Information for Edmonton Solid Waste Incinerator, Advent Way, Edmonton

Status: Existing
Planning Region: London
Planning Sub-Region: North London
Operator: LondonEnergy (formerly London Waste Ltd)
Capacity: 560,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: The North London Waste Authority currently seem to intend to keep using Edmonton until 2025, with a replacement Energy from Waste facility expected to be in place by 2025 to keep the district heating scheme running [Source]. (Entry updated 2021-10-04)

Waste management for England 2024: Operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: YP3033BE

Date First PermittedOperator NameSite NameSite AddressTypePermitted Capacity (tonnage)Tonnage Incinerated in 2006Tonnage Incinerated in 2007Tonnage Incinerated in 2008Tonnage Incinerated in 2009Tonnage Incinerated in 2010Tonnage Incinerated in 2011Tonnage Incinerated in 2012Tonnage Incinerated in 2013Tonnage Incinerated in 2014Tonnage Incinerated in 2015Tonnage Incinerated in 2016Tonnage Incinerated in 2017Tonnage Incinerated in 2018Tonnage Incinerated in 2019Tonnage Incinerated in 2020Tonnage Incinerated in 2021Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024
01/08/2005London Energy LtdEdmonton EfW FacilityEdmonton EfW,Advent Way,LONDON, N18 3AGMunicipal and/or Industrial & Commercial675,000502,506513,622521,246383,153486,092541,098545,296516,581558205542429547,721511,266510,831498,165541,976515,217488,730483,917495,549488,730483,917495,549

Waste management for England 2023 & 2024: Waste received

2023: Uses data from 2023 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright
2024: Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: YP3033BE

Form: Solid

Fate: Incineration

R and D code: D10.01

EWC Waste DescWaste CodeRecorded OriginOrigin WPAOrigin RegionSOC CategorySOC Sub CategoryTonnes Received (2023)Tonnes Received (2024)
mixed municipal waste20 03 01LondonLondon (WPA Not codeable)London10 - Mixed ordinary wastesHousehold and similar wastes355,963285,559
(-20%)
combustible waste (refuse derived fuel)19 12 10LondonLondon (WPA Not codeable)London10 - Mixed ordinary wastesSorting residues83,742101,544
(+21%)
mixed municipal waste20 03 01IslingtonIslingtonLondon10 - Mixed ordinary wastesHousehold and similar wastes24,623100,428
(+308%)
mixed municipal waste20 03 01HertfordshireHertfordshireEast of England10 - Mixed ordinary wastesHousehold and similar wastes12,6763,707
(-71%)
mixed municipal waste20 03 01Barking and DagenhamBarking and DagenhamLondon10 - Mixed ordinary wastesHousehold and similar wastes6,3001,907
(-70%)
wastes whose collection and disposal is not subject to special requirements in order to prevent infection(for example dressings, plaster casts, linen, disposable clothing, diapers)18 01 04LondonLondon (WPA Not codeable)London10 - Mixed ordinary wastesMixed and undifferentiated materials277290
(+5%)
mixed municipal waste20 03 01EssexEssexEast of England10 - Mixed ordinary wastesHousehold and similar wastes244
animal faeces, urine and manure (including spoiled straw), effluent, collected separately and treated off-site02 01 06LondonLondon (WPA Not codeable)London09 - Animal and vegetal wastesSlurry and manure3826
(-32%)
animal faeces, urine and manure (including spoiled straw), effluent, collected separately and treated off-site02 01 06City of LondonCity of LondonLondon09 - Animal and vegetal wastesSlurry and manure8
mixed municipal waste20 03 01City of LondonCity of LondonLondon10 - Mixed ordinary wastesHousehold and similar wastes27
(+250%)
mixed municipal waste20 03 01BedfordshireEast of England (WPA not codeable)East of England10 - Mixed ordinary wastesHousehold and similar wastes3
materials unsuitable for consumption or processing02 02 03LondonLondon (WPA Not codeable)London09 - Animal and vegetal wastesWaste of food preparation and products<1<1
biodegradable kitchen and canteen waste20 01 08LondonLondon (WPA Not codeable)London09 - Animal and vegetal wastesWaste of food preparation and products275
combustible waste (refuse derived fuel)19 12 10Milton KeynesMilton KeynesSouth East10 - Mixed ordinary wastesSorting residues112
wastes whose collection and disposal is not subject to special requirements in order to prevent infection(for example dressings, plaster casts, linen, disposable clothing, diapers)18 1 04Milton KeynesMilton KeynesSouth East10 - Mixed ordinary wastesMixed and undifferentiated materials25
other non-biodegradable wastes20 02 03LondonLondon (WPA Not codeable)London12 - Mineral wastesNaturally occurring minerals1

