Incinerator information library

Information for Bar Road, Coventry

Status: Existing
Planning Region: West Midlands
Planning Sub-Region: West Midlands Met Districts
Operator: The Coventry & Solihull Waste Disposal Company Ltd
Capacity: 315,000
Campaign Group(s): Coalition for Recycling and Against Coventry Incinerator (CRACIN)
Notes: Nearish the end of its operational life. It is expected that the facility will be refurbished rather than decommissioned because the plant is connected to a district heating scheme [Source]. The Council(s) purchased Tom White Waste's assets in January 2025 which included the incinerator and agreed a 25-year agreement to lease them back to Tom White Waste [Source]. In January 2025 it was reported that: "Coventry and Solihull Waste Disposal Company (CSWDC) has revealed its Coventry-based facility is unable to meet key emission limits under the recently updated Waste Incineration BREF (WI BREF). The issues for the facility, which is ultimately owned by CSWDC’s shareholders Coventry City Council, Solihull Metropolitan Borough Council and Warwickshire County Council, were revealed in an environmental permit application" [Source]. (Entry updated 2025-07-31)

Waste management for England 2024: Operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: NP3739PD

Date First PermittedOperator NameSite NameSite AddressTypePermitted Capacity (tonnage)Tonnage Incinerated in 2006Tonnage Incinerated in 2007Tonnage Incinerated in 2008Tonnage Incinerated in 2009Tonnage Incinerated in 2010Tonnage Incinerated in 2011Tonnage Incinerated in 2012Tonnage Incinerated in 2013Tonnage Incinerated in 2014Tonnage Incinerated in 2015Tonnage Incinerated in 2016Tonnage Incinerated in 2017Tonnage Incinerated in 2018Tonnage Incinerated in 2019Tonnage Incinerated in 2020Tonnage Incinerated in 2021Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024
20/12/2005The Coventry & Solihull Waste Disposal Company LimitedCoventry IncineratorCSWDC Limited,Bar Road,COVENTRY,West Midlands CV3 4ANMunicipal and/or Industrial & Commercial315,000210,200232,800241,733245,187240,246230,563229,995244,633264,830273,728282,849292,989288,537298,854313,268295,135297,821291,805291,464297,821291,805291,464

Waste management for England 2023 & 2024: Waste received

2023: Uses data from 2023 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright
2024: Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: NP3739PD

Form: Solid

Recorded Origin: West Midlands

Origin WPA: West Midlands (WPA Not codeable)

Origin Region: West Midlands

Fate: Incineration

R and D code: D10

EWC Waste DescWaste CodeSOC CategorySOC Sub CategoryTonnes Received (2023)Tonnes Received (2024)
mixed municipal waste20 03 0110 - Mixed ordinary wastesHousehold and similar wastes288,395290,855
(+0.9%)
absorbents, filter materials (including oil filters not otherwise specified), wiping cloths, protective clothing contaminated by dangerous substances15 02 02*07 - Non-metallic wastesTextile wastes495299
(-40%)
bulky waste20 03 0710 - Mixed ordinary wastesHousehold and similar wastes9
paper and cardboard20 01 0107 - Non-metallic wastesPaper and cardboard wastes2
other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 1119 12 1210 - Mixed ordinary wastesSorting residues2,914

Waste management for England 2023 & 2024: Waste removed

2023: Uses data from 2023 Waste Data Interrogator - Version 1 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright
2024: Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: NP3739PD

EWC Sub Chapter: Incineration or pyrolysis of waste

EWC Waste DescWaste CodeRecorded DestinationDestination WPADestination RegionFateR and D codeSOC CategorySOC Sub CategoryTonnes Removed (2023)Tonnes Removed (2024)
bottom ash and slag other than those mentioned in 19 01 1119 01 12DerbyshireDerbyshireEast MidlandsRecoveryR0512 - Mineral wastesCombustion wastes44,622.6844,211.93
(-0.9%)
solid wastes from gas treatment19 01 07*PeterboroughPeterboroughEast of EnglandLandfillD0512 - Mineral wastesCombustion wastes12,310.9112,268.64
(-0.3%)
ferrous materials removed from bottom ash19 01 02DerbyshireDerbyshireEast MidlandsRecoveryR0406 - Metallic wastesFerrous metal waste and scrap5,695.634,987.43
(-12%)

Environment Agency 2024 Pollution Inventory: Substances

Uses data from the Pollution Inventory 2024 released by the Environment Agency under the Open Government License.

