Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: This incinerator was temporarily shut down due to a fire in September 2017 [Source]. It was reported in November 2018 that the plant had experienced "a significant number of temporary shutdowns" since it re-opened in July 2018 [Source]. (Entry updated 2019-06-06)

Waste management for England 2024: Operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: RP3036QU

Date First PermittedOperator NameSite NameSite AddressTypePermitted Capacity (tonnage)Tonnage Incinerated in 2006Tonnage Incinerated in 2007Tonnage Incinerated in 2008Tonnage Incinerated in 2009Tonnage Incinerated in 2010Tonnage Incinerated in 2011Tonnage Incinerated in 2012Tonnage Incinerated in 2013Tonnage Incinerated in 2014Tonnage Incinerated in 2015Tonnage Incinerated in 2016Tonnage Incinerated in 2017Tonnage Incinerated in 2018Tonnage Incinerated in 2019Tonnage Incinerated in 2020Tonnage Incinerated in 2021Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024
09/11/2005SUEZ Recycling and Recovery UK LtdBolton Energy Recovery CentreBOLTON INCINERATOR,RAIKES LANE,BOLTON,BOLTON, BL3 1RPMunicipal and/or Industrial & Commercial127,100103,83287,38595,75484,93983,52586,85987,41379,42873,77391,27886,38950,20229,47588,21165,47881,38872,11781,37489,07272,11781,37489,072

Environment Agency 2024 & 2025 Pollution Inventory: Substances

2024: Uses data from the Pollution Inventory 2024 released by the Environment Agency under the Open Government License.
2025: Uses data from the Pollution Inventory 2025 snapshot from April 2025 released by the Environment Agency under the Open Government License. The data may change in the final version.

Permit: RP3036QU

SITE ADDRESS: Bolton Energy Recovery Centre Raikes Lane Lancashire

ROUTE NAME: Air

METHODNAME: Calculated

SUBSTANCE NAMEQUANTITY RELEASED (kg) (2024)QUANTITY RELEASED (kg) (2025)METHODTEXT (2024)METHODTEXT (2025)METHODDESCRIPTION (2024)METHODDESCRIPTION (2025)
Carbon dioxide88,212,00079,979,000
(-9%)
SUEZOther calculation methodCalculation method prescribed by us in an operating permit or licence for the facility
Carbon Dioxide From Qualifying Renewable Fuel Sources45,747,80036,870,000
(-19%)
SUEZOther calculation methodCalculation method prescribed by us in an operating permit or licence for the facility
Dioxins and furans (PCDDs/PCDFs) - as ITEQ0Calculation method prescribed by us in an operating permit or licence for the facility
Nickel75.60SUEZOther calculation method
Chromium29.40SUEZOther calculation method
Mercury1.59SUEZOther calculation method

GHG Performance in 2022

Uses data from operators collated for openDemocracy article "Some ‘renewable’ UK incinerators are more polluting than coal stations"

Permit: RP3036QU

Total waste combusted (Total)Electricity generated (MWh)Electricity imported (MWh)Electricity Exported (MWh)Annual mass of carbon dioxide released (t)CO2 SourceAnnual mass emissions of nitrous oxide (tonnes)N2O sourceBiogenic percentageBiogenic sourceTotal kg CO2e (including biogenic) per tonne combustedFossil kg CO2 per tonne combustedKg of fossil carbon equiv per MWh
72,11742,1851,67636,21555,492Calculated from reported CO2 volume fraction on the CEMS and the stack flowrate readings on an adjusted basis for each line0.59Calculated from periodic monitoring, operational hours and the stack flowrate readings on an adjusted basis for each line52.00%Assed from breakdown of waste composition from third-party reporting (M.E.L) in March 2022 and the respective carbon content of each component772369740

GHG Performance in 2023

Uses data from Pollution Inventory 2023 extract and Annual Peformance Reports submitted by operators and released by the Environment Agency under the Open Government License

Permit: RP3036QU

Permitted capacity (ktpa)Total waste combustedCO2 (kg)CO2 per tonne (kg)CO2 Source
12785,00084,602,000995Pollution Inventory

APR Summary 2024 & 2025

Details taken or derived from the Annual Performance Report submitted by the operator

Permit: RP3036QU

EntryValue (2024)Value (2025)Notes (2024)Notes (2025)
Plant Size TPA12,800128,000
(+900%)
Plant Size MWth4040
Plant Size MWe99
Power Generated Year Total66,642.0056,582.75
(-15%)
Power Generated kWh per tonne748.18782.73
(+5%)
Power Exported Year Total57,329.0048,904.70
(-15%)
Power Exported kWh per tonne643.63676.51
(+5%)
Power Imported Year Total909.00819.40
(-10%)
Power Imported kWh per tonne10.2111.34
(+11%)
Parasitic Load Year Total0.150.15
Thermal Energy Exported Year Total0.000.00
Total Waste Received Year Total93,853.0073,559.02
(-22%)
Total Waste Combusted Year Total89,072.0072,289.36
(-19%)
Household / Local Authority (100.16%)Household / Local Authority (100.00%)
Permit Breaches Year Total3.002.00
(-33%)
Annual CO2 Mass9,258,500.00%79,979.19(Yearly Stack Flow * % of CO2)* Density of CO2[CO2 Conc.]*1.963*[Avg. Stack Flowrate (Adjusted)]*[Operating Time]
Annual CO2 Mass Per Tonne1.041.11
(+7%)
Annual CO2 Mass Per Mwh161.00%1.64
Annual N2O Mass6.2837.38
(+495%)
(yearly average N2O mg/Nm3) * (stack flow volume for the year Nm3)[N2O Conc.]]*[Avg. Stack Flowrate (Adjusted)]*[Operating Time]*(10^-6)
Total CO2 N2O89,883.65
Biogenic CO2 Percentage52.00%0.46Quartlerly Sampling of WasteC14 Sampling Station set up on plant - single test from June 2026
Biogenic Percentage NCV0.420.36
(-14%)
Average of 3 Waste Samples for Q1, Q2 & Q3
Biogenic Percentage Mass52.00%0.44Average of 3 Waste Samples for Q1, Q2 & Q3

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php/Bolton_TRF

Annual Performance Report files:

73-AnnualPerformanceReport-2018.pdf
73-AnnualPerformanceReport-2019.pdf
73-AnnualPerformanceReport-2020.xlsm
73-AnnualPerformanceReport-2021.xlsm
73-AnnualPerformanceReport-2022.xlsm
73-AnnualPerformanceReport-2023.pdf
73-AnnualPerformanceReport-2024.xlsm
73-AnnualPerformanceReport-2024Corrected.xlsm
73-AnnualPerformanceReport-2025.xlsm

Permit Variation files:

73-PermitVariation-2023.pdf

Permit Variation Decision files:

73-PermitVariationDecision-2023.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.