Waste management for England 2023 & 2024: Waste removed

2023: Uses data from 2023 Waste Data Interrogator - Version 1 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright
2024: Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: YP3033BE

EWC Sub ChapterEWC Waste DescWaste CodeRecorded DestinationDestination WPADestination RegionFateR and D codeSOC CategorySOC Sub CategoryTonnes Removed (2023)Tonnes Removed (2024)
Incineration or pyrolysis of wastebottom ash and slag other than those mentioned in 19 01 1119 01 12KentKentSouth EastRecoveryR0512 - Mineral wastesCombustion wastes9,004.3670,349.72
(+681%)
Incineration or pyrolysis of wastebottom ash and slag other than those mentioned in 19 01 1119 01 12BuckinghamshireBuckinghamshireSouth EastRecoveryR0512 - Mineral wastesCombustion wastes66,324.3917,800.37
(-73%)
Incineration or pyrolysis of wastesolid wastes from gas treatment19 01 07*DerbyshireDerbyshireEast MidlandsTransfer (D)D1512 - Mineral wastesCombustion wastes7,391.8411,715.22
(+58%)
Incineration or pyrolysis of wasteferrous materials removed from bottom ash19 01 02LondonLondon (WPA Not codeable)LondonRecoveryR0406 - Metallic wastesFerrous metal waste and scrap23,808.004,805.33
(-80%)
Incineration or pyrolysis of wastebottom ash and slag other than those mentioned in 19 01 1119 01 12LondonLondon (WPA Not codeable)LondonTransfer (D)D1512 - Mineral wastesCombustion wastes3,028.383,028.38
Incineration or pyrolysis of wastebottom ash and slag other than those mentioned in 19 01 1119 01 12LondonLondon (WPA Not codeable)LondonRecoveryR0512 - Mineral wastesCombustion wastes1,900.36
Incineration or pyrolysis of wasteferrous materials removed from bottom ash19 01 02HampshireHampshireSouth EastRecoveryR0406 - Metallic wastesFerrous metal waste and scrap4,640.521,617.76
(-65%)
Incineration or pyrolysis of wasteferrous materials removed from bottom ash19 01 02NewportWalesRecoveryR0406 - Metallic wastesFerrous metal waste and scrap770.38
Physico/chemical treatments of waste (including dechromatation - decyanidation - neutralisation)sludges from physico/chemical treatment other than those mentioned in 19 02 0519 02 06Milton KeynesMilton KeynesSouth EastLandfillD0503 - Other chemical wastesIndustrial effluent sludges535.62759.72
(+42%)
Other municipal wastesstreet-cleaning residues20 03 03LondonLondon (WPA Not codeable)LondonTransfer (D)D1510 - Mixed ordinary wastesHousehold and similar wastes69.40724.70
(+944%)
Physico/chemical treatments of waste (including dechromatation - decyanidation - neutralisation)sludges from physico/chemical treatment containing dangerous substances19 02 05*Milton KeynesMilton KeynesSouth EastTreatmentD0903 - Other chemical wastesIndustrial effluent sludges259.78
Physico/chemical treatments of waste (including dechromatation - decyanidation - neutralisation)sludges from physico/chemical treatment containing dangerous substances19 02 05*Milton KeynesMilton KeynesSouth EastLandfillD0503 - Other chemical wastesIndustrial effluent sludges166.76
Incineration or pyrolysis of wastebottom ash and slag other than those mentioned in 19 01 1119 01 12CambridgeshireCambridgeshireEast of EnglandRecoveryR0512 - Mineral wastesCombustion wastes6,762.66
Incineration or pyrolysis of wastesolid wastes from gas treatment19 01 07*DerbyshireDerbyshireEast MidlandsTreatmentD0912 - Mineral wastesCombustion wastes3,819.00
Incineration or pyrolysis of wasteferrous materials removed from bottom ash19 01 02NewportWalesWalesRecoveryR0406 - Metallic wastesFerrous metal waste and scrap1,881.52
Mechanical treatment of waste (for example sorting - crushing - compacting - pelletising) not otherwise specifiedferrous metal19 12 02HampshireHampshireSouth EastRecoveryR0406 - Metallic wastesFerrous metal waste and scrap1,522.42
Incineration or pyrolysis of wastebottom ash and slag other than those mentioned in 19 01 1119 01 12DerbyshireDerbyshireEast MidlandsRecoveryR0512 - Mineral wastesCombustion wastes1,269.10
Mechanical treatment of waste (for example sorting - crushing - compacting - pelletising) not otherwise specifiedferrous metal19 12 02NewportWalesWalesRecoveryR0406 - Metallic wastesFerrous metal waste and scrap1,238.52
Physico/chemical treatments of waste (including dechromatation - decyanidation - neutralisation)sludges from physico/chemical treatment other than those mentioned in 19 02 0519 02 06BuckinghamshireBuckinghamshireSouth EastLandfillD0503 - Other chemical wastesIndustrial effluent sludges878.92
Other municipal wastesbulky waste20 03 07LondonLondon (WPA Not codeable)LondonTransfer (D)D1510 - Mixed ordinary wastesHousehold and similar wastes164.65

Environment Agency 2024 & 2025 Pollution Inventory: Substances

2024: Uses data from the Pollution Inventory 2024 released by the Environment Agency under the Open Government License.
2025: Uses data from the Pollution Inventory 2025 snapshot from April 2025 released by the Environment Agency under the Open Government License. The data may change in the final version.

