UK Incinerators

Search:       Status: Existing   Potential  Prevented   

Capacity Site Operator / Developer Campaign groups Information
DERBY, EAST MIDLANDS
Potential 157,000Sinfin Integrated Waste Treatment Centre, Sinfin Lane, OsmastonMacquarie Asset Management (on behalf of Derby City and Derbyshire County Council)Derby FoE and Sinfin and Spondon Against INcineration (SSAIN) [Also see Simon’s blog]In August 2019 Derbyshire and Derby Councils decided to end the contract with RRS but did not yet formally abandon the project [Source]. Development of the gasification plant is effectively on hold until the Councils determine a 'fair value' for the project and better understand what would be needed to get the plant to operate so that they can determine whether or not they wish to purchase the plant. ENERGOS gasification incinerator granted planning permission on re-appeal in September 2012, with completion target delayed until October 2017 [Source, PINS case summary, Source, Source, Source]. Funding from the Green Investment Bank announced in August 2014 [Source]. Planning Application submitted May 2009. Permit WP3133KP issued in November 2010. It was reported in July 2018 that "Bad smells from the controversial Sinfin waste treatment plant are still plaguing residents almost a year after the stink first started" [Source]. In August 2024 it was reported that "The authorities [i.e. Derbyshire County Derby City Council] say they will now push ahead with plans to get the facility up and running" [Source]. The project remains mothballed, but the councils continues to pursue bidders to fix and operate the plant. In July 2025 Viridor withdrew from the bidding for the propject, with the two remaining bidders being Biffa and Thalia [Source]. In October 2025 it was reported that the project had " entered the competitive dialogue phase of the procurement process" which was expected to conclude in 2026 with a final decision on the contract expected in May 2026 [Source]. In May 2026 the Councils announced that "A procurement process to appoint a contractor to fix and operate Sinfin waste treatment centre is being brought to an end by Derby City Council and Derbyshire County Council and no contract will be awarded at this time" and that "The councils will carry out a rapid review of future options for the project and a report will be presented to their respective Cabinets later in the year to set out a recommended way forward. No decisions have been made at this stage regarding the long-term future of the waste treatment centre" [Source]. (Entry updated 2026-06-30)
CLICK HERE FOR MORE DETAILS
DERBYSHIRE, EAST MIDLANDS
Potential 230,000 (RDF)Swadlincote Energy Recovery Facility / "Swadlincote Resource Recovery Park", adjacent to Appleby Glade Industrial Estate (A444), SwadlincoteR&P Clean Power LtdSwadlincote Against Waste IncinerationPlanning permission CW9/1022/22 granted on appeal in August 2025 (PINS ref APP/U1050/W/24/3354670). A planning application was submitted to Derbyshire County Council in October 2022 [CW9/1022/22]. Pre-application consultation launched in June 2021 for an incinerator intended to treat "household and Commercial & Industrial waste". An updated revision of the planning application was submitted in July 2024. The initial consultation on permit application EPR/LP3327SK/A001 closed on 28 June 2024, and a second round of consultation closed in December 2024. A consultation on a draft permision was launched in September 2025 and is due to close 8 October 2025 [See consultation page]. In September 2024 the Derbyshire County Councillors on the Planning Committee voted to refuse planning permission primarily due to landscape impacts, including conflict with National Planning Policy for Waste Locational Criteria and South Derbyshire District Council local plan policies. In September 2024 the council refused planning permission due to "significant harm to the visual amenity and landscape character of the area". For documents relating to the appeal see the appeal section of the 'Associated documents' tab of the Derbyshire planning portal entry for CW9/1022/22. While the planning appeal was determined based on a 'design capacity' of 186,000 tpa this is not a planning condition and the requested permit would allow for up to 230,000 tpa of "mixed non-hazardous fuel" to be treated. Permit EPR/LP3327SK/A001 was issued in December 2025 with a capacity of 230,000 tpa. (Entry updated 2025-12-09)