Permit: NP3739PD

SITE ADDRESS: Coventry Incinerator Bar Road

ROUTE NAME: Air

METHODNAME: Calculated

METHODTEXT: Extractive sampling

METHODDESCRIPTION: Calculation method prescribed by us in an operating permit or licence for the facility

SUBSTANCE NAMEQUANTITY RELEASED (kg)
Carbon dioxide273,887,000
Carbon Dioxide From Qualifying Renewable Fuel Sources164,332,000
Nitrogen oxides (NO and NO2) as NO2278,000
Ammonia15,500
Particulate matter - PM101,120
Particulate matter - PM2.51,120
Cadmium2.30

Environment Agency 2025 Pollution Inventory: Substances

Uses data from the Pollution Inventory 2025 snapshot from April 2025 released by the Environment Agency under the Open Government License. The data may change in the final version.

Permit: NP3739PD

SITE ADDRESS: The CSWDC Waste to Energy Plant Bar Road Coventry

ROUTE NAME: Air

METHODNAME: Calculated

METHODDESCRIPTION: Calculation method prescribed by us in an operating permit or licence for the facility

SUBSTANCE NAMEQUANTITY RELEASED (kg)METHODTEXT
Carbon dioxide283,342
Ammonia9,100
Particulate matter - PM2.51,134
Particulate matter - PM101,134
Cadmium3.5
Mercury1.69

GHG Performance in 2023

Uses data from Pollution Inventory 2023 extract and Annual Peformance Reports submitted by operators and released by the Environment Agency under the Open Government License

Permit: NP3739PD

Permitted capacity (ktpa)Total waste combustedCO2 (kg)CO2 per tonne (kg)CO2 Source
315291,805288,669,000989Pollution Inventory

APR Summary 2024 & 2025

Details taken or derived from the Annual Performance Report submitted by the operator

Permit: NP3739PD

EntryValue (2024)Value (2025)Notes (2024)Notes (2025)
Plant Size TPA315,000315,000The Coventry and Solihull Waste Disposal Company Limited
Plant Size MWth7777
Plant Size MWe1,800.00%17.70
Power Generated Year Total38,055.4697,341.37
(+156%)
Power Generated kWh per tonne13,057.00%335.28
Power Exported Year Total1,817,700.00%55,716.00
Power Exported kWh per tonne62.36191.90
(+208%)
Power Imported Year Total100.001,822.00
(+1,722%)
Power Imported kWh per tonne0.346.28
(+1,747%)
Parasitic Load Year Total0.520.44
(-15%)
Thermal Energy Exported Year Total15,594.0012,324.00
(-21%)
Total Waste Received Year Total291,464.11290,332.48
(-0.4%)
Total Waste Combusted Year Total291,464.00290,332.48
(-0.4%)
Household / Local Authority (99.90%)Household / Local Authority (100.00%)
Permit Breaches Year Total0.000.00
Annual CO2 Mass273,887.00270,629.30
(-1%)
CEMs data used to record CO2 and flow with running hours to produce a mass value for the year. Please note that G1 the main turbine was off for the whole of 2024 awaiting parts and refurb following a major failure in May-23. Annual mass of carbon dioxide is then higher in 2024 at 15.07 however it was only 5.33 in 2023 . This is due to only have G2 available. To note we are still supplying majority of in house electricity to ourselves BRING energy and Sherbourne next door and supplying district heating to Coventry City Centre. When G1 returns to service this figure will normalise.CEMs data used to record CO2 and flow with running hours to produce a mass value for the year
Annual CO2 Mass Per Tonne0.940.93
(-1%)
Annual CO2 Mass Per Mwh4.86
Annual N2O Mass7.206.10
(-15%)
Total CO2 N2O272,245.80
Biogenic CO2 Percentage0.600.59
(-2%)
Biogenic Percentage NCV0.550.54
(-2%)
Biogenic Percentage Mass0.600.59
(-2%)

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php/Coventry_EfW_Plant

Annual Performance Report files:

211-AnnualPerformanceReport-2018.pdf
211-AnnualPerformanceReport-2019.pdf
211-AnnualPerformanceReport-2020.xlsm
211-AnnualPerformanceReport-2021.xlsm
211-AnnualPerformanceReport-2022.xlsm
211-AnnualPerformanceReport-2023.xlsm
211-AnnualPerformanceReport-2024.xlsm
211-AnnualPerformanceReport-2025.xlsm

Permit Variation files:

211-PermitVariation-2022.pdf
211-PermitVariation-Decision-2022.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.