Information for Port Clarence Energy Plant / "Teesside Renewable Energy Plant", Land at Clarence Works at Port Clarence Road , Port Clarence

Status: Existing
Planning Region: North East
Planning Sub-Region: Teesside
Operator: Port Clarence Energy Ltd (owned by Vital Energi)
Capacity: 333,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Construction commenced in 2015, but was halted in 2019 when the construction company was dropped [Source]. In April 2023 an application was made to vary the permit to allow the plant to burn RDF (EPR/MP3333WX/V004). In June 2023 it was reported that Womble Energy (linked to CoGen) was taking over this project to convert it to a 350ktpa incinerator (an increase over the previous 333ktpa figure). An updated permit which allows the plant to burn RDF was issued to Port Clarence Energy Limited in January 2024 with a capacity of 333ktpa. It was reported in March 2025 that Vital Energi had purchased Port Clarence Energy Ltd and was taking over the project and that it was understood that a historic structural steel issue had been "completely resolved" [Source]. In November 2025 it was reported that "N+P has signed a 10-year contract to supply Refuse Derived Fuel (RDF) to Vital Energi’s Energy from Waste (EfW) facility at Port Clarence" [Source]. (Entry updated 2025-12-09)

Waste management for England 2024: Non-operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: MP3333WX

Operator NameSite NameSite AddressTypePermitted Capacity (tonnes)Tonnage Incinerated in 2020Tonnage Incinerated in 2021Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024
Port Clarence Energy LtdTeesside Renewable Energy PlantLand at Clarence Works off Port Clarence Rd., Port Clarence, Stockton-on-TeesBiomass / Waste wood395,00000000

Permit files:

307-Permit-2024.pdf

Permit Decision files:

307-PermitDecision-2024.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.