CLICK HERE FOR MORE DETAILS
LINCOLNSHIRE, EAST MIDLANDS
Potential 25,000 (Plastic)Clean Planet Energy Eco Plant, Plastics-to-fuel plant / SWIP for syngas generated in the production of Purified Pyrolysis Oil, Plot 2, Sleaford Moor Enterprise Park, SleafordClean Planet EnergyContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning application submitted in November 2025 for a "waste pyrolysis plant building (plastics to fuel facility)" (PL/0094/25). The Planning Statement states that "the end products are hydrocarbon oil, gas and residue" and that the "Purified Pyrolysis Oil" would be sold to the petrochemical industry. The Planning Statement also notes that the pant would require a Small Waste Incineration Plant (SWIP) permit. According to the process description in the Air Quality Impact Assessment: "The pyrolysis process thermally treats the plastic in the absence of oxygen to produce a gas that is condensed to produce a base oil. The non-condensable gases that are produced in the process form a synthesis gas (or syngas) that comprises a mixture of gaseous species (e.g. methane, ethane, butane, ethane, etc). This is combusted on site to provide the heat for the pyrolysis process. Emissions from this process are treated in a thermal oxidiser with the exhaust gas from the treatment being subject to the emission limits referenced in the IED. The vaporised base oil from the fired heater is thermally treated using steam to create product oils. Emissions from this process are treated in the thermal oxidiser and are subject to the emission limits referenced in the IED. Emissions to air from the main operation is discharged via a single core stack. An emergency flare system is maintained to treat non-condensable gases when the thermal oxidiser is not available. The flare system is used while the thermal oxidiser is reinstated or while the process shuts down". (Entry updated 2025-12-09)
CLICK HERE FOR MORE DETAILS
NORTHAMPTONSHIRE, EAST MIDLANDS
Potential 154,000Resource Recovery Park, Brookfield Plantation, off Gretton Brook Road, CorbyESF Energy (previous scheme involved Gretton Brook Estates Ltd)Corby Against Waste Plants and Gretton Parish Council / Gretton and Weldon (Facebook)In April 2020 the applicant put in a planning application to vary the consent to allow a change of technology to bubbling fluid bed (BFB) combustion and to increase the total maximum throughput to 154,000 tonnes per annum and this was approved in August 2020 (20/00022/WASVOC and 20/00023/WASVOC). The permission was varied again in April 2022 to increase the stack height from 25m to 35m (NN/21/00059/WASVOC). Previous planning application put on hold indefinitely due to lack of environmental information in December 2014, with an expectation that the developer would apply with a new application taking account of the various changes to the proposal and their environmental impacts [Source]. Outline planning application (ref 13/00027/OUT) submitted January 2013 states that the Renewable Fuel Production and Recycling Facility (which already has planning consent) "will accept up to 120,000 tonnes per annum of the mixed domestic and commercial waste stream to produce approximately 50,000 tonnes per annum of biomass derived fuel", and that the fuel is "intended for use in a biomass powered energy generation facility, within the Resource Recovery Park". DRENL applied in December 2014 to allow waste from further afield at their RDF-production plant [Apps 14/00093&00094/WASVOC] [Source]. In May 2024 the Environment Agency did not include this facility in their list of plants that had a permit or outstanding permit application. (Entry updated 2024-05-13)
CLICK HERE FOR MORE DETAILS
