Menu Close

Incinerator information library

Information for Hythe End Farm ERF, Fowles Crushed Concrete, Hythe End Farm, Hythe End Road, Wraysbury, Staines

Status: Potential
Planning Region: South East
Planning Sub-Region: Windsor and Maidenhead
Operator: Wraysbury Resource Management Limited (was previously listed as Fowles Crushed Concrete Limited)
Capacity: 150,000
Campaign Group(s): Hythe End Road Estate Limited and its chair Simon are a contact point for those opposing this development. Contact coordinator@ukwin.org.uk to be put in touch with others opposing this development.
Notes: Scoping opinion issued by Royal Borough of Windsor and Maidenhead in May 2025 (24/02253/EIASCO) but no sign of planning application of May 2025. No indication within the scoping request that this site is intended as a replacement for the Lakeside incinerator, but the site is being proposed near to Heathrow airport. According to the applicant's scoping request: "The waste will be primarily commercial and industrial waste (C&I), but the facility will be capable of treating residual municipal waste in the event it is awarded a local authority contract". (Entry updated 2025-06-25)

Scoping Opinion files:

329-ScopingOpinion-2025.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.