrubbing and SCR equipment to reduce impacts on the nearby ancient woodland (23/1484/FUL). This is a resubmission of planning application 22/1631/FUL which was withdrawn in April 2023. It is unclear whether or not a Schedule 13 permit application has been submitted to Powys Council for approval [Source]. The planning application references "Commercial and Industrial" waste, RDF, and biomass as potential feedstocks. (Entry updated 2025-11-13) | |
| SOUTH WALES, WALES | |||||
| Potential 220,000+ | Newport Alexandra Dock, Newport | Vital Energi | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning permission granted by Newport City Council in 2011 (10/1238) and subsequently varied multiple times. Variation 19/0599 granted in September 2019 states that the facility will "process biomass, wastes and residue feedstock" but the precise technology, which could be some form of gasification, has yet to be announced. It was reported in January 2020 that Andusia would be the "sole waste supplier" of around 220,000tpa of RDF a year to an unspecified incinerator under construction at Alexandra Docks, [Source]. In January 2022 it was reported that the facility was "12 months away from accepting waste" and that once constructed the plant would be operated by Harris Pye [Source]. In April 2023 it was reported that this project was 'paused' and in administration [Source]. In June 2023 it was reported that the abandoned project might be bought be bought up to be restarted or might be sold as scrap [Source]. In May 2024 it was reported that Vital Energy had purchased the facility from insolvency practitioners FRP who were acting on behalf of Aviva investors as part of a £1m deal, with Vital announcing that they were "now developing options for construction of an EfW plant on the site" - it was also reported that Vital would need to apply for a permit if they wished to operate an incinerator on the site [Source]. (Entry updated 2024-06-03) | |
| SANDWELL, WEST MIDLANDS | |||||
| Existing 400,000 (MSW, C&I and RDF) | Kelvin Energy ERF, Land at Giffords Recycling, Kelvin Way, West Bromwich | enfinium / Verus Energy Oak Limited | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning permission for a 250ktpa energy plant was granted in February 2011 (DC/10/52454) and the height was increased in March 2014 (DC/14/56920). Planning application for a 400ktpa scheme submitted in October 2017 (ref DC/17/61177) and allowed on appeal in September 2019 (details of the appeal on the Sandwell Council entry for application DC/17/61177; appeal ref: 3216591). Permit application for the 400tkpa scheme was submitted in July 2018 and re-advertised in October 2018 (EPR/DP3038JC/A001). The Environment Agency issued a permit in July 2019 [EPR/DP3038JC]. In April 2020 it was reported that consturction was to begin in early 2021 and that 'Low Carbon' would an investor in the scheme which was expected to reach close by end of 2020. [Source]. According to the Renewable Energy Planning Database the plant entered construction on the 28th of November 2021 [Source]. In July 2025 it was reported that the plant is "expected to be fully operational in 2026" [Source]. In January 2026 details of the construction work were published [Source] (Entry updated 2026-02-25) | |
| SHROPSHIRE, WEST MIDLANDS | |||||
| Existing 102,000 | Battlefield Enterprise Park, Shrewsbury | Veolia | Safe Waste Shropshire | Planning permission granted by the Secretary of State on the 10th of January 2012. The Environment Agency issued an environmental permit in June 2010. (Entry updated 2026-04-20) | |
| STAFFORDSHIRE, WEST MIDLANDS | |||||
| Existing 340,000 | Staffordshire ERF, The Dell, Enterprise Drive, Four Ashes near Cannock | Veolia | Staffordshire Against Incineration (SAIN) | Plant officially opened in May 2014 [Source]. Government Office for the West Midlands granted planning permission in January 2010 and Staffordshire County Council approved a revised plan in February 2011 [Source]. Veolia were chosen as preferred bidder to build and operate the site. In August 2010 Warwickshire County Council entered into a 25 year contract with Veolia [Source]. It was reported in May 2014 that: "Staffordshire county council will be supplying about half the waste to the facility...At present additional municipal waste is coming from other authorities including, Warwickshire, Stafford borough, Sandwell, Walsall, Wolverhampton and Shropshire" [Source]. (Entry updated 2019-06-06) | |
| STOKE ON TRENT, WEST MIDLANDS | |||||
| Existing 210,000 | Stoke Energy from Waste Facility / "Hanford", Campbell Road, Sideway, Stoke-on-Trent | North Midlands Operations Ltd (NMOL) / Cobalt Energy - previously run by MES Environmental Limited | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Stoke-on-Trent City Council faced the prospect of a £645,000 fine resulting from a failure to meet minimum contracted waste tonnage levels at their local incinerator [Source]. Due to reach end of life by around 2025, with replacement under consideration with procurement due to start in 2023 to potentially be operational by 2028 [Source]. In November 2024 it was reported that a Strategic Manager at Stoke-on-Trent Council had stated that: "We've investigated refurbishment options, and we are of the opinion that we are better off replacing the plant" and that it is "expected to be replaced in 2028 or the following year" [Source]. (Entry updated 2024-12-05) | |
