Menu Close

Incinerator information library

Information for Southmoor Energy Centre, Kellingley Colliery, Weeland Road (near Knottingley)

Status: Potential
Planning Region: Yorkshire and the Humber
Planning Sub-Region: North Yorkshire
Operator: Peel Environmental / Harworth Estates (HEPGL) / Southmoor Energy Centre Limited
Capacity: 350,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Planning application for an incinerator submitted in May 2013 (planning application NY/2013/0128/ENV), and planning consent was issued February 2016. Peel stated in 2013: "It will use up to 280,000 tonnes per year of non-hazardous residual waste including industrial, commercial and possibly household from across the region" [Source]. Peel announced in March 2019 that "Plans...are progressing, with the company expecting to be on site in Autumn 2019" and stated that: "Peel Environmental is proposing to make some changes to the existing planning permission, one of which is to increase the fuel for the facility from 280,000 tonnes to 350,000 tonnes per year" and that "A Section 73 planning application to amend the plans has been submitted to NYCC [North Yorkshire County Council] and is expected to be considered in Summer 2019" [Source]. Environmental Permit issued in October 2019 (EPR/FP3437QL/A001). A proposal to vary the planning consent (NY/2019/0005/73) was registered in January 2019 and granted in February 2020. Permit varied in November 2023 following a BAT review (EPR/FP3437QL/V002). (Entry updated 2024-08-14)

Waste management for England 2024: Pre-operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: FP3437QL

Operator NameSite NameSite AddressFormer Planning RegionFormer Planning Sub-RegionTypePermitted Capacity (tonnes)
Southmoor Energy Centre LimitedSouthmoor Energy CentreKellingley Regeneration Scheme,Turvers Lane,,Knottingley WF11 8DTYorkshire & the HumberWest YorkshireMunicipal and/or Industrial & Commercial350,000

Permit files:

241-Permit-2019.pdf

Permit Decision files:

241-PermitDecision-2019.pdf

Permit Variation files:

241-PermitVariation-2023.pdf
241-PermitVariation-2023a.pdf

Permit Variation Decision files:

241-PermitVariationDecision-2023.pdf

Planning Variation files:

241-PlanningVariation-2020.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.