Potential 357,408Energy Recovery Centre, Willowbrook East Industrial Estate, Shelton Road, CorbyEncyclisCamp Brookfield and Lee Barron MPPlanning application approved in October 2019 (19/00027/WASFUL) [Source]. Proposal announced in January 2019 for a combustion plant, which is presumably a conventional moving grate mass-burn incinerator. In January 2021 the planning permission was varied to to accommodate the facility as a single line plant, with a condition that the development must begin before 5th October 2022 (NCC Ref 20/00048/WASVOC). Not to be confused with the Clean Power Properties gasification proposal proposed within the same site footprint which had a lower stack and building height. Permit application to increase capacity to 360ktpa submitted in Setepmber 2023 [EPR/EP3629SF/A001]. In December 2023 Encyclis applied to the Environment Agency for a permit, stating a maximum capacity of 357,408 (EPR/EP3629SF/A001). In May 2024 it was reported that this facility was "thought to be close to making financial close" [Source]. It was reported in February 2025 that it was understood that "Encyclis is preparing to begin full construction" [Source]. Permit EPR/EP3629SF/A001 issued on 4th June 2024. As of July 2025 there is no mention of the Corby facility on the Encyclis website either as operational or under construction, whereas the Walsall plant which was listed alongside Corby as being in "in the final stages of development" in a Janaury 2023 press release is listed as being under construction [Source, Source]. North Northamptonshire Council stated in March 2026 that: "In regards to planning permission ref: 19/00027/WASFUL, as amended by 20/00048/WASVOC, the Waste Planning Authority was satisfied on 23 June 2022 that the development had lawfully commenced... Although works began on site to implement the permission, the development itself has not yet been fully built out. Therefore, as the planning permission has commenced, the planning permission cannot expire." (Entry updated 2026-04-20)
CLICK HERE FOR MORE DETAILS
NOTTINGHAMSHIRE, EAST MIDLANDS
Potential 24,369Proposed Waste-to-Feedstock Facility and Energy Recovery Facility, site of the former recycling plant and current Waste Transfer Station, Shireoaks Road, WorksopEnvaleShireoaks and Rhodesia Against Plastic Pyrolysis (SRAPP) Action Group. Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning application for an "Plastic Chemical Recycling Facility and Energy Recovery Facility" submitted to Nottinghamshire County Council in April 2024 [ES/4644]. It is unclear whether the facility would be regulated by Bassetlaw District Council as a SWIP, by the Environment Agency, or as a hybrid. As of 5th March 2025 no permit application has been announced. In October 2025 Nottinghamshire County Council issued a second Regulation 25 request which included a total of 19 questions to be answered prior to the determination of the planning application, and the applicant responded to this in December 2025 with a consultation on this new information running until February 2026. (Entry updated 2026-02-25)
CLICK HERE FOR MORE DETAILS
Potential 524,550East Midlands Energy Re-generation (EMERGE) Centre, Site of the Ratcliffe on Soar Power StationUniper UK LtdStop Ratcliffe Incinerator and Breathless in Nottingham - Campaign against the Incinerator (Facebook Group) and XR Nottingham.In August 2020 Uniper put in a planning application for a merchant incinerator and the Council voted to approve this in March 2022 subject to a potential call-in by the Secretary of State (ref ES/4154). According to the scoping request, the facility would use conventional incineration technology to burn C&I and LACW waste, including RDF, and have the potential to treat combustible fractions of construction and demolition waste as well as being intended to be capable of accepting certain waste biomass fuels. According to the applicant, the gross generating capacity would be 49.9MW, which is just below the threshold to be considered an NSIP. The Environmental Permit was issued in March 2022 [See EA consultation page]. Permit NP3608BQ issued in February 2022. In May 2024 the Environment Agency listed the facility status as "construction not started". In November 2024 it was reported that doubt had been cast over the future of the project after an investor disposed of its shares in the scheme [Source]. Development technically commenced in February 2025, preserving the planning permission, although there has been no announcement of financial close and no sign of meaningful construction as of February 2026. In November 2025 Uniper applied for a revised Local Development Order for the wider Ratcliffe on Soar site to create a larger data centre complex on the site, with Plot A (which includes the EMERGE plant) listed still as "Energy generation & storage; advanced manufacturing and other industrial uses; data centres; logistics (up to 180,000m² GFA), research & development; education, skills & training uses" - there is no indication that the source of energy generation would be incineration, but this has not been explicitly ruled out (25/02015/LDO). (Entry updated 2026-02-25)