| Potential 290,000 | Replace Stoke incinerator, site of the current Stoke Energy from Waste Facility, Campbell Road, Sideway, Stoke-on-Trent | North Midlands Operations Ltd (NMOL) and/or a third party | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | The Stoke-on-Trent City Council Energy Strategy published in July 2023 states that: "the facility is approaching the end of its planned lifespan and is due for replacement in the next decade. This presents an opportunity to redevelop the incinerator into a more efficient energy generation facility" [Source]. It was previously reported that the existing Stoke incinerator is due to reach end of life by around 2025, with replacement under consideration with procurement due to start in 2023 to potentially be operational by 2028 [Source]. In February 2026 it was reported that Stoke-on-Trent City Council was progressing towards procuring a replacement incinerator with a capacity of 230,000 tpa - 290,000 tpa which could become operational in 2032 [Source, Source]. The plans were consuted on between May and June 2026, with Stoke Council stating: "We will carefully consider any comments we receive during the consultation period and we'll publish a Statement of Community Involvement, which will include details of how the feedback has shaped the proposals and our responses to the key points raised" [Source]. (Entry updated 2026-06-30) | |
| TELFORD AND WREKIN, WEST MIDLANDS | |||||
| Potential 25,500 | Green Energy Facility / "Halesfield EfW", Site 2, Halesfield 21, Halesfield | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning permission approved in September 2021. Intended to treat pre-pared RDF (TWC/2021/0552). According to the planning application: "This fuel will be fired in a Rotary Kiln furnace from which the flue gases will go into a steam boiler". According to the April 2023 REPD database the plant had yet to enter construction. (Entry updated 2023-05-25) | ||
| WALSALL, WEST MIDLANDS | |||||
| Potential 478,300 | The WandE / "Walsall Energy From Waste Facility", Land off Fryers Road | Encyclis | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | The project started as a proposal for a gasification-type incinerator intended to burn mixed municipal commercial, industrial and municipal waste [Source]. Initial planning application approved in January 2009 and revised planning application approved in September 2013 (re 13/0725/WA) [Source]. Allocated Round One Contracts for Difference funding in February 2015 [Source]. The planning permission was varied in November 2015 and this included an increases stack height (15/1157). Planning application 19/1172 was registered by submitted to Walsall Council in September 2019 and on the 28th of May 2020 the Planning Committee voted in favour of planning consent [Source]. In June 2020 an application was made to vary the permit to change the technology to conventional incineration and to increase the maximum capacity to around 478,300 tonnes per annum [EPR/AP3832WS/V002]. In January 2024 it was reported that the West Midlands Combined Authority offered support for a district heating scheme [Source]. In November 2024 it was reported that the plant had moved from two to one lines, that construction was under way, and that the project as on track to be completed in 2026 [Source]. In May 2025 Enyclis announced "the start of full-scale construction" and stated that the facility was "due to begin operations in 2027" [Source]. (Entry updated 2025-07-31) | |
| WARWICKSHIRE, WEST MIDLANDS | |||||
| Existing 130,000 (RDF) | Baddesley Energy from Waste Facility / "Baddesley WTE", Off Merevale Lane, Baxterly, Atherstone | Equitix EEEF WTE (Baddesley) Limited, | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Began operation 2022. Proposed RDF incinerator intended to "employ stepped moving grate technology" for waste combustion [Source]. Planning permission granted on appeal for a biomass scheme in February 2010 (PINS Ref 2104317) and subsequently varied several times, including in October 2017 (ref NWB/17CM016). It appears that the plant is now intended to treat RDF with "refuse derived fuel containing at least 50% from biomass sources including wood products, paper, chipped waste timber, cardboard and compost oversize" [Source]. Permit application went out for consultaitoin in October 2018 (EPR/XP3730QZ/A001) which states that the feedstock will be RDF that "will (on a reasonable endeavours basis) contain at least 50% biomass". Permit issued in September 2019 (EPR/XP3730QZ/A001). (Entry updated 2024-04-16) | |
| WEST MIDLANDS MET DISTRICTS, WEST MIDLANDS | |||||
| Existing 118,000 | Wolverhampton Energy from Waste Plant, Crown Street, Wolverhampton | North Midlands Operations Ltd (NMOL) - previously run by MES Environmental Limited | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | (Entry updated 2019-06-06) | |
