Incinerator information library

Information for Deeside Refuse Derived Fuel Project gasification plant, Site of the former Gaz De France power station, land off Weighbridge Road, Deeside Industrial Estate, Flintshire

Status: Potential
Planning Region: Wales
Planning Sub-Region: North Wales
Operator: EQTEC and the Rotunda Group
Capacity: 80,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: It was announced in July 2020 that EQTEC and the Rotunda Group would seek permission for an "advanced gasification technology" plant to use waste from the nearby RDF plant which currently has a capacity for 182,000tpa as part of a deal with Logik Developments Limited [Source, Source]. Following the Welsh Government's moratorium on incinerators of 10MWe and over, the proposal was revised to be a gasification plant with a reduced capaicty of 9.9MWe and a reduced throughput of 80,000tpa and this was approved by Flintshire Council in October 2021 with a time limit which would only allow the facility to operate until 2050 [Source, Source]. In February 2023 it was reported that Eqtec "has been unable to offload its incomplete Deeside...gasification technology facility...." [Source, Source]. (Entry updated 2023-08-29)

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.