CLICK HERE FOR MORE DETAILS
CAMBRIDGESHIRE, EAST OF ENGLAND
Potential 12,000 (clinical)Envar site, St Ives Road, SomershamEnvar Composting LtdPeople Opposing Woodhurst Incinerator (POWI) ( Facebook / Website)Granted planning permission on appeal in July 2024 (APP/E0535/W/23/3331431). In June 2022 Cambridgeshire County Council issued a Regulation 25 request for further environmental information. Planning application submitted to Cambridgeshire County Council in June 2021 for a healthcare waste incinerator (ref. CCC/21/088/FUL). In September 2021 a Q&A session was held with the applicant [Source]. In April 2023 planning application CCC/21/088/FUL was refused by Cambridgeshire County Council. This refusal was appealed and the appeal was subsequently recovered for determination by the Secretary of State (CCC/21/088/FUL). An application was submitted in May 2026 to discharge planning conditions 9, 12, 29, 31, and 33 [CCC/26/065/DCON]. (Entry updated 2026-06-30)
CLICK HERE FOR MORE DETAILS
Potential 625,600Medworth Energy from Waste Combined Heat and Power Facility, Land on the Algores Way Industrial Estate to the west of Algores Way in Wisbech, Fenland, CambridgeshireMVV Environment LtdWisbech Without Incineration (WisWIN) / No Incinerator in WisbechDevelopment Consent Order (DCO) issued in February 2024 for this NSIP application [See NSIP page]. Permit EPR/HP3441QA/A001 issued in May 2024. It was announced in February 2025 that Kanadevia Inova (formerly known as Hitachi Zosen Inova or HZI) is the builder for the incinerator and that MMV "has commenced the first stages of construction works on its Medworth Energy from Waste (EfW) facility" [Source, Source]. ENDS reported in December 2024 that this project had yet to reach financial close [Source]. While it was announced in February 2025 that ground clearance had begun on the site, the announcement did not state whether or not the project had reached financial close [Source]. However, in October 2025 it was reported that "main site construction works" had begun which indicates that financial close had been reached [Source]. As of 5th June 2025 the following requirements (planning conditions) had been discharged by Cambrideshire County Council: 2: Requirement 2 (detailed design) - part discharged in relation to Work No. 10 (Acoustic Fence); 6: Biodiversity Net Gain Strategy; 11: (Construction Traffic Management Plan) - part discharged in relation to Work No. 10 (Acoustic Fence); 21: Employment and Skills Strategy; 26: Air Safety (Parts 1 and 2); 24: Community Liaison Manager; and 27: Local Air Quality Monitoring Strategy. DCO Requirement 27 requires local air quality monitoring, and the strategy was approved in December 2024. The monitoring period is due start prior to commencement and is to carry on until the fourth anniversary of the date of final commissioning. (Entry updated 2025-11-25)
CLICK HERE FOR MORE DETAILS
ESSEX, EAST OF ENGLAND
Potential 379,658Thameside Energy Recovery Facility (previously "Tilbury Green Power Facility"), Former Cargill Sweeteners Plant, Tilbury DockViridor / KKRBiofuelwatchIn March 2020 the Secretary of State for BEIS approved a variation to increase capacity from 280ktpa to 350ktpa of MSW, C&I, SRF or RDF Source. Planning permission granted for 600ktpa wood burning incinerator in 2009, and extended in August 2015 to allow construction to commence by August 2015 [Source]. Permission to vary to allow 300ktpa of SRF, MSW and C&I to be burned at the incinerator submitted in August 2011 [Source]. Obtained £35m of GIB funding in March 2015 [Source]. In February 2019 Tilbury Green Power submitted a variation application to BEIS under the Electricity Act which stated: "Planning permission (13/01179/FUL) was granted by Thurrock Council for an amended Waste Wood Storage and Processing facility in April 2014...A decision to change the initial concept (30 MWe waste wood biomass plant and a 30 MWe waste to energy plant) to a 40 MWe waste wood biomass and a 20 MWe waste to energy facility was made in 2013, based on financial assessment of the project...For the second generating unit, it is proposed to convert 350,000 tonnes per annum of waste material delivered to the Phase 2 unit to electricity...The proposed Phase 2 configuration will consist of conventional moving