Menu Close

Incinerator information library

Information for Hangar Building, Rudford Industrial Estate, Ford

Status: Potential
Planning Region: South East
Planning Sub-Region: West Sussex
Operator: SCS Waste (Hoare Construction Holdings Limited / South Coast Skips Limited)
Capacity: 15,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Vote to grant planning permission granted by West Sussex County Council passed on 10th January 2023. Application reference WSCC/015/22 for change of use of existing hangar building, with planning consent issued in September 2023. A SWIP incinerator intended to use RDF generated from the adjacent Waste Transfer Station. SWIP permit application is dated November 2023 (See consultation page) (Entry updated 2023-01-12)

Planning Consent files:

299-PlanningConsent-2023.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.