Information for Enviropower Energy from Waste / "Lancing Combustion Plant", Unit 2, Chartwell Road, Churchill Industrial Estate, Lancing

Status: Existing
Planning Region: South East
Planning Sub-Region: West Sussex
Operator: Rabbit Waste Management (formed of a merger between Sussex Waste Recycling and Enviropower) and potentially Biomass Power Ltd
Capacity: 75,000
Campaign Group(s): ?
Notes: Primarily used for Construction & Demolition waste from the Waste Transfer Station operated by Rabbit Waste Management Ltd, but could also take trade waste and skip waste collected by Rabbit. In June 2017 it was reported that a fire burnt "over 500 tonnes of wood chippings being stored ahead of incineration" [Source]. Permit number XP3030XX. (Entry updated 2019-06-06)

Waste management for England 2024: Operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: XP3030XX

Date First PermittedOperator NameSite NameSite AddressTypePermitted Capacity (tonnage)Tonnage Incinerated in 2011Tonnage Incinerated in 2012Tonnage Incinerated in 2013Tonnage Incinerated in 2014Tonnage Incinerated in 2015Tonnage Incinerated in 2016Tonnage Incinerated in 2017Tonnage Incinerated in 2018Tonnage Incinerated in 2019Tonnage Incinerated in 2020Tonnage Incinerated in 2021Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024Tonnage Incinerated in 2022Tonnage Incinerated in 2023Tonnage Incinerated in 2024
10/12/2007Enviropower LimitedUnit 7 Marlborough Business CentreUnit 2,Chartwell Road,Churchill Industrial Estate,Lancing,West Sussex BN15 8TUMunicipal and/or Industrial & Commercial60,35061,48060,31160,26857,27660,01159,00533,28059,62955,02164,05666,88052,90564,15866,06552,90564,15866,065

Waste management for England 2023 & 2024: Waste received

2023: Uses data from 2023 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright
2024: Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: XP3030XX

Form: Solid

Recorded Origin: Adur

Origin WPA: West Sussex

Origin Region: South East

Fate: Incineration

R and D code: R01.03

EWC Waste DescWaste CodeSOC CategorySOC Sub CategoryTonnes Received (2023)Tonnes Received (2024)
wood other than that mentioned in 19 12 0619 12 0707 - Non-metallic wastesWood wastes16,35165,847
(+303%)
other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 1119 12 1210 - Mixed ordinary wastesSorting residues5642,329
(+313%)
combustible waste (refuse derived fuel)19 12 1010 - Mixed ordinary wastesSorting residues46,973

Waste management for England 2023 & 2024: Waste removed

2023: Uses data from 2023 Waste Data Interrogator - Version 1 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright
2024: Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: XP3030XX

EWC Sub ChapterEWC Waste DescWaste CodeRecorded DestinationDestination WPADestination RegionFateR and D codeSOC CategorySOC Sub CategoryTonnes Removed (2023)Tonnes Removed (2024)
Incineration or pyrolysis of wastebottom ash and slag other than those mentioned in 19 01 1119 01 12AdurWest SussexSouth EastRecoveryR0512 - Mineral wastesCombustion wastes4,7786,577
(+38%)
Incineration or pyrolysis of wastesolid wastes from gas treatment19 01 07*PeterboroughPeterboroughEast of EnglandTreatmentD0912 - Mineral wastesCombustion wastes2,607.423,365.00
(+29%)
Metals (including their alloys)iron and steel17 04 05HorshamWest SussexSouth EastRecoveryR0406 - Metallic wastesFerrous metal waste and scrap38.00
Other municipal wastesmixed municipal waste20 03 01AdurWest SussexSouth EastRecoveryR0510 - Mixed ordinary wastesHousehold and similar wastes37.00
Separately collected fractions (except 15 01)metals20 01 40South EastSouth East (WPA Not codeable)South EastRecoveryR0406 - Metallic wastesMixed metal wastes22.551.00
(-96%)
Separately collected fractions (except 15 01)fluorescent tubes and other mercury-containing waste20 01 21*HaltonHaltonNorth WestRecoveryR1308 - Discarded equipmentDiscarded machines and equipment components0.020.00
(-100%)
Separately collected fractions (except 15 01)batteries and accumulators included in 16 06 01, 16 06 02 or 16 06 03 and unsorted batteries and accumulators containing these batteries20 01 33*KirkleesKirkleesYorks & HumberRecoveryR1308 - Discarded equipmentDiscarded machines and equipment components0.020.00
(-100%)
Incineration or pyrolysis of wastebottom ash and slag other than those mentioned in 19 01 1119 01 12AdurWest SussexSouth EastLandfillD0512 - Mineral wastesCombustion wastes1,470.00

Environment Agency 2024 Pollution Inventory: Substances

Uses data from the Pollution Inventory 2024 released by the Environment Agency under the Open Government License.

Permit: XP3030XX

SITE ADDRESSROUTE NAMESUBSTANCE NAMEQUANTITY RELEASED (kg)METHODNAMEMETHODTEXTMETHODDESCRIPTION
Lancing Combustion Plant Units 1-2 37 Chartwell Road Lancing Business Park West SussexAirNitrogen oxides (NO and NO2) as NO2134,350MeasuredOther measurement method

APR Summary 2025

Details taken or derived from the Annual Performance Report submitted by the operator

Permit: XP3030XX

EntryValueNotes
Plant Size TPA75,000.00Enviropower Ltd
Plant Size MWth20.00
Plant Size MWe5.00
Power Generated Year Total19,110.03
Power Generated kWh per tonne464.80
Power Exported Year Total14,390.30
Power Exported kWh per tonne350.01
Power Imported Year Total729.70
Power Imported kWh per tonne17.75
Parasitic Load Year Total0.27
Thermal Energy Exported Year Total0.00
Total Waste Received Year Total40,835.00
Total Waste Combusted Year Total41,114.50Waste wood (biomass) (94.82%)
NCV Year Total65.00
Permit Breaches Year Total1.00
Annual CO2 Mass38,729.86using Tolvik report 2022 method: 0.942 tCO2/t waste
Annual CO2 Mass Per Tonne0.94
Annual CO2 Mass Per Mwh2.69
Annual N2O Mass4.03using 2021 Pollution Inventory data method: 0.0981 kgN2O/t waste
Total CO2 N2O39,798.69

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php/Lancing_EfW

Annual Performance Report files:

140-AnnualPerformanceReport-2018.pdf
140-AnnualPerformanceReport-2019.pdf
140-AnnualPerformanceReport-2020.pdf
140-AnnualPerformanceReport-2021.pdf
140-AnnualPerformanceReport-2022.pdf
140-AnnualPerformanceReport-2024.xlsm
140-AnnualPerformanceReport-2025.xlsm

Permit Variation files:

140-PermitVariation-2023.pdf

Permit Variation Decision files:

140-PermitVariationDecision-2023.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.