Menu Close

Incinerator information library

Information for Battlefield Enterprise Park, Shrewsbury

Status: Existing
Planning Region: West Midlands
Planning Sub-Region: Shropshire
Operator: Veolia
Capacity: 102,000
Campaign Group(s): Safe Waste Shropshire
Notes: Planning permission granted by the Secretary of State on the 10th of January 2012. The Environment Agency issued an environmental permit in June 2010. (Entry updated 2026-04-20)

R1 status of incinerators - 8 April 2026 (Environment Agency)

Uses data from R1 status of incinerators in England released by the Environment Agency. © Environment Agency copyright and/or database right 2026. All rights reserved.

Permit: XP3239GF

OperatorInstallation nameInstallation addressPermit statusWaste input (000s tonnes per annum)Incinerator typeCalculated R1 valueApplication R1 status grantedSource of data used in R1 calculationsDate R1 application status granted
Veolia ES Shropshire LtdBattlefield Energy from Waste FacilityBattlefield EWF, Vanguard Way, Shrewsbury, Shropshire, SY1 3TG,Permit issued102Municipal waste0.7YesDesign11/10/2011

Waste management for England 2024: Operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: XP3239GF

Date First PermittedOperator NameSite NameSite AddressTypePermitted Capacity (tonnage)Tonnage Incinerated in 2015Tonnage Incinerated in 2016Tonnage Incinerated in 2017Tonnage Incinerated in 2018Tonnage Incinerated in 2019Tonnage Incinerated in 2020Tonnage Incinerated in 2021Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024
21/10/2010Veolia ES Shropshire LimitedBattlefield Energy from Waste FacilityBattlefield EWF,Vanguard Way,SHREWSBURY,Shropshire SY1 3TGMunicipal and/or Industrial & Commercial102,00078,75094,42196,83196,48298,51599,25499,13993,89197,73698,47893,89197,73698,478

Waste management for England 2023 & 2024: Waste received

2023: Uses data from 2023 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright
2024: Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: XP3239GF

Form: Solid

Fate: Incineration

R and D code: R01

SOC Category: 10 - Mixed ordinary wastes

EWC Waste DescWaste CodeRecorded OriginOrigin WPAOrigin RegionSOC Sub CategoryTonnes Received (2023)Tonnes Received (2024)
mixed municipal waste20 03 01ShropshireShropshireWest MidlandsHousehold and similar wastes58,27760,584
(+4%)
mixed municipal waste20 03 01Telford and WrekinTelford and WrekinWest MidlandsHousehold and similar wastes22,577
bulky waste20 03 07ShropshireShropshireWest MidlandsHousehold and similar wastes11,75912,713
(+8%)
mixed municipal waste20 03 01Not CodeableNot CodeableNot CodeableHousehold and similar wastes3,841
other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 1119 12 12WolverhamptonWolverhamptonWest MidlandsSorting residues1441,432
(+894%)
mixed municipal waste20 03 01WirralWirralNorth WestHousehold and similar wastes1,379
mixed municipal waste20 03 01BirminghamBirmingham CityWest MidlandsHousehold and similar wastes8341,004
(+20%)
bulky waste20 03 07Telford and WrekinTelford and WrekinWest MidlandsHousehold and similar wastes7319
(+4,457%)
mixed municipal waste20 03 01Stoke-on-TrentStoke-on-Trent CityWest MidlandsHousehold and similar wastes944167
(-82%)
mixed municipal waste20 03 01DerbyshireDerbyshireEast MidlandsHousehold and similar wastes65
mixed municipal waste20 03 01Hinckley and BosworthLeicestershireEast MidlandsHousehold and similar wastes4258
(+38%)
mixed municipal waste20 03 01DerbyCity of DerbyEast MidlandsHousehold and similar wastes18542
(-77%)
other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 1119 12 12Not CodeableNot CodeableNot CodeableSorting residues23
mixed municipal waste20 3 01Telford and WrekinTelford and WrekinWest MidlandsHousehold and similar wastes21,600
mixed municipal waste20 3 01WirralWirralNorth WestHousehold and similar wastes3,515
combustible waste (refuse derived fuel)19 12 10Telford and WrekinTelford and WrekinWest MidlandsSorting residues239
other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 1119 12 12Telford and WrekinTelford and WrekinWest MidlandsSorting residues190

Waste management for England 2023 & 2024: Waste removed

2023: Uses data from 2023 Waste Data Interrogator - Version 1 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright
2024: Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: XP3239GF

EWC Sub ChapterEWC Waste DescWaste CodeRecorded DestinationDestination WPADestination RegionFateR and D codeSOC CategorySOC Sub CategoryTonnes Removed (2023)Tonnes Removed (2024)
Incineration or pyrolysis of wastebottom ash and slag other than those mentioned in 19 01 1119 01 12RugbyWarwickshireWest MidlandsRecoveryR0512 - Mineral wastesCombustion wastes10,522.8618,229.08
(+73%)
Incineration or pyrolysis of wasteferrous materials removed from bottom ash19 01 02LiverpoolLiverpoolNorth WestRecoveryR0406 - Metallic wastesFerrous metal waste and scrap2,405.662,548.86
(+6%)
Incineration or pyrolysis of wastesolid wastes from gas treatment19 01 07*WalsallWalsallWest MidlandsTreatmentD0912 - Mineral wastesCombustion wastes2,057.942,040.86
(-0.8%)
Incineration or pyrolysis of wastesolid wastes from gas treatment19 01 07*Cheshire EastCheshire EastNorth WestLong term storageD1212 - Mineral wastesCombustion wastes47.54148.66
(+213%)
Incineration or pyrolysis of wasteaqueous liquid wastes from gas treatment and other aqueous liquid wastes19 01 06*WalsallWalsallWest MidlandsTreatmentD0912 - Mineral wastesCombustion wastes26.7834.50
(+29%)
Incineration or pyrolysis of wastesolid wastes from gas treatment19 01 07*DerbyCity of DerbyEast MidlandsTreatmentD0912 - Mineral wastesCombustion wastes23.24
Incineration or pyrolysis of wastebottom ash and slag other than those mentioned in 19 01 1119 01 12BirminghamBirmingham CityWest MidlandsRecoveryR0512 - Mineral wastesCombustion wastes6,900.98
Concrete - bricks - tiles and ceramicsmixtures of concrete, bricks, tiles and ceramics other than those mentioned in 17 01 0617 01 07ShropshireShropshireWest MidlandsRecoveryR0512 - Mineral wastesConstruction and demolition wastes52.98