| Existing 315,000 | Bar Road, Coventry | The Coventry & Solihull Waste Disposal Company Ltd | Coalition for Recycling and Against Coventry Incinerator (CRACIN) | Nearish the end of its operational life. It is expected that the facility will be refurbished rather than decommissioned because the plant is connected to a district heating scheme [Source]. The Council(s) purchased Tom White Waste's assets in January 2025 which included the incinerator and agreed a 25-year agreement to lease them back to Tom White Waste [Source]. In January 2025 it was reported that: "Coventry and Solihull Waste Disposal Company (CSWDC) has revealed its Coventry-based facility is unable to meet key emission limits under the recently updated Waste Incineration BREF (WI BREF). The issues for the facility, which is ultimately owned by CSWDC’s shareholders Coventry City Council, Solihull Metropolitan Borough Council and Warwickshire County Council, were revealed in an environmental permit application" [Source]. (Entry updated 2025-07-31) | |
| Existing 105,000 | Dudley Energy from Waste Facility, Lister Road, Dudley | FCC (who purchased Urbaser Environment Ltd in June 2024) - previously run by MES Environmental Limited | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | (Entry updated 2019-06-06) | |
| Existing 440,500 | Tyseley Energy from Waste Facility, James Road, Tyseley, Birmingham | Tyseley Waste Disposal Ltd / Veolia | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In March 2020 Veolia applied for a permit variation (ref EPR/WP3239SJ/V009) to allow for the facility to incinerate hazardous clinical waste on the two non-hazardous incineration lines. It was reported in January 2025 that there had been a minor fire in an indoor rubbish pit at the site. [Source] (Entry updated 2025-03-05) | |
| WORCESTERSHIRE, WEST MIDLANDS | |||||
| Existing 230,000 | Hartlebury Trading Estate, Hartlebury, Kidderminster (near Stourport-on-Severn) | Mercia EnviRecover (part of FCC and Urbaser) / Mercia Waste Management (MWM) Ltd | Worcestershire residents Against Incineration and Landfill (WAIL) and Herefordshire & Worcestershire Action Group (HWAG) | It was reported in March 2017 that the plant was "fully operational" [Source]. The application was called in by the Secretary of State in May 2011 and granted planning permission in July 2012 [See decision notice]. Permit XP3935TX issued in April 2011. (Entry updated 2019-06-06) | |
| Potential 75,000 | Kidderminster Energy Park, Next to Liberty Aluminium, Stourport Road, Kidderminster | Power Generation East Midlands / Bio Global Industries | Wyre Forest Against Incineration (see Facebook group) | Incinerator announced in May 2020 to treat commercial and industrial waste. Planning appication submitted to Worcestershire County Council in August 2020 and approved in September 2021 (20/000034/CM). In May 2024 the Environment Agency did not include this facility in their list of plants that had a permit or outstanding permit application. Various planning conditions were discharged in 2024. In December 2025 it was reported that construction had begun on the site, including "the access road to the site and vegetation being cut back", but there has been no announcement that it has entered full construction [Source]. (Entry updated 2026-01-16) | |
| Potential Unknown | Hanley Swan Waste Incinerator, Hangmans Lane, Hanley Castle | Mr. Peter Styles | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Incinerator built in 1970s and shut down in 1995. Certificate of lawful use issued in on appeal in October 2016 (appeal ref APP/E1855/X/16/3147848). The site may be developed for housing rather than re-opening or replacing the disused incinerator. It was stated by a representative of Mr Styles in October 2016 that: "Mr Styles is in conversation with a couple of parties who are interested in reopening as some sort of incinerator" [Source]. If the site were to be brought back into use as an incinerator then the operator would need to apply for a new environmental permit. No sign of progress as of August 2023. (Entry updated 2023-08-31) | |
| BARNSLEY, YORKSHIRE AND THE HUMBER | |||||
| Potential 145,000 | Land off Houghton Main Colliery Roundabout, Park Spring Road, Little Houghton | Grid Powr (UK) Ltd | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In September 2023 a permit application was advertised to treat 145ktpa of RDF through gasification (EPR/BP3325SA/A001). Barnsley Metropolitan Borough Council refused planning permission for the initial iteration of the scheme in November 2014 (2014/0559) but an amended scheme was approved in February 2015 for a gasiifcation plant to treat "up to 150,000 tonnes per annum of waste wood and virgin timber through a gasification process" (2015/0137). The scheme was the ammended in 2018 to increase the capacity to 260,000 tonnes per annum and to switch the feedstock to RDF and waste wood (2018/1437). In 2019 a planning conditions were discharged and varied in 2019 (2019/0573 and 2019/0941), including a variation to allow alterations to the design, scale and layout. Permit EPR/BP3325SA issued in August 2024. The Applicant stated in their Planning Statement for application 2019/0941 (for the Variation of Condition 1 of application 2018/1437) to allow alterations to the design, scale and layout of the Renewable Energy Park that: "Commencement of development was implemented on 26 June 18". (Entry updated 2025-03-05) | |
