Information for Bulk Processing Unit, Clean Energy Technology Park, near the Sprinfields nuclear fuel production installation, Station Road, Salwick, Preston

Status: Potential
Planning Region: North West
Planning Sub-Region: Lancashire
Operator: Perma-Fix / Westinghouse
Capacity: c. 1,000 tpa of low and intermediate-level radioactive material
Campaign Group(s): Radiation Free Lakeland
Notes: Announced in March 2022 as a "refractory lined oven" called a "Bulk Processing Unit (BPU)" intended to treat "a wide range of low and intermediate-level radioactive material" [Source]. In April 2022 the Environment Agency stated: "The Environment Agency has been approached by Westinghouse UK and Springfields Fuels Limited to discuss the potential for a Perma-Fix waste treatment facility to be constructed and operated at the Springfields site. We have provided advice and guidance on the permitting requirements for such a facility, and the information that would need to be submitted to us in order to proceed with a permit determination. At this early stage, we have not had sight of detailed design proposals for the facility and we have not been given an indication of when a permit application could be submitted." [Source]. No sign of a planning or permit application as of August 2024. (Entry updated 2024-08-22)

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.