Information for Wolverhampton Energy from Waste Plant, Crown Street, Wolverhampton

Status: Existing
Planning Region: West Midlands
Planning Sub-Region: West Midlands Met Districts
Operator: North Midlands Operations Ltd (NMOL) - previously run by MES Environmental Limited
Capacity: 118,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: (Entry updated 2019-06-06)

Waste management for England 2024: Operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: HP3349QK

Date First PermittedOperator NameSite NameSite AddressTypePermitted Capacity (tonnage)Tonnage Incinerated in 2006Tonnage Incinerated in 2007Tonnage Incinerated in 2008Tonnage Incinerated in 2009Tonnage Incinerated in 2010Tonnage Incinerated in 2011Tonnage Incinerated in 2012Tonnage Incinerated in 2013Tonnage Incinerated in 2014Tonnage Incinerated in 2015Tonnage Incinerated in 2016Tonnage Incinerated in 2017Tonnage Incinerated in 2018Tonnage Incinerated in 2019Tonnage Incinerated in 2020Tonnage Incinerated in 2021Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024
01/12/2005North Midlands Operations LtdWolverhampton Energy from Waste FacilityWaste to Energy Plant,Crown Street,Wolverhampton,West Midlands WV1 1QBMunicipal and/or Industrial & Commercial118,000100,773104,356107,231109,991108,817106,088109,992109,280110,132104,164110,759112,213110,298114,412114,425111,937109,91797,58288,372109,91797,58288,372

Waste management for England 2023 & 2024: Waste received

2023: Uses data from 2023 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright
2024: Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: HP3349QK

Form: Solid

EWC Waste Desc: mixed municipal waste

Waste Code: 20 03 01

Fate: Incineration

SOC Category: 10 - Mixed ordinary wastes

SOC Sub Category: Household and similar wastes

Recorded OriginOrigin WPAOrigin RegionR and D codeTonnes Received (2023)Tonnes Received (2024)
WolverhamptonWolverhamptonWest MidlandsR0167,58753,799
(-20%)
WolverhamptonWolverhamptonWest MidlandsD10.0117,744
North NorthamptonshireNorthamptonshireEast MidlandsR0113,238
North NorthamptonshireNorthamptonshireEast MidlandsD10.015,370
NorthamptonshireNorthamptonshireEast MidlandsR0129,458
DudleyDudleyWest MidlandsR01408

Environment Agency 2024 & 2025 Pollution Inventory: Substances

2024: Uses data from the Pollution Inventory 2024 released by the Environment Agency under the Open Government License.
2025: Uses data from the Pollution Inventory 2025 snapshot from April 2025 released by the Environment Agency under the Open Government License. The data may change in the final version.

Permit: HP3349QK

SITE ADDRESS: Waste to Energy Plant Crown Street

ROUTE NAME: Air

SUBSTANCE NAMEQUANTITY RELEASED (kg) (2024)QUANTITY RELEASED (kg) (2025)METHODNAME (2024)METHODNAME (2025)METHODTEXTMETHODDESCRIPTION (2024)METHODDESCRIPTION (2025)
Carbon dioxide83,323,00072,457,000
(-13%)
Carbon Dioxide From Qualifying Renewable Fuel Sources45,077,00032,919,000
(-27%)
EstimatedCalculatedOther calculation method
Ammonia1,9721,120
(-43%)
Dioxins and furans (PCDDs/PCDFs) - as ITEQ0MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Dioxins and furans (PCDDs/PCDFs) - as WHO TEQ0MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Polychlorinated biphenyls (PCBs) - as WHO TEQ0MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Chromium78.63MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Mercury2.41MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Arsenic2.15MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility

GHG Performance in 2023

Uses data from Pollution Inventory 2023 extract and Annual Peformance Reports submitted by operators and released by the Environment Agency under the Open Government License

Permit: HP3349QK

Permitted capacity (ktpa)Total waste combustedCO2 (kg)CO2 per tonne (kg)CO2 Source
11898,03992,352,738942Annual Performance Report

APR Summary 2024 & 2025

Details taken or derived from the Annual Performance Report submitted by the operator

Permit: HP3349QK

EntryValue (2024)Value (2025)Notes (2024)Notes (2025)
Plant Size TPA118,000118,000
Plant Size MWth33.97
Plant Size MWe6.90
Power Generated Year Total21,096.0035,726.00
(+69%)
Power Generated kWh per tonne238.72399.47
(+67%)
Power Exported Year Total11,964.0029,515.00
(+147%)
Power Exported kWh per tonne135.38330.02
(+144%)
Power Imported Year Total0.001,469.70
Power Imported kWh per tonne16.43
Parasitic Load Year Total0.430.21
(-51%)
Thermal Energy Exported Year Total0.00%0.00
Total Waste Received Year Total90,217.0088,444.00
(-2%)
Total Waste Combusted Year Total8,837,200.00%89,433.00Household / Local Authority (79.37%)Household / Local Authority (80.99%)
NCV Year Total8.32
Permit Breaches Year Total5.006.00
(+20%)
Annual CO2 Mass83,323.0072,456.61
(-13%)
Annual CO2 Mass Per Tonne0.940.81
(-14%)
Annual CO2 Mass Per Mwh6.962.45
(-65%)
Annual N2O Mass8.806.17
(-30%)
Total CO2 N2O74,092.13
Biogenic CO2 Percentage0.540.56
(+4%)
Waste compositional analysis.Waste compositional analysis by NCV.
Biogenic Percentage NCV0.540.56
(+4%)
Waste compositional analysis.Waste compositional analysis by NCV.
Biogenic Percentage Mass0.540.68
(+26%)
In accordance with Ofgem-approved fuel measurement and sampling plan.Waste compositional analysis by mass.

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php/Wolverhampton_EfW

Annual Performance Report files:

210-AnnualPerformanceReport-2018.pdf
210-AnnualPerformanceReport-2019.pdf
210-AnnualPerformanceReport-2020.xlsm
210-AnnualPerformanceReport-2021.xlsm
210-AnnualPerformanceReport-2022.xlsm
210-AnnualPerformanceReport-2023.xlsm
210-AnnualPerformanceReport-2024.xlsm
210-AnnualPerformanceReport-2025.xlsm

Permit Variation files:

210-PermitVariation-2023.pdf

Permit Variation Decision files:

210-PermitVariationDecision-2023.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.