Permit: YP3033BE

SITE ADDRESS: Edmonton Ecopark Advent Way London

METHODNAME: Measured

ROUTE NAMESUBSTANCE NAMEQUANTITY RELEASED (kg) (2024)QUANTITY RELEASED (kg) (2025)METHODTEXTMETHODDESCRIPTION (2024)METHODDESCRIPTION (2025)
AirCarbon dioxide434,379,000516,865,000
(+19%)
AirCarbon Dioxide From Qualifying Renewable Fuel Sources256,283,000310,119,000
(+21%)
Measurement method prescribed by us in an operating permit or licence for the facilityAlternative measurement method in accordance with existing CEN/ISO measurement standards
AirNitrogen oxides (NO and NO2) as NO2634,000666,000
(+5%)
National or regional binding measurement method prescribed by legal act for the substance and facility concernedMeasurement method prescribed by us in an operating permit or licence for the facility
AirNitrous oxide46,10051,500
(+12%)
AirChlorine and inorganic chlorine compounds - as HCl26,20029,900
(+14%)
AirAmmonia31,30027,500
(-12%)
AirParticulate matter - PM102,6002,390
(-8%)
AirParticulate matter - PM2.52,6002,390
(-8%)
AirNickel14.1044.48
(+215%)
AirChromium12.6032.34
(+157%)
WastewaterCopper41.4122.83
(-45%)
AirCopper15.2014.44
(-5%)
AirMercury10.8010.63
(-2%)
AirCadmium4.272.12
(-50%)
AirArsenic2.141.63
(-24%)
WastewaterCadmium1.531.25
(-18%)
AirDioxins and furans (PCDDs/PCDFs) - as ITEQ0.00
AirDioxins and furans (PCDDs/PCDFs) - as WHO TEQ0.00
AirPolychlorinated biphenyls (PCBs) - as WHO TEQ0.00Measurement method prescribed by us in an operating permit or licence for the facility
WastewaterZinc139.00Measurement method prescribed by us in an operating permit or licence for the facility

GHG Performance in 2022

Uses data from operators collated for openDemocracy article "Some ‘renewable’ UK incinerators are more polluting than coal stations"

Permit: YP3033BE

Total waste combusted (Total)Electricity generated (MWh)Electricity imported (MWh)Electricity Exported (MWh)Annual mass of carbon dioxide released (t)CO2 SourceAnnual mass emissions of nitrous oxide (tonnes)N2O sourceBiogenic percentageBiogenic sourceTotal kg CO2e (including biogenic) per tonne combustedFossil kg CO2 per tonne combustedKg of fossil carbon equiv per MWh
488,730247,481434210,388144,951Data from CO2 CEMS24.04Data from N2O CEMS bi-annual monitoring30.90%Waste sampling data311205510

GHG Performance in 2023

Uses data from Pollution Inventory 2023 extract and Annual Peformance Reports submitted by operators and released by the Environment Agency under the Open Government License

Permit: YP3033BE

Permitted capacity (ktpa)Total waste combustedCO2 (kg)CO2 per tonne (kg)CO2 Source
560483,917390,818,300808Pollution Inventory

APR Summary 2024 & 2025

Details taken or derived from the Annual Performance Report submitted by the operator