| DONCASTER, YORKSHIRE AND THE HUMBER | |||||
| Potential 350,000 | Land Off Sandall Stones Road, Kirk Sandall | Low Carbon (previously BH EnergyGap (Doncaster) Ltd) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Permit issued in September 2021 (EPR/SP3904SR). Planning application 20/01774/TIPA was granted planning permission in August 2022. Earlier planning application submitted to Doncaster Council in August 2020 for a conventional incinerator to treat C&I and/or municipal waste (ref 19/00954/CPL). In December 2020 it was reported that "BH Energy Gap (Doncaster) Ltd has applied to the Environment Agency for a permit" and that "Energy bosses said it would [use] 'advanced thermal treatment technology'" [Source]. According to the August 2020 non-technical summary for the permit application the proposal appears to be for a conventional moving grate incineration, with the "advanced" claim seemingly being a reference to what the permit application describes as the intention to "incorporate the latest advances in control and instrumentation technology" (EPR/SP3904SR/A001). The non-technical summary states that while the nominal capacity is 301ktpa the facility could potentially treat up to around 384ktpa depending on the calorific value of the feedstock [Source], and the permit lists a maximum throughput of 426,612 tpa. In July 2009 (ref 09/00246/TIPA) planning permission was issued for a "Proposed energy recovery facility involving gasification of (household and commercial) waste". A different gasification proposal on the site was approved in May 2018 (17/00923/TIPA), but in May 2019 the Council refused to issue a certificate of lawfulness to operate the site with conventional incineration technology (19/00954/CPL). ENDS reported in December 2024 that this project had yet to reach financial close [Source]. In December 2025 it was reproted that CVC DIF would be refinancing the project's debt through DIF Infrastructure VIII "and is expected to close during the fourth quarter of 2025, subject to customary closing conditions", creating a new partnership alongside MassMutual. [Source]. (Entry updated 2025-12-09) | |
| HULL, YORKSHIRE AND THE HUMBER | |||||
| Potential 48,000 | Saltend Chemicals Park, Saltend Lane, Hull | Standard Gas / PX Group | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In November 2023 it was reported that Standard Gas intends to install a pyrolysis plant at the Saltend Chemicals Park under an agreement with the site's owner and operator PX Group [Source]. The press release suggests that the plant would produce "gas for industrial use" (alongside biochar) and states that: "Product gas can be used in electricity or steam and heat generation, as a natural gas substitute, or further processed for renewable transport fuels, or chemical feedstock" [Source]. As such, the plant is different to close-couple ATT plants that immediately burn the gas produced to produce electricity and/or heat. (Entry updated 2023-11-29) | |
| LEEDS, YORKSHIRE AND THE HUMBER | |||||
| Potential 24,000 | Knowsthorpe Way, Cross Green | Skelton Waste Disposal | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Small waste incineration plant (SWIP) using Fluidised Bed Combustion to treat RDF was granted planning permission in December 2023 (23/04970/FU) and varied in April 2024 (24/01127/FU). According to the original planning application: "The plant would be fuelled by a maximum 24,000 tonnes of Refuse Derived Fuel (RDF), manufactured at the applicants existing operations at the adjacent Waste Transfer Station". It appears that the site has yet to obtain it SWIP permit from Leeds council [See permits]. In 2025 planning permission was amended because the plant was proposed to be moved to a different part of the wider waste site (24/06068/FU). (Entry updated 2026-01-16) | |
| NORTH EAST LINCOLNSHIRE, YORKSHIRE AND THE HUMBER | |||||
| Potential 676,000 | North Beck Energy Centre / "Centre from Refuse Derived Fuel", Queens Rd, Immingham | North Beck Energy | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning application for a 30-year incinerator to take municipal and commercial waste in the form or RDF submitted in January 2018 for land owned by Able UK Ltd [Source]. Planning permission granted by NE LincS Council in October 2018 (DM/0026/18/FUL, Source). It appears to be a conventional waste incinerator. In November 2018 a consultation was announced for an environmental pemit (EA ref EPR/BP3739QT/A001). Permit issued in September 2021 [Source]. Planning application to discharge Conditions 4 and 17 validated in July 2023 (DM/0687/23/CND). It was reported in May 2023 that North Beck Energy Ltd was looking for a contractor to build the incinerator [Source]. In November 2022 the operator "elected to defer permit review" and in October 2023 a permit variation was issued requiring a report to be submitted by the operator showing compliance with the updated BAT Conclusions before the incinerator can be operated. In May 2024 the Environment Agency listed the facility status as "construction not started". In July 2025, North East Lincolnshire Council stated in a Scrutiny Panl report that: "A 24-acre site owned by Able UK. Approximately ten acres has potential to see a 25MW waste to energy plant developed by North Beck Energy which gained planning permission in 2018. The project has seen some challenges in securing the necessary funding, but all planning conditions were discharged in 2023...The remainder of the site is being actively marketed by the landowners" [Source]. (Entry updated 2026-01-16) | |
