Menu Close

Incinerator information library

Information for Thornton Energy Recovery Centre (TERC), Hillhouse Business Park, Thornton-Cleveleys

Status: Potential
Planning Region: North West
Planning Sub-Region: Lancashire
Operator: Sesona Ltd
Capacity: 120,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Planning permission formally approved in July 2026 (LCC/2023/0003). The planning application was submitted January 2023 (LCC/2023/0003), with further ecological and noise information published in July 2023. According to the application: "The TERC would generate electricity by way of an Organic Rankine Cycle (ORC) which would be driven through the combustion of up to 120,000 tonnes per annum (tpa) of residual waste / RDF". Environmental permit application launched by the Environment Agency in July 2023, with the permit issued in March 2024 (EPR/ZP3329SS/A001). (Entry updated 2026-08-18)

Waste management for England 2024: Pre-operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: ZP3329SS

Operator NameSite NameSite AddressFormer Planning RegionFormer Planning Sub-RegionTypePermitted Capacity (tonnes)
Sesona Hill House LtdThornton Energy Recovery CentreHillhouse Business Park, Thornton-Cleveleys, FY5 4QDNorth WestLancashireCo-Incineration of non hazardous waste120,000

Objection files:

306-Objection-from-UKWIN-January-2026.pdf

Permit files:

306-Permit-2024.pdf

Permit Decision files:

306-PermitDecision-2024.pdf

Planning Consent files:

306-PlanningConsent-2026.pdf

Environment Agency Compliance Assessment Reports

View compliance documents for this incinerator
View the full UKWIN incinerator compliance index

Historic permit-related documents

See historic documents relating to permit ZP3329SS

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.