Menu Close

Incinerator information library

Information for Skelton Grange, Leeds

Status: Existing
Planning Region: Yorkshire and the Humber
Planning Sub-Region: West Yorkshire
Operator: enfinium (formerly Multifuel Energy Ltd) (owned by First Sentier Investors)
Capacity: 435,000
Campaign Group(s): FoE Leeds / NIL: No Incinerator, Leeds
Notes: Planning permission granted to Biffa in February 2013 for a 300,000tpa conventional incinerator for C&I and possibly MSW [Source, Source, Source]. In May 2019 it was reported that Wheelabrator had secured the right to buy the site from the Harworth Group and that the intention was to increase capacity to 410,000tpa [Source, Source]. Planning reference for Biffa's 300ktpa plant is 11/03705 [See planning application]. Consultation on Environmental Permit application commenced in October 2019 [EPR/UP3904PA/A001]. In April 2020 it was reported that construction is due to commence in 2021 [Source]. A permit was granted in December 2020 [EPR/UP3904PA/A001]. In December 2020 Wheelabrator announced the sale of their UK EfW division to the European Diversified Infrastructure Fund III, an infrastructure fund managed by First Sentier Investors (FSI) [Source]. It was reported in July 2021 that full commissioning of the plant is planned for 2025 and that it will be built by HZI [Source]. In August 2022 it was reported that the facility was under construction "currently due to be fully commissioned in 2025" [Source]. In March 2025 it was reported that the Leeds plant had received its first waste delivery (as part of commissioning) and was due to be fully operational later in 2025 and that the scheme is associated with the Aire Valley Heat and Power Network which had "received £19.5 million in funding from the UK government's Green Heat Network Fund" [Source]. In June 2025 it was announced that Enfinium had signed a 3-year Power Purchase Agreement (from 2025 to 2028) to be serviced by the incinerator [Source]. In the 2025 Annual Performance Report it was stated that the plant had combusted 101,734 tpa of waste in Q4 2025 and that: "During March 2025 the facility entered the hot commissioning... However, delayed takeover of the facility from the EPC contractor Kanadevia Inova (KVI, formerly Hitachi Zosen Inova (HZI)) to Enfinium has meant that KVI has been the primary operator of the facility during 2025 and into 2026 until the takeover is formalised." (Entry updated 2026-04-20)

Waste management for England 2024: Pre-operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: UP3904PA

Operator NameSite NameSite AddressFormer Planning RegionFormer Planning Sub-RegionTypePermitted Capacity (tonnes)
ENFINIUM SKELTON GRANGE LIMITEDSkelton Grange Energy from Waste FacilitySkelton Grange,,Skelton Grange Road ,,Leeds,,West Yorkshire LS10 1RRYorkshire & the HumberWest YorkshireMunicipal and/or Industrial & Commercial435,000

Environment Agency 2025 Pollution Inventory: Substances

Uses data from the Pollution Inventory 2025 snapshot from April 2025 released by the Environment Agency under the Open Government License. The data may change in the final version.

Permit: UP3904PA

SITE ADDRESS: Skelton Grange Energy from Waste Facility Skelton Grange Road West Yorkshire

ROUTE NAME: Air

SUBSTANCE NAMEQUANTITY RELEASED (kg)METHODNAMEMETHODTEXTMETHODDESCRIPTION
Carbon dioxide300,000,000MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Carbon Dioxide From Qualifying Renewable Fuel Sources158,000,000CalculatedOther calculation method
Nitrogen oxides (NO and NO2) as NO2213,000MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Chlorine and inorganic chlorine compounds - as HCl11,100MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Mercury1.68MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Arsenic1.33MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Cadmium1.24MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Dioxins and furans (PCDDs/PCDFs) - as ITEQ0MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Dioxins and furans (PCDDs/PCDFs) - as WHO TEQ0MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility

APR Summary 2025

Details taken or derived from the Annual Performance Report submitted by the operator

Permit: UP3904PA

EntryValueNotes
Plant Size TPA435,000.00Skelton Grange Energy from Waste Facility
Power Generated Year Total73,726.00
Power Generated kWh per tonne256.04
Power Exported Year Total68,290.00
Power Exported kWh per tonne237.16
Power Imported Year Total15,481.00
Power Imported kWh per tonne53.76
Parasitic Load Year Total0.23
Thermal Energy Exported Year Total0.00
Total Waste Received Year Total303,277.24
Total Waste Combusted Year Total287,943.00Refuse Derived Fuel * - H'hold/LA (100.00%)
NCV Year Total10.25
Permit Breaches Year Total66.00
Annual CO2 Mass299,693.47CEMS
Annual CO2 Mass Per Tonne1.04
Annual CO2 Mass Per Mwh4.39
Annual N2O Mass1.75CEMS
Total CO2 N2O300,157.22
Biogenic CO2 Percentage0.53calculated from data obtained from spot samples taken from bunker and analysed by third party
Biogenic Percentage NCV0.60calculated from data obtained from spot samples taken from bunker and analysed by third party
Biogenic Percentage Mass0.53calculated from data obtained from spot samples taken from bunker and analysed by third party

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php/Skelton_Grange_EfW_Plant

Annual Performance Report files:

249-AnnualPerformanceReport-2025.xlsm

Permit files:

249-Permit-2020.pdf

Permit Decision files:

249-PermitDecision-2020.pdf

Permit Variation files:

249-PermitVariation-2025.pdf

Permit Variation File Note files:

249-PermitVariationFileNote-2025.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.