| Potential 753,500 (RDF) | South Humber Bank Energy Centre, South Humber Bank Power Station, South Marsh Road, Stallingborough, Grimsby | EP UK Investments (EPUKI) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | A Development Consent Order for the larger version of the scheme was issued in November 2021 [Source]. The scheme was announced in August 2018 [Source, Source]. Planning permission was granted for the facility to operate up to 49.9MWe in April 2019 [Source]. According to the National Infrastructure Planning website the application for operation above 50MWe was submitted in April 2020 and approved for examination in May 2020 with examination hearings due to start in February 2021 [See NIP page for the project]. According to the Scoping Opinion: "The design capacity is 616,500 tonnes of RDF per annum rising to a maximum of 753,500 tonnes, depending on the net calorific value of the RDF" [Source]. It appears that the proposal intends to use conventional incineration to treat Refuse Derived Fuels. An environmental permit variation was granted in May 2020 (ref EPR/MP3235LY/V009). In May 2024 the Environment Agency listed the facility status as "construction not started". (Entry updated 2024-05-13) | |
| Potential 600,000 | Waste to Sustainable Transport Fuels Plant, Portlink 180, Hobson Way, Stallingborough, Grimsby | Altalto Immingham Ltd / Velocys | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning application submitted in July 2019 and approved in June 2022 for a 600,000 waste to fuel plant (DM/0664/19/FUL). According to the Planning statement, approx 600ktpa is shredded and dried on-site to produce c. 375ktpa of SRF for the "steam reforming gasification" process. The Planning Statement also notes that the Fischer Tropsch process is intended to be used to convert the syngas into Synthetic Paraffinic Kerosene (SPK) and Naphtha to be turned into transport fuels. In December 2022 this project £27m from the Advanced Fuels Fund (AFF) and that the plant was expected to produce "produce 37.4kt/y of SAF when at full operational capacity" [Source, Source]. It was reported in April 2022 that Velocys "had completed site engineering, a geotechnical survey, and the integration of carbon sequestration of biogenic CO2" [Source]. (Entry updated 2023-01-16) | |
| Potential 226,000 (RDF) | Alpha Grimsby Renewable Energy Centre, Vireol Plc, Energy Park Way, Grimsby | Synpower / Alpha Grimsby Ltd | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning permission granted in January 2019 by North East Lincolnshire Council (DM/0329/18/FUL) for 170-200ktpa and then varied in July 2021 to increase the throughput to 226ktpa tpa of RDF (DM/0667/20/FUL). In May 2024 the Environment Agency did not include this facility in their list of plants that had a permit or outstanding permit application. In May 2024 it was reported by ENDS that this facility was "thought to be close to making financial close" [Source]. In April 2025 planning permission was varied to increase the overall height of the building (DM/0574/24/FUL). (Entry updated 2026-01-16) | |
| Potential 350,400 (RDF) | Immingham Energy from Waste, Netherlands Way, Stallingborough, Grimsby | TEGCO Immingham Ltd | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Proposed conventional RDF incinerator granted planning permission in 2018 by North East Lincolnshire council (DM/0628/18/FUL), with Section 73 variations granted in 2022 and 2023. Intended to replace existing CHP plant on adjacent industrial lane. Has yet to enter construction, but development might have technically commenced for planning purposes. Permit issued in December 2024 (EPR/RP3628SJ/A001). (Entry updated 2025-07-31) | |
| Potential 25,000 | Land At Great Coates Business Park, Humber Gate, Stallingborough, Grimsby | Unstated prospective applicant | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | High-temperature incinerator for specialist waste. Scoping report submitted to North East Lincolnshire Council in April 2024 states: "The thermal treatment plant would manage a diverse range of wastes from commercial and industrial processes, manufacturing, maintenance activities, education, research and development, provision of healthcare services, law enforcement, and agricultural activities, which require high temperature destruction and disposal" (DM/0423/24/SCO). According to the Scoping Report, the plant would be classified as a waste incinerator for regulatory purposes. The local newspaper notes that the applicant is unstated. [Source]. The metadata for the scoping report mentions 'GRG', which could be a reference to GRG Waste UK, but this has not been confirmed. (Entry updated 2024-07-01) | |
