Information for Selby Energy Recovery Plant, Aviation Road, Sherburn in Elmet
Status: PotentialPlanning Region: Yorkshire and the Humber
Planning Sub-Region: North Yorkshire
Operator: Energy Ventures No1 Ltd
Capacity: 240,000 (RDF and mixed waste)
Campaign Group(s): Sherburn-in-Elmet Parish Council. Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Originally proposed as an RDF gasification plant (2016/1456/EIA), with planning permission granted in June 2017. The permission was technically implemented in June 2020 to prevent it expiring. A Section 73 variation approved in 2021 (2021/1402/S73) changed the proposed technology to moving-grate incineration and increased capacity from 200,000 to 240,000 tpa. A further variation (ZG2025/0107/S73) was granted in October 2025 [Source]. In August 2026 another variation application was submitted (26/04654/DVCMAJ), including proposals for carbon capture and hydrogen production using electricity generated by the incinerator. Concerns have been raised about the extent of changes being made without a new planning application [Source]. The Environment Agency issued environmental permit EPR/AP3526LV on 24 September 2026 for incineration of up to 240,000 tpa of non-hazardous waste. The permit does not cover the proposed carbon capture and hydrogen production facilities [Source]. (Entry updated 2026-10-19)
Permit files:
243-Permit-2026.pdf243-Permit-SupportingInformation-2025.pdf
Permit Decision files:
243-PermitDecision-2026.pdfPlanning Consent Variation files:
243-PlanningConsentVariation-2025.pdfEnvironment Agency Compliance Assessment Reports
View compliance documents for this incineratorView the full UKWIN incinerator compliance index
Historic permit-related documents
See historic documents relating to permit AP3526LVStandard notice:
UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.