Information for Land off Houghton Main Colliery Roundabout, Park Spring Road, Little Houghton

Status: Potential
Planning Region: Yorkshire and the Humber
Planning Sub-Region: Barnsley
Operator: Grid Powr (UK) Ltd
Capacity: 145,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: In September 2023 a permit application was advertised to treat 145ktpa of RDF through gasification (EPR/BP3325SA/A001). Barnsley Metropolitan Borough Council refused planning permission for the initial iteration of the scheme in November 2014 (2014/0559) but an amended scheme was approved in February 2015 for a gasiifcation plant to treat "up to 150,000 tonnes per annum of waste wood and virgin timber through a gasification process" (2015/0137). The scheme was the ammended in 2018 to increase the capacity to 260,000 tonnes per annum and to switch the feedstock to RDF and waste wood (2018/1437). In 2019 a planning conditions were discharged and varied in 2019 (2019/0573 and 2019/0941), including a variation to allow alterations to the design, scale and layout. Permit EPR/BP3325SA issued in August 2024. The Applicant stated in their Planning Statement for application 2019/0941 (for the Variation of Condition 1 of application 2018/1437) to allow alterations to the design, scale and layout of the Renewable Energy Park that: "Commencement of development was implemented on 26 June 18". (Entry updated 2025-03-05)

Waste management for England 2024: Pre-operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: BP3325SA

Operator NameSite NameSite AddressFormer Planning RegionFormer Planning Sub-RegionTypePermitted Capacity (tonnes)
Grid Powr (UK) LtdHoughton Main EfWPark Spring Road, Barnsley, S72 7GXYorkshire & the HumberSouth YorkshireMunicipal and/or Industrial & Commercial145,000

Permit files:

313-Permit-2024.pdf

Permit Decision files:

313-PermitDecision-2024.pdf

Planning Consent files:

313-PlanningConsent-2015.pdf

Planning Refusal files:

313-PlanningRefusal-2014.pdf

Planning Variation files:

313-PlanningVariation-2018.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.