| NORTH LINCOLNSHIRE, YORKSHIRE AND THE HUMBER | |||||
| Existing 56,000 | Newlincs Grimsby Incinerator, South Marsh Road, Stallingborough, Grimsby | Cyclerval UK & TIRU Group / Newlincs Development Ltd | Lincolnshire Anti-Incineration Alliance (LAIA) | (Entry updated 2019-06-06) | |
| Potential 650,000 - 760,000 (RDF) | North Lincolnshire Green Energy Park, Flixborough Wharf, Flixborough Industrial Estate | North Lincolnshire Green Energy Park Limited / Solar 21 | Residents Against Trent Incinerators | Planning permission granted by Head of Energy Infrastructure Planning Delivery at DESNZ on 13th March 2025 despite Examining Authority recommendation for refusal (see NSIP page for application EN010116). Development Consent Order requires at least 50% or 350,000 tpa of waste (whichever of the two i the lower) to be sourced from the East Midlands. The applicant indiates that waste could also be sourced from a "good proportion" of the East of England region which is within the 100-mile catchment area for the plant. (Entry updated 2025-05-30) | |
| NORTH YORKSHIRE, YORKSHIRE AND THE HUMBER | |||||
| Existing 320,000 | Allerton Waste Recovery Park, Allerton Park Quarry, Knaresborough | Thalia | Tockwith Residents Association, NYWAG and York Residents Against Incineration | Construction began in March 2015 [Source, Source, Source]. It was stated in January 2018 that construction had been completed and that technical testing would take place over the next few months [Source]. Approved by planning committee 30th October 2012 (Ref NY/2011/0328/ENV). Part of PFI contract awarded in December 2010, but lost PFI funding in February 2013 [Source]. In September 2014 North Yorkshire County Council approved alternative funding arrangements - "UK Green Investment Bank (GIB) put £33 million into the project, and other backing came from Aberdeen UK Infrastructure Partners and Equitix" [Source, Source] and £150m from the European Investment Bank [Source]. Planning Condition 40 requires an air quality monitoring scheme for 12 months post final commissioning (with details confirmed in NY/2017/0136/A27). (Entry updated 2025-09-23) | |
| Potential 130,000 | Knapton Green Energy Facility, Landfill Site Knapton Quarry, East Knapton, Malton | Knapton Green Energy, Tetragen and NCG Estates. | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning permission was granted in 2018 for a 65ktpa gasification plant (NY/2016/0194/ENV). In 2016 this project was promoted as diverting waste from incineration and as "more efficient" than incineration, with the company behind the scheme stating "It is important to note that this is not incineration" [Source]. The description of the technnology was changed in April 2019 to remove the reference to gasification (NY/2019/0038/NMT), and it seems possible that the plant will therefore ultimately use conventional incineration (although this has not been confirmed). In March 2021 planning permission was granted for an increase in capacity to 130ktpa (NY/2019/0078/73) for a non-gasification incinerator. According to the October 2020 GHG Assessment, the plant would treat prepared RDF and 54% of the carbon that of the waste intended to be used as feedstock would be from fossil sources such as plastic. It was reported in January 2024 that "A consented energy-from-waste project in Yorkshire - currently owned by Tetragen Knapton UK Limited (TKL) - has been put up for sale. Redbourn Capital has confirmed to EWB it is marketing 100% of TKL.." despite the fact that a permit had yet to be applied for with respect to this facility [Source]. (Entry updated 2024-01-25) | |
| Potential 240,000 (RDF and mixed waste) | Selby Energy Recovery Plant, Aviation Road, Sherburn in Elmet | Energy Ventures No1 Ltd | Sherburn-in-Elmet Parish Council. Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning permission 2016/1456/EIA for a conventional RDF and mixed waste incinerator techinically commenced in June 2020 to preserve the planning permission, but in In October 2025 planning permission was varied (ZG2025/0107/S73) to help make way for construction to actually commence. Permit application EPR/AP3526LV/A002, was submitted with documents dated August 2025, and a consultation ran between January 2026 and March 2026 [See consultation page], and the EA stated on 11 May 2026 that it was "currently in the application review stage". Planning history: The scheme is modified from the original application made in December 2016 for RDF gasification plant (ref 2016/1456/EIA) using a feedstock "sourced from recycling centres from outside of the Sherburn Industrial Estate" which was granted in October 2016. Some planning conditions were discharged by Selby District Council in 2020 (2020/0276/DOC) and a Section 73 application to vary conditions was approved in 2021 to increase the capacity to from 200ktpa to 240ktpa and changed the technology from "gasification" to "grate" technology (2021/1402/S73). (Entry updated 2026-06-30) | |
