Information for Clean Planet Energy Eco Plant, Plastics-to-fuel plant / SWIP for syngas generated in the production of Purified Pyrolysis Oil, Plot 2, Sleaford Moor Enterprise Park, Sleaford

Status: Potential
Planning Region: East Midlands
Planning Sub-Region: Lincolnshire
Operator: Clean Planet Energy
Capacity: 25,000 (Plastic)
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Planning application submitted in November 2025 for a "waste pyrolysis plant building (plastics to fuel facility)" (PL/0094/25). The Planning Statement states that "the end products are hydrocarbon oil, gas and residue" and that the "Purified Pyrolysis Oil" would be sold to the petrochemical industry. The Planning Statement also notes that the pant would require a Small Waste Incineration Plant (SWIP) permit. According to the process description in the Air Quality Impact Assessment: "The pyrolysis process thermally treats the plastic in the absence of oxygen to produce a gas that is condensed to produce a base oil. The non-condensable gases that are produced in the process form a synthesis gas (or syngas) that comprises a mixture of gaseous species (e.g. methane, ethane, butane, ethane, etc). This is combusted on site to provide the heat for the pyrolysis process. Emissions from this process are treated in a thermal oxidiser with the exhaust gas from the treatment being subject to the emission limits referenced in the IED. The vaporised base oil from the fired heater is thermally treated using steam to create product oils. Emissions from this process are treated in the thermal oxidiser and are subject to the emission limits referenced in the IED. Emissions to air from the main operation is discharged via a single core stack. An emergency flare system is maintained to treat non-condensable gases when the thermal oxidiser is not available. The flare system is used while the thermal oxidiser is reinstated or while the process shuts down". (Entry updated 2025-12-09)

Environment Agency Compliance Assessment Reports

View the full UKWIN incinerator compliance index

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.