Information for Land At Great Coates Business Park, Humber Gate, Stallingborough, Grimsby

Status: Potential
Planning Region: Yorkshire and the Humber
Planning Sub-Region: North East Lincolnshire
Operator: Unstated prospective applicant
Capacity: 25,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: High-temperature incinerator for specialist waste. Scoping report submitted to North East Lincolnshire Council in April 2024 states: "The thermal treatment plant would manage a diverse range of wastes from commercial and industrial processes, manufacturing, maintenance activities, education, research and development, provision of healthcare services, law enforcement, and agricultural activities, which require high temperature destruction and disposal" (DM/0423/24/SCO). According to the Scoping Report, the plant would be classified as a waste incinerator for regulatory purposes. The local newspaper notes that the applicant is unstated. [Source]. The metadata for the scoping report mentions 'GRG', which could be a reference to GRG Waste UK, but this has not been confirmed. (Entry updated 2024-07-01)

Scoping Decision files:

323-ScopingDecision-2024.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.