grate combustion technology" [Source]. A permit variation application for 350ktpa of capacity went out for consultation in February 2023 (EPR/WP3007LM/V002). In October 2023 Thameside Energy Recovery Facility Limited applied to increase permitted capacity from 170,000/350,000 tpa to 379,658 tpa and this was approved in January 2024 (EPR/WP3007LM/V002). In May 2024 the Environment Agency listed the facility status as "construction not started". In November 2024 it was reported that the project had reached financial close and that "construction will begin shortly, marking the next phase of the project" [Source, Source]. It was reported in June 2025 that "The facility remains on track for commercial operation in 2028" and that the construction work to date had comprised of ground clearance (i.e. "groundwork and substructure activities") [Source]. (Entry updated 2025-07-31)
CLICK HERE FOR MORE DETAILS
Potential 8,000 (SRF)Land adjacent to Chelmsford City Racecourse, Great Leighs, ChelmsfordMoulsham Hall Farms Ltd and EPower International / easyPowerContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning application made in May 2021 (and approved in September 2021) for a 1MW pyrolysis demonstrator plant intended to treat Solid Recovered Fuel (SRF). According to the planning application the plant would use "easyPower's pure pyrolysis technology" and that "the plant will generate syngas which will be used as a fuel to provide a nominal output of 750 MWe from one on site gas engine" (ref. ESS/61/21/CHL). Planning permission graned in September 2021 and conditions 1, 19, 22 and 28 were discharged in November 2021 including notification of commencement. (Entry updated 2024-08-22)
CLICK HERE FOR MORE DETAILS
NORTH NORFOLK, EAST OF ENGLAND
Potential 50,000Waste R&D Trial / "Temporary installation and testing of proprietary pyrolysis plant and equipment", Scottow Enterprise Park, Lamas Road, BadersfieldStandard Gas SG No.1 Limited (Standard Gas)Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.In December 2023 planning permission was granted by North Norfolk District Council for a "Temporary installation and testing of proprietary pyrolysis plant and equipment" (PF/23/1796). This permission was varied in August 2025 to extent the 18 month timeframe to a 24 month timeframe but this variation did not seek "any change to the 60-day operational period during which the facility will be operational". A permit consultation opened in June 2025 and closed in July 2025 (ref EPR/TP3529LW/A001). According to the Supporting Information provided in the permit application by the applicant: "The Standard Gas pyrolysis technology will produce a clean ‘End of Waste’synthesis gas and therefore meets the definition of an Installation as defined by Section 1.2 ‘Gasification, liquefaction and refining activities’ paragraph A(1)(f)(iv) namely: ‘Activities involving the pyrolysis, carbonisation, distillation, partial oxidation or other heat treatment of other carbonaceous materials.’ On the basis that all gas combusted by the process meets the ‘End of Waste’ criteria, the CHP engines will be regulated as Medium Combustion Plant (MCP) and Specified Generators (SG) and operated in accordance with the Environmental Permitting (England and Wales) Regulations 2018 (As Amended)". The applicant also states that the feedstock would be pre-processed waste, "principally Refuse Derived Fuel (RDF) and other similar combustible material". A permit was issued in April 2026 which noted that: "The plant will pyrolyse refuse derived fuel (RDF) to produce cracked and cleaned syngas. The syngas will be burned in two CHP engines to generate power and provide heat to the wider Scottow Enterprise Park. It will treat about 50,000 tonnes of waste per year and generate approximately 5 MWe of electricity and 2.5 MWth of heat. The operator intends to clean the syngas to the extent that it is no longer a waste and emissions cannot be higher than from burning natural gas, in which case the requirements of IED chapter IV will not apply when it is burned. The operator intends to demonstrate gas quality equivalent to natural gas during commissioning, incineration emission limits will apply if this gas quality is not demonstrated" (EPR/TP3529LW). (Entry updated 2025-09-23)
CLICK HERE FOR MORE DETAILS
SUFFOLK, EAST OF ENGLAND
