Incinerator information library

Information for Land Off Sandall Stones Road, Kirk Sandall

Status: Potential
Planning Region: Yorkshire and the Humber
Planning Sub-Region: Doncaster
Operator: Low Carbon (previously BH EnergyGap (Doncaster) Ltd)
Capacity: 350,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Permit issued in September 2021 (EPR/SP3904SR). Planning application 20/01774/TIPA was granted planning permission in August 2022. Earlier planning application submitted to Doncaster Council in August 2020 for a conventional incinerator to treat C&I and/or municipal waste (ref 19/00954/CPL). In December 2020 it was reported that "BH Energy Gap (Doncaster) Ltd has applied to the Environment Agency for a permit" and that "Energy bosses said it would [use] 'advanced thermal treatment technology'" [Source]. According to the August 2020 non-technical summary for the permit application the proposal appears to be for a conventional moving grate incineration, with the "advanced" claim seemingly being a reference to what the permit application describes as the intention to "incorporate the latest advances in control and instrumentation technology" (EPR/SP3904SR/A001). The non-technical summary states that while the nominal capacity is 301ktpa the facility could potentially treat up to around 384ktpa depending on the calorific value of the feedstock [Source], and the permit lists a maximum throughput of 426,612 tpa. In July 2009 (ref 09/00246/TIPA) planning permission was issued for a "Proposed energy recovery facility involving gasification of (household and commercial) waste". A different gasification proposal on the site was approved in May 2018 (17/00923/TIPA), but in May 2019 the Council refused to issue a certificate of lawfulness to operate the site with conventional incineration technology (19/00954/CPL). ENDS reported in December 2024 that this project had yet to reach financial close [Source]. In December 2025 it was reproted that CVC DIF would be refinancing the project's debt through DIF Infrastructure VIII "and is expected to close during the fourth quarter of 2025, subject to customary closing conditions", creating a new partnership alongside MassMutual. [Source]. (Entry updated 2025-12-09)

R1 status of incinerators - 8 April 2026 (Environment Agency)

Uses data from R1 status of incinerators in England released by the Environment Agency. © Environment Agency copyright and/or database right 2026. All rights reserved.

Permit: SP3904SR

OperatorInstallation nameInstallation addressPermit statusWaste input (000s tonnes per annum)Incinerator typeCalculated R1 valueApplication R1 status grantedSource of data used in R1 calculationsDate R1 application status granted
BH EnergyGap (Doncaster) LimitedDoncaster Energy Recovery FacilitySandall Stones Road, Kirk Sandall, DoncasterPermit issued350Municipal waste0.82YesDesign13/10/2022

Permit files:

235-Permit-2021.pdf

Permit Decision files:

235-PermitDecision-2021.pdf

Permit Objection files:

235-PermitObjection-from-UKWIN-August-2021.pdf

Planning Consent files:

235-PlanningConsent-2022.pdf

U K W I N Permit Consultation Submission1 files:

235-UKWINPermitConsultationSubmission1-2021.pdf

U K W I N Permit Consultation Submission2 files:

235-UKWINPermitConsultationSubmission2-2021.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.