| Potential 350,000 | Southmoor Energy Centre, Kellingley Colliery, Weeland Road (near Knottingley) | Peel Environmental / Harworth Estates (HEPGL) / Southmoor Energy Centre Limited | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | Planning application for an incinerator submitted in May 2013 (planning application NY/2013/0128/ENV), and planning consent was issued February 2016. Peel stated in 2013: "It will use up to 280,000 tonnes per year of non-hazardous residual waste including industrial, commercial and possibly household from across the region" [Source]. Peel announced in March 2019 that "Plans...are progressing, with the company expecting to be on site in Autumn 2019" and stated that: "Peel Environmental is proposing to make some changes to the existing planning permission, one of which is to increase the fuel for the facility from 280,000 tonnes to 350,000 tonnes per year" and that "A Section 73 planning application to amend the plans has been submitted to NYCC [North Yorkshire County Council] and is expected to be considered in Summer 2019" [Source]. Environmental Permit issued in October 2019 (EPR/FP3437QL/A001). A proposal to vary the planning consent (NY/2019/0005/73) was registered in January 2019 and granted in February 2020. Permit varied in November 2023 following a BAT review (EPR/FP3437QL/V002). (Entry updated 2024-08-14) | |
| SOUTH YORKSHIRE, YORKSHIRE AND THE HUMBER | |||||
| Existing 245,000 | Sheffield Energy Recovery Facility, Bernard Road, Sheffield | Veolia ES Sheffield Limited | South Yorkshire Against Incineration (SAI) | In May 2011 Veolia were granted permission to temporarily vary a planning condition to allow for more waste to come in from outside of Sheffield due to ’unexpected’ commercial difficulties securing C&I and MSW waste locally. In 2012 Veolia requested a further variation to indefinitely allow even more waste from even further afield [Source]. The BEIS 2020 Q1 Heat Networks Pipeline Report associates this incinerator with both an existing and an expansion of the Sheffield District Heating Network [Source]. In December 2020 it was reported that Veolia had applied for a permit to treat up to 10,000 tpa of clinical waste and this was approved in April 2021 [Source, EPR/BM4082IY/V008]. (Entry updated 2021-04-29) | |
| WEST YORKSHIRE, YORKSHIRE AND THE HUMBER | |||||
| Existing 136,000 | Kirklees Energy from Waste Facility, Vine Street, Huddersfield, Kirklees | SITA (Kirklees) Limited (Suez Environment) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | The BEIS 2020 Q1 Heat Networks Pipeline Report associates this incinerator with a proposed heat network [Source]. (Entry updated 2020-07-08) | |
| Existing 190,000 | Leeds Recycling and Energy Recovery Facility, Former wholesale market on Pontefract Lane in Cross Green, Leeds | Veolia | FoE Leeds / No Incinerator, Leeds / No2incinerator | Operations began in April 2016 [Source]. Planning permission granted February 2013 [Source, See planning application]. Leeds signed a Waste PFI with Veolia in November 2012 [Source]. The BEIS 2020 Q1 Heat Networks Pipeline Report associates this incinerator with a district heat network [Source]. (Entry updated 2021-03-19) | |
| Existing 725,000 (with plans to increase this to 1,018,000) | Ferrybridge Multifuel Facility 1 (FM1), near Ferrybridge C power station, Knottingley | enfinium (formerly Multifuel Energy Ltd) (owned by First Sentier Investors) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | FM1 is intended to treat a variety of waste-derived fuel. The facility was granted planning permission in October 2011 and received its first delivery in March 2015, and in July 2015 "entered full commercial operation" [Source, Source, Source]. There are contracts in place to send LACW-derived RDF from Hull [Source]; Derby (15,000 tpa of RDF); Wakefield [Source]; Barnsley, Doncaster and Rotherham [Source]; Cheshire West and Chester [Source, Source], Wigan [Source] and Bradford (150ktpa of waste) [Source]. In December 2020 Wheelabrator announced the sale of their UK EfW division to the European Diversified Infrastructure Fund III, an infrastructure fund managed by First Sentier Investors (FSI) [Source]. A permit consultation was launched in February2026 to increase the operation of the existing two lines and add a third line with a capacity of 268,210 tpa which would "bring the total annual throughout of Ferrybridge 1 to 1,018,000 tonnes" [EPR/SP3239FU/V010]. According to the permit application: "Planning consent for the development of Ferrybridge 1 was granted under section 36 consent in accordance with the requirements of the Electricity Act 1989. The section 36 consent allows for the construction of up to three boiler and steam turbines, and restricts the power generation of Ferrybridge 1 to 108 MWe. In accordance with the constraints of the planning consent, enfinium is applying to vary the EP [Environmental Permit] to allow for the construction of an additional waste processing line and flue gas treatment and energy generation systems (herein referred to as Line 3)". (Entry updated 2026-02-25) | |