Potential 24,369Beccles Recycling Centre, Benacre Road, ElloughVC Cooke LTDContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.In April 2023 the RDF incinerator was granted planning permission by Suffolk County Council (SCC/0063/22W). SWIP permit issued by the Coucil in January 2024, with Council stating that they had "included a condition in the permit requiring V.C. Cooke to submit a carbon-management plan showing that the incinerator does not contribute to climate change." [source, see further information]. In February 2025 it was reported that work on the site was "underway" [Source]. In March 2025 it was reported that: "VC Cooke have begun construction of their waste incinerator at Ellough, with the smoke-stack now visible from the A145 roundabout nearby" [Source]. (Entry updated 2026-02-25)
CLICK HERE FOR MORE DETAILS
NORTH LONDON, LONDON
Potential 700,000Edmonton EcoPark AKA "North London Heat and Power Plant", near the Edmonton Solid Waste Incinerator on Advent Way, EdmontonNorth London Waste AuthorityStop The Edmonton Incinerator Rebuild and Extinction RebellionIncinerator proposed to replace existing Edmonton incinerator by around 2025, to be located next to the current incinerator site. Consultation began in November 2014, with a second phase of consultation in June 2015 [Source]. A Development Consent Order was issue by BEIS in February 2017 and "construction preparation could start in 2019. The existing plant would be decommissioned and demolished 2028, once the new facility up and running." [Source, Source, See dedicated webpage]. Environmental Permit issue in June 2017 [EPR/UP3232AC/A001]. In May 2024 the Environment Agency listed the facility status as "construction not started" but according to the project website construction started at the site in 2019 [Source]. It was reported in August 2024 that "High costs and labour shortages could delay the opening of the new Edmonton incinerator by two years, according to officials" and that "the NLWA, which is leading the project, said the incinerator will not be fully up and running until 2027, because of a 'challenging period' for the construction industry" [Source]. In August 2025 it was reported that "the construction of the new Edmonton incinerator is continuing to drag amid a series of local and international challenges" and that the 2027 completion date is now in doubt, with Delays were attributed in part to "challenges being faced by [sub-contractor] Acciona" by NLWA chair Councillor Clyde Loakes [Source]. (Entry updated 2025-09-23)
CLICK HERE FOR MORE DETAILS
DURHAM, NORTH EAST
Potential 10,500 (clinical and hazardous)Fornax Specialist Waste Treatment Facility, Merchant Park, Newton Aycliffe / Land North Of Hitachi Rail Europe Ltd, Millennium Way, Aycliffe Business ParkFornax Environmental Solutions LtdStop Heighington Lane Incinerator and Heighington Lane Incineration Plant Information Group (Facebook Group) and Great Aycliffe Town CouncilPlanning permission was granted on appeal in December 2022 (PINS appeal ref 3292099). A planning application was made in May 2021 for a "High Temperature Incineration Facility" to treat health care, hazardous, hygiene, and medical waste as well as law enforcement confiscated material (Durham CC planning ref. DM/21/01500/WAS). In July 2024 the applicant applied for planning conditions 7 and 10 to be discharged. In November 2024 it was announced that development began in June 2024, the steel framework had been completed at the site, and the project was due for completion by 2025 after which it would undero a 3 month commissioning period [Source]. In March 2025 it was reported that the plant would be operational by Spring 2025 [Source]. Permit consultation closed in July 2025 (EPR/QP3720LP/A001). It was reported in July 2025 that the would-be operator hopes the plant will "be in operation in the first quarter of 2026" and that "The EA is expected to announce a draft decision on the permit in the winter and then another public consultation will be held on that decision" [Source]. (Entry updated 2025-09-24)
CLICK HERE FOR MORE DETAILS
REDCAR AND CLEVELAND, NORTH EAST