Permit: YP3033BE

EntryValue (2024)Value (2025)Notes (2024)Notes (2025)
Plant Size TPA750,000Edmonton EfW
Plant Size MWe5,400,000.0028.50
(-100%)
Power Generated Year Total252,760.00257,932.00
(+2%)
Power Generated kWh per tonne510.06519.54
(+2%)
Power Exported Year Total212,406.00153,510.00
(-28%)
Power Exported kWh per tonne428.63309.21
(-28%)
Power Imported Year Total32.00508.00
(+1,488%)
Power Imported kWh per tonne0.061.02
(+1,600%)
Parasitic Load Year Total0.160.41
(+156%)
Thermal Energy Exported Year Total0.000.00
Total Waste Received Year Total504,625.60497,809.05
(-1%)
Total Waste Combusted Year Total495,549.00496,465.00
(+0.2%)
Household / Local Authority (79.38%)Household / Local Authority (98.88%)
Permit Breaches Year Total38.0025.00
(-34%)
Annual CO2 Mass434,412.80516,866.20
(+19%)
Calculated using CEMS dataMass emissions are calculated on a minute by minute basis using CEMS concentration and flow data, in accordance with BS EN 14181 and 16911-2.
Annual CO2 Mass Per Tonne88.00%1.04
Annual CO2 Mass Per Mwh2.053.37
(+64%)
Annual N2O Mass46.0651.53
(+12%)
Calculated using CEMS dataMass emissions are calculated on a minute by minute basis using CEMS concentration and flow data, in accordance with BS EN 14181 and 16911-2.
Total CO2 N2O516,917.73
Biogenic CO2 Percentage0.600.60Two C14 spot samples were taken in the year, in March and in OctoberTwo C-14 spot samples taken in the year, one in March and one in October
Biogenic Percentage NCV0.590.64
(+8%)
Waste sampling and biogenic analysis is carried out by an independent contractor. The analysis is done in accordance with ISO 21644:2021Waste sampling and biogenic analysis is carried out by an independent contractor in accordance with ISO 21644:2021.
Biogenic Percentage Mass0.590.65
(+10%)

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php/Edmonton_EcoPark_EfW

Information for Edmonton EcoPark AKA "North London Heat and Power Plant", near the Edmonton Solid Waste Incinerator on Advent Way, Edmonton

Status: Potential
Planning Region: London
Planning Sub-Region: North London
Operator: North London Waste Authority
Capacity: 700,000
Campaign Group(s): Stop The Edmonton Incinerator Rebuild and Extinction Rebellion
Notes: Incinerator proposed to replace existing Edmonton incinerator by around 2025, to be located next to the current incinerator site. Consultation began in November 2014, with a second phase of consultation in June 2015 [Source]. A Development Consent Order was issue by BEIS in February 2017 and "construction preparation could start in 2019. The existing plant would be decommissioned and demolished 2028, once the new facility up and running." [Source, Source, See dedicated webpage]. Environmental Permit issue in June 2017 [EPR/UP3232AC/A001]. In May 2024 the Environment Agency listed the facility status as "construction not started" but according to the project website construction started at the site in 2019 [Source]. It was reported in August 2024 that "High costs and labour shortages could delay the opening of the new Edmonton incinerator by two years, according to officials" and that "the NLWA, which is leading the project, said the incinerator will not be fully up and running until 2027, because of a 'challenging period' for the construction industry" [Source]. In August 2025 it was reported that "the construction of the new Edmonton incinerator is continuing to drag amid a series of local and international challenges" and that the 2027 completion date is now in doubt, with Delays were attributed in part to "challenges being faced by [sub-contractor] Acciona" by NLWA chair Councillor Clyde Loakes [Source]. (Entry updated 2025-09-23)

Plume Plotter entry for Edmonton


This pollution prediction was produced by Plume Plotter. Click here for more details.

R1 status of incinerators - 8 April 2026 (Environment Agency)

Uses data from R1 status of incinerators in England released by the Environment Agency. © Environment Agency copyright and/or database right 2026. All rights reserved.

Permit: UP3232AC

OperatorInstallation nameInstallation addressPermit statusWaste input (000s tonnes per annum)Incinerator typeCalculated R1 valueApplication R1 status grantedSource of data used in R1 calculationsDate R1 application status granted
North London Waste AuthorityEdmonton EcoparkEdmonton EcoPark, Advent Way, London, N128 3AGPermit issued700Municipal waste0.8YesDesign05/12/2016

Waste management for England 2024: Pre-operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: UP3232AC

Operator NameSite NameSite AddressFormer Planning RegionFormer Planning Sub-RegionTypePermitted Capacity (tonnes)
North London Waste AuthorityEdmonton EcoParkEdmonton EcoPark,Advent Way,LONDON, N18 3AGLondonNorth LondonMunicipal and/or Industrial & Commercial675,000

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php/North_London_Heat_and_Power_(Edmonton_EcoPark_Replacement)

Annual Performance Report files:

48-AnnualPerformanceReport-2018.pdf
48-AnnualPerformanceReport-2019.xlsm
48-AnnualPerformanceReport-2020.xlsm
48-AnnualPerformanceReport-2021.xlsm
48-AnnualPerformanceReport-2022.xlsm
48-AnnualPerformanceReport-2023.xlsm
48-AnnualPerformanceReport-2024.xlsm
48-AnnualPerformanceReport-2024Corrected.xlsm
48-AnnualPerformanceReport-2025.xlsm

Permit Variation files:

48-PermitVariation-2023.pdf

Permit Variation Decision files:

48-PermitVariationDecision-2023.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.