| Existing 725,000 | Ferrybridge Multifuel Facility 2 (FM2), near Ferrybridge C power station, Knottingley | enfinium (formerly Multifuel Energy Ltd) (owned by First Sentier Investors) | Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development. | In January 2017 it was reported that construction was underway, with the facility expected to open in 2019 [Source]. FM2 was granted planing permission under a Development Consent Order to treat waste-derived fuels in October 2015 (see Planning Portal entry). An environmental permit was issued in November 2015 (EPR/YP3332WV) and varied in August 2018 to allow for IBA processing (EPR/XP3833DK). In July 2016 it was announced that Hitachi Zosen Inova was awarded construction contract, with facility scheduled to go online in 2019 and noted that arrangements for feedstock supply to FM2 had yet to be signed [Source]. Not to be confused with the neighbouring existing FM1 plant. Environmental permit granted in December 2015 (EPR/YP3332WV/A001). Reported in June 2017 that a 20-year contract has been agreed to take 50tkpa of RDF from Derby City Council and the Barsnley, Donacaster and Rotheram Waste Partnership [Source]. Green Investment Group pledged investment in the scheme in September 2017 [Source]. In September 2019 it was reported that hot commissioning was about to begin [Source]. In December 2020 Wheelabrator announced the sale of their UK EfW division to the European Diversified Infrastructure Fund III, an infrastructure fund managed by First Sentier Investors (FSI) [Source]. In April 2025 the planning consent was varied to allow non-RDF waste to be incinerateed [See documents]. (Entry updated 2026-02-25) | |
| Existing 435,000 | Skelton Grange, Leeds | enfinium (formerly Multifuel Energy Ltd) (owned by First Sentier Investors) | FoE Leeds / NIL: No Incinerator, Leeds | Planning permission granted to Biffa in February 2013 for a 300,000tpa conventional incinerator for C&I and possibly MSW [Source, Source, Source]. In May 2019 it was reported that Wheelabrator had secured the right to buy the site from the Harworth Group and that the intention was to increase capacity to 410,000tpa [Source, Source]. Planning reference for Biffa's 300ktpa plant is 11/03705 [See planning application]. Consultation on Environmental Permit application commenced in October 2019 [EPR/UP3904PA/A001]. In April 2020 it was reported that construction is due to commence in 2021 [Source]. A permit was granted in December 2020 [EPR/UP3904PA/A001]. In December 2020 Wheelabrator announced the sale of their UK EfW division to the European Diversified Infrastructure Fund III, an infrastructure fund managed by First Sentier Investors (FSI) [Source]. It was reported in July 2021 that full commissioning of the plant is planned for 2025 and that it will be built by HZI [Source]. In August 2022 it was reported that the facility was under construction "currently due to be fully commissioned in 2025" [Source]. In March 2025 it was reported that the Leeds plant had received its first waste delivery (as part of commissioning) and was due to be fully operational later in 2025 and that the scheme is associated with the Aire Valley Heat and Power Network which had "received £19.5 million in funding from the UK government's Green Heat Network Fund" [Source]. In June 2025 it was announced that Enfinium had signed a 3-year Power Purchase Agreement (from 2025 to 2028) to be serviced by the incinerator [Source]. In the 2025 Annual Performance Report it was stated that the plant had combusted 101,734 tpa of waste in Q4 2025 and that: "During March 2025 the facility entered the hot commissioning... However, delayed takeover of the facility from the EPC contractor Kanadevia Inova (KVI, formerly Hitachi Zosen Inova (HZI)) to Enfinium has meant that KVI has been the primary operator of the facility during 2025 and into 2026 until the takeover is formalised." (Entry updated 2026-04-20) | |
| Potential 148,000 | Land East Of Former Gas Works, Airedale Road, Keighley | Halton Group / JO Steel / Endless Energy | Aire Valley Against Incineration (Facebook group, Website) | Moving grate incinerator intended to burn RDF was granted planning permission in April 2014 (ref. 13/04217/FUL). The applicant did not appeal an August 2015 refusal to alter the planning consent (15/01381/FUL), but in November/December 2015 continued towards implementing the original planning consent by applying for non-material amendments and to discharge planning conditions (13/04217/NMA02 & 13/04217/SUB01) [Source]. These amendments/dischargements were subsequently approved [Source]. In August 2016 a new application was submitted for the plants anf these this was approved in February 2017 (Ref 16/06857/FUL). Environmental permit issued by the Environment Agency in December 2020 (EPR/ZP3537AT). In May 2024 it was reported by ENDS that this facility was "thought to be close to making financial close" [Source]. (Entry updated 2024-06-03) | |
Standard notice:
UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.