Information for Selby Energy Recovery Plant, Aviation Road, Sherburn in Elmet

Status: Potential
Planning Region: Yorkshire and the Humber
Planning Sub-Region: North Yorkshire
Operator: Energy Ventures No1 Ltd
Capacity: 240,000 (RDF and mixed waste)
Campaign Group(s): Sherburn-in-Elmet Parish Council. Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Planning permission 2016/1456/EIA for a conventional RDF and mixed waste incinerator techinically commenced in June 2020 to preserve the planning permission, but in In October 2025 planning permission was varied (ZG2025/0107/S73) to help make way for construction to actually commence. Permit application EPR/AP3526LV/A002, was submitted with documents dated August 2025, and a consultation ran between January 2026 and March 2026 [See consultation page], and the EA stated on 11 May 2026 that it was "currently in the application review stage". Planning history: The scheme is modified from the original application made in December 2016 for RDF gasification plant (ref 2016/1456/EIA) using a feedstock "sourced from recycling centres from outside of the Sherburn Industrial Estate" which was granted in October 2016. Some planning conditions were discharged by Selby District Council in 2020 (2020/0276/DOC) and a Section 73 application to vary conditions was approved in 2021 to increase the capacity to from 200ktpa to 240ktpa and changed the technology from "gasification" to "grate" technology (2021/1402/S73). (Entry updated 2026-06-30)

Permit files:

243-Permit-SupportingInformation-2025.pdf

Permit Variation files:

243-PermitVariation-2026.pdf

Permit Variation Decision files:

243-PermitVariationDecision-2026.pdf

Planning Consent Variation files:

243-PlanningConsentVariation-2025.pdf

Environment Agency Compliance Assessment Reports

View the full UKWIN incinerator compliance index

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.