Information for Green Energy Facility / "Halesfield EfW", Site 2, Halesfield 21, Halesfield

Status: Potential
Planning Region: West Midlands
Planning Sub-Region: Telford and Wrekin
Operator:
Capacity: 25,500
Campaign Group(s): Contact
coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Planning permission approved in September 2021. Intended to treat pre-pared RDF (TWC/2021/0552). According to the planning application: "This fuel will be fired in a Rotary Kiln furnace from which the flue gases will go into a steam boiler". According to the April 2023 REPD database the plant had yet to enter construction. (Entry updated 2023-05-25)

Planning Consent files:

305-PlanningConsent-2021.doc

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.