Incinerator information library

Information for Skelton Grange, Leeds

Status: Potential
Planning Region: Yorkshire & the Humber
Planning Sub-Region: West Yorkshire
Operator: Multifuel Energy Ltd (a 50:50 joint venture between Wheelabrator and SSE)
Capacity: 410,000
Campaign Group(s): FoE Leeds / NIL: No Incinerator, Leeds
Notes: Planning permission granted to Biffa in February 2013 for a 300,000tpa conventional incinerator for C&I and possibly MSW [Source, Source, Source]. In May 2019 it was reported that Wheelabrator had secured the right to buy the site from the Harworth Group and that the intention was to increase capacity to 410,000tpa [Source, Source]. Planning reference for Biffa's 300ktpa plant is 11/03705 [See planning application]. Consultation on Environmental Permit application commenced in October 2019 [EPR/UP3904PA/A001]. In April 2020 it was reported that construction is due to commence in 2021 [Source]. A permit was granted in December 2020t [EPR/UP3904PA/A001]. (Entry updated 2020-12-10)

Permit files:

249-Permit-2020.pdf

Permit Decision files:

249-PermitDecision-2020.pdf

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.