Information for Bio-Substitute Renewable Fuels Facility / "Protos Energy Hub", Protos, Grinsome Road, Ellesmere Port

Status: Potential
Planning Region: North West
Planning Sub-Region: Cheshire
Operator: Peel Environmental and Progressive Energy
Capacity: 175,000 (RDF and Waste Wood)
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Planning application for a gasification-type incinerator to treat waste wood and RDF and convert it into transport fuels was approved in November 2019 [Source, Source] (Planning reference 18/04671/WAS). It was reported in March 2019 that a planning had been submitted for a gasification facility intended to convert RDF and Grade B and C Waste Wood into a gas for possible injection in to the Grid [Source]. Planning permission18/04671/WAS approved in March 2022. It was reported in February 2024 that "construction work is yet to be confirmed on a bio-substitute natural gas renewable fuels facility" [Source]. As of August 2024 the project was not listed by the developer as an active project [Source]. (Entry updated 2024-08-22)

Planning Consent files:

76-PlanningConsent-2022.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.