Information for Combined Heat & Power Thermal Treatment System, 113 Milltown Road, Tullymore Otra, Milltown, Armagh (near Benburb)
Status: PotentialPlanning Region: Northern Ireland
Planning Sub-Region: Armagh City Banbridge and Craigavon
Operator: AIC Group
Capacity: 7,728
Campaign Group(s): Residents Against Incineration [FB Page]
Notes: A pre-application "community engagement meeting" was held in December 2025 for a proposed small waste incineration plant (SWIP) intended to treat a mix of hazardous (10-15%) and non-hazardous (85-90%) waste from Northern Ireland [Source]. A revised Pre-Application Notification was approved in March 2026 to hold a drop-in event on 1st May 2026 and a webpage to be live for at least 28 days. As of 30 June 2026 the PAN webpage is no longer online. (Entry updated 2026-06-30)
Environment Agency Compliance Assessment Reports
Click here to see the incinerator compliance documents for existing English incineratorsStandard notice:
UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.