Information for Embedded Advanced Thermal Treatment and CHP Plant, Land adjacent to former Unit D, Kingmoor Park Rockcliffe Estate, Rockcliffe

Status: Potential
Planning Region: North West
Planning Sub-Region: Carlisle
Operator: North West Recycling / North West Regeneration Ltd
Capacity: 24,000
Campaign Group(s): Carlisle Residents Against Incinerator (CRAIN) and Rockcliffe and District Action Group. Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Planning application for "Establishment of an Energy from Waste facility comprising of a Solid Recovered Fuel (SRF) fed Gasification Plant with a 20m high flue stack and associated synthetic gas fuelled Combined Heat & Power (CHP) generation engines..." submitted in November 2023 to Cumbria County Council (1/23/9005). The latest application amends the stack height to 23m. Planning Statement refers to "ETGAS Gasifier Units". Briefing Note from the Applicant states: "Due to the nature of the operations, the processes will require to be regulated either by the Local Authority as a Schedule 13A Small Waste Incineration (SWIP) Process or the Environment Agency (EA) as a Bespoke Waste Installation under Part A(1) Section 1.2(g) Combustion Activity of the Environmental Permitting Regulations (EPR regulations) dependent on scale". Section 1.2(g) relates to "Activities involving the liquefaction or gasification of other carbonaceous material". Planning application 1/23/9005 was refused by Cumberland Council in June 2025, with the applicant having lodging an appeal in December 2025. Campaigners are receiving support from a barrister to participate in the inquiry [Source, Source]. The hearings are due to begin on 2nd June 2026 and the appeal documents are on the Council website's appeal tab (3377058, 1/23/9005). (Entry updated 2026-02-25)

Planning Refusal files:

316-PlanningRefusal-2025.pdf

Environment Agency Compliance Assessment Reports

View the full UKWIN incinerator compliance index

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.