Environment Agency 2024 & 2025 Pollution Inventory: Substances

2024: Uses data from the Pollution Inventory 2024 released by the Environment Agency under the Open Government License.
2025: Uses data from the Pollution Inventory 2025 snapshot from April 2025 released by the Environment Agency under the Open Government License. The data may change in the final version.

Permit: XP3239GF

SITE ADDRESS: Battlefield Integrated Waste Management Facility Vanguard Way

ROUTE NAME: Air

SUBSTANCE NAMEQUANTITY RELEASED (kg) (2024)QUANTITY RELEASED (kg) (2025)METHODNAMEMETHODTEXTMETHODDESCRIPTION
Carbon dioxide112,234,000107,047,000
(-5%)
MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Carbon Dioxide From Qualifying Renewable Fuel Sources51,012,00059,411,000
(+16%)
Estimated
Nitrogen oxides (NO and NO2) as NO2130,136132,498
(+2%)
MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Ammonia4,6513,302
(-29%)
MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Polychlorinated biphenyls (PCBs) - as WHO TEQ0MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Chromium10.70MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility
Arsenic1.20MeasuredMeasurement method prescribed by us in an operating permit or licence for the facility

GHG Performance in 2022

Uses data from operators collated for openDemocracy article "Some ‘renewable’ UK incinerators are more polluting than coal stations"

Permit: XP3239GF

Total waste combusted (Total)Electricity generated (MWh)Electricity imported (MWh)Electricity Exported (MWh)Annual mass of carbon dioxide released (t)CO2 SourceAnnual mass emissions of nitrous oxide (tonnes)N2O sourceBiogenic percentageBiogenic sourceTotal kg CO2e (including biogenic) per tonne combustedFossil kg CO2 per tonne combustedKg of fossil carbon equiv per MWh
93,89166,67335357,45597,514CEM data3.5CEM data51.80%2017 WRAP Data1,050501836

GHG Performance in 2023

Uses data from Pollution Inventory 2023 extract and Annual Peformance Reports submitted by operators and released by the Environment Agency under the Open Government License

Permit: XP3239GF

Permitted capacity (ktpa)Total waste combustedCO2 (kg)CO2 per tonne (kg)CO2 Source
10291,746113,197,0001,234Pollution Inventory

APR Summary 2024 & 2025

Details taken or derived from the Annual Performance Report submitted by the operator

Permit: XP3239GF

EntryValue (2024)Value (2025)Notes (2024)Notes (2025)
Plant Size TPA102,000102,000
Plant Size MWe88
Power Generated Year Total69,736.0068,108.60
(-2%)
Power Generated kWh per tonne708.14684.54
(-3%)
Power Exported Year Total59,949.0058,681.00
(-2%)
Power Exported kWh per tonne608.76589.78
(-3%)
Power Imported Year Total194.20155.60
(-20%)
Power Imported kWh per tonne1.971.56
(-21%)
Parasitic Load Year Total0.140.14
Thermal Energy Exported Year Total0.000.00
Total Waste Received Year Total104,204.00102,204.45
(-2%)
Total Waste Combusted Year Total98,478.0099,495.60
(+1%)
Household / Local Authority (98.60%)Household / Local Authority (97.72%)
Permit Breaches Year Total0.000.00
Annual CO2 Mass112,234.00107,046.70
(-5%)
Annual CO2 Mass Per Tonne1.141.08
(-5%)
Annual CO2 Mass Per Mwh187.00%1.82
Annual N2O Mass6.003.60
(-40%)
Total CO2 N2O108,000.70
Biogenic CO2 Percentage0.55
Biogenic Percentage Mass0.522017 WRAP data

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php/Battlefield_EfW

Annual Performance Report files:

204-AnnualPerformanceReport-2018.pdf
204-AnnualPerformanceReport-2019.pdf
204-AnnualPerformanceReport-2020.xlsm
204-AnnualPerformanceReport-2021.xlsm
204-AnnualPerformanceReport-2022.xlsm
204-AnnualPerformanceReport-2023.xlsm
204-AnnualPerformanceReport-2024.xlsm
204-AnnualPerformanceReport-2025.xlsm

Permit Variation files:

204-PermitVariation-2022.pdf

Permit Variation Decision files:

204-PermitVariationDecision-2022.pdf

Planning Consent files:

204-PlanningConsent-2012.pdf

Environment Agency Compliance Assessment Reports

View compliance documents for this incinerator
View the full UKWIN incinerator compliance index

Historic permit-related documents

See historic documents relating to permit XP3239GF

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.