Menu Close

Incinerator information library

Information for Dudley Energy from Waste Facility, Lister Road, Dudley

Status: Existing
Planning Region: West Midlands
Planning Sub-Region: West Midlands Met Districts
Operator: FCC (who purchased Urbaser Environment Ltd in June 2024) - previously run by MES Environmental Limited
Capacity: 105,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: (Entry updated 2019-06-06)

Waste management for England 2024: Operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: HP3247QS

Date First PermittedOperator NameSite NameSite AddressTypePermitted Capacity (tonnage)Tonnage Incinerated in 2006Tonnage Incinerated in 2007Tonnage Incinerated in 2008Tonnage Incinerated in 2009Tonnage Incinerated in 2010Tonnage Incinerated in 2011Tonnage Incinerated in 2012Tonnage Incinerated in 2013Tonnage Incinerated in 2014Tonnage Incinerated in 2015Tonnage Incinerated in 2016Tonnage Incinerated in 2017Tonnage Incinerated in 2018Tonnage Incinerated in 2019Tonnage Incinerated in 2020Tonnage Incinerated in 2021Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024
01/12/2005URBASER ENVIRONMENTAL LIMITEDDudley Energy from Waste FacilityMES Environmental Ltd,Lister Road,,Dudley,Dudley,DY2 8JT DY2 8JTMunicipal and/or Industrial & Commercial105,00092,85994,76193,30093,44593,67991,32597,61589,66893,96190,88293,29295,21693,72698,51598,80897,14373,30176,42586,27073,30176,42586,270

Waste management for England 2023 & 2024: Waste received

2023: Uses data from 2023 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright
2024: Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: HP3247QS

Form: Solid

SOC Category: 10 - Mixed ordinary wastes

SOC Sub Category: Household and similar wastes

EWC Waste DescWaste CodeRecorded OriginOrigin WPAOrigin RegionFateR and D codeTonnes Received (2023)Tonnes Received (2024)
mixed municipal waste20 03 01DudleyDudleyWest MidlandsIncinerationD1068,01671,973
(+6%)
bulky waste20 03 07Not CodeableNot CodeableNot CodeableIncinerationD102,366
bulky waste20 03 07DudleyDudleyWest MidlandsIncinerationD108212,168
(+164%)
bulky waste20 03 07WolverhamptonWolverhamptonWest MidlandsIncinerationD104221,375
(+226%)
bulky waste20 03 07CeredigionWalesWalesIncinerationD103,8471,352
(-65%)
bulky waste20 03 07GloucesterGloucestershireSouth WestIncinerationD10251,250
(+4,900%)
bulky waste20 03 07CheshireCheshire (WPA not codeable)North WestIncinerationD10992
bulky waste20 03 07LeicestershireLeicestershireEast MidlandsIncinerationD10516
bulky waste20 03 07CardiffWalesWalesIncinerationD1070371
(+430%)
bulky waste20 03 07DoncasterDoncasterYorks & HumberIncinerationD10363
bulky waste20 03 07ShropshireShropshireWest MidlandsIncinerationD10127
mixed municipal waste20 03 01DudleyDudleyWest MidlandsIncinerationR0110,229
street-cleaning residues20 03 03DudleyDudleyWest MidlandsLandfillD012,337
bulky waste20 03 07Neath Port TalbotWalesWalesIncinerationD10872
mixed municipal waste20 03 01CeredigionWalesWalesIncinerationR01225
bulky waste20 03 07BirminghamBirmingham CityWest MidlandsIncinerationD1016

Environment Agency 2025 Pollution Inventory: Substances

Uses data from the Pollution Inventory 2025 snapshot from April 2025 released by the Environment Agency under the Open Government License. The data may change in the final version.

Permit: HP3247QS

SITE ADDRESS: Dudley Energy from Waste Facility Lister Road Dudley

ROUTE NAME: Air

SUBSTANCE NAMEQUANTITY RELEASED (kg)METHODNAMEMETHODTEXTMETHODDESCRIPTION
Carbon dioxide82,100,000MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Carbon Dioxide From Qualifying Renewable Fuel Sources49,500,000CalculatedBiogenic percentage identified through waste composition analysisOther calculation method
Nitrogen oxides (NO and NO2) as NO2102,000MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Nitrous oxide12,100MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Ammonia4,440MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Mercury5.64MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Dioxins and furans (PCDDs/PCDFs) - as ITEQ5.51MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Dioxins and furans (PCDDs/PCDFs) - as WHO TEQ0MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility

GHG Performance in 2023

Uses data from Pollution Inventory 2023 extract and Annual Peformance Reports submitted by operators and released by the Environment Agency under the Open Government License

Permit: HP3247QS

Permitted capacity (ktpa)Total waste combustedCO2 (kg)CO2 per tonne (kg)CO2 Source
10569,211266,161,0003,846Pollution Inventory

APR Summary 2024 & 2025

Details taken or derived from the Annual Performance Report submitted by the operator

Permit: HP3247QS

EntryValue (2024)Value (2025)Notes (2024)Notes (2025)
Plant Size TPA105,000105,000
Plant Size MWe7.157.00
(-2%)
Power Generated Year Total37,098.0037,429.00
(+0.9%)
Power Generated kWh per tonne430.02421.40
(-2%)
Power Exported Year Total30,144.0030,581.00
(+1%)
Power Exported kWh per tonne349.42344.30
(-1%)
Power Imported Year Total263.90292.28
(+11%)
Power Imported kWh per tonne3.063.29
(+8%)
Parasitic Load Year Total0.190.19
Thermal Energy Exported Year Total0.000.00
Total Waste Received Year Total85,698.5590,120.14
(+5%)
Total Waste Combusted Year Total86,269.8088,820.00
(+3%)
Household / Local Authority (86.75%)Household / Local Authority (81.35%)
Permit Breaches Year Total17.0016.00
(-6%)
Annual CO2 Mass75,895.8780,669.85
(+6%)
Use of CEMS to determine annual average CO2%, converted to mg/m3, multiplied by average stack flow multiplied by operational hoursUse of CO2 CEMS, average flow measurements from periodic monitoring
Annual CO2 Mass Per Tonne0.880.91
(+3%)
Annual CO2 Mass Per Mwh2.522.64
(+5%)
Annual N2O Mass9.7411.92
(+22%)
Annual average from CEMS, multiplie by annual average flow, multiplied by operational hoursUse of N2O CEMS, average flow measurements from periodic monitoring
Total CO2 N2O83,828.65
Biogenic CO2 Percentage0.850.60
(-29%)
Waste composition analysis undertaken by SocotecUse of 2023 waste sampling data due to 2024 result not deemed to be representative of the waste stream, and no results from 2025
Biogenic Percentage NCV0.850.60
(-29%)
Waste composition analysis undertaken by Socotec method CA32Use of 2023 waste sampling data due to 2024 result not deemed to be representative of the waste stream, and no results from 2025
Biogenic Percentage Mass0.60Use of 2023 waste sampling data due to 2024 result not deemed to be representative of the waste stream, and no results from 2025

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php/Dudley_EfW

Annual Performance Report files:

208-AnnualPerformanceReport-2018.pdf
208-AnnualPerformanceReport-2019.pdf
208-AnnualPerformanceReport-2020.xlsm
208-AnnualPerformanceReport-2021.xlsm
208-AnnualPerformanceReport-2022.xlsm
208-AnnualPerformanceReport-2023.xlsm
208-AnnualPerformanceReport-2024.xlsm
208-AnnualPerformanceReport-2024Corrected.xlsm
208-AnnualPerformanceReport-2025.xlsm

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.