Potential 250,000 - 300,000 (RDF)rDME Production Facility, Plot 6, Dorman Point, TeesworksCircular Fuels Arboretum Ltd, a joint venture between Dimeta (which is itself a joint-venture between SHV Energy and UGI International) and KEW TechnologyContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning application approved by Redcar & Cleveland for Waste-to-rDME (Dimethyl Ether) plant in June 2023 (R/2023/0080/ESM). According to the planning statement: "The plant is designed to process approximately 250,000 – 300,000 tonnes per annum of RDF fuels to undergo an advanced thermal treatment process, namely gasification, from which the resultant syngas will be scrubbed, CO2 stripped, compressed, and chemically converted to form the organic compound Dimethyl Ether...or DME...The primary use for the products produced by the plant will be as a direct replacement for fossil fuels (LPG, Propane, Butane etc) that are currently sold into the commercial and residential consumer markets". It was published in The Gazette (the official Public Record) in February 2025 that KEW Projects Limited and KEW Technology Limited had appointed liquidators [Source, Source, Source, Source] (Entry updated 2025-03-05)
CLICK HERE FOR MORE DETAILS
Potential 250,000Second waste-to-energy plant / "Teesport East Specialist Waste Processing and Conversion Centre", Teesport Commerce Park, Middlesbrough PD Ports / Wentworth Clean Power Limited / Teesport East Specialist Waste Processing and Conversion Centre LimitedContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.On the 10th of November 2020 a proposal for a 300ktpa plant at the TeesPort Commerce Park was announced [Source], and on the 25th of November 2020 a related announcement for a second plant with 250ktpa of capacity was announced [Source]. According to the press release for the 250ktpa plant, "the project is likely to be considered a Nationally Significant Infrastructure Project and various works and studies are already underway in advance of a formal planning application being submitted in the second half of next year [i.e. 2021]". Whilst the press releases refer to the project as using "highly advanced" technology, it is unclear whether they will be using conventional incineration or gasifcation/pyrolysis. Because the press release for the 250ktpa plant refers to 250ktpa of "specialist feedstocks" it is anticipated that this plant is related to "Teesport East Specialist Waste Processing and Conversion Centre Ltd" owned by Wentworth Clean Power Limited and would use some form of 'advanced conversion' technology rather than conventional incineration. No sign of the project on the NSIP website as of 16 February 2023. (Entry updated 2023-02-16)
CLICK HERE FOR MORE DETAILS
Potential 300,000Teesport Renewable Energy Centre, Dockside Road, to the south of Teesport Commerce Park, MiddlesbroughPD Ports / Wentworth Clean Power Limited / Teesport Renewable Energy Centre LimitedContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.On the 10th of November 2020 a proposal for a 300ktpa plant at the TeesPort Commerce Park was announced [Source], and on the 25th of November 2020 a related announcement for a second plant with 250ktpa of capacity was announced [Source]. According to the press release for the 250ktpa plant, "the project is likely to be considered a Nationally Significant Infrastructure Project and various works and studies are already underway in advance of a formal planning application being submitted in the second half of next year [i.e. 2021]". Whilst the press releases refer to the project as using "highly advanced" technology, it is unclear whether they will be using conventional incineration or gasifcation/pyrolysis. No sign of the planning application on the Council website as of 16 February 2023. (Entry updated 2023-02-16)
CLICK HERE FOR MORE DETAILS
Potential 500,000 (RDF)Redcar Energy Centre, Site of Redcar Bulk Terminal, RedcarPartnership betweem Low Carbon and PMAC EnergyContact coordinator@ukwin.org.uk to be put in touch with those opposing this developmentIn July 2022 it was reported that the facility was awarded Contracts for Difference support [Source]. Project announced in July 2018 [Source]. Planning permission was granted in January 2021 and is set for completition in 2025 [R/2020/0411/FFM, Source]. Permit issued in May 2025 (EPR/TP3502MS/A001). In ealy 2026 an Environmnet Agency Compliance Assessment Report (CAR) reported that: "The site is still awaiting construction. The operator advised [that] the project is in an advanced stage of development but the next step of selecting project partners will take place over the next 12-18 months". (Entry updated 2026-03-03)
CLICK HERE FOR MORE DETAILS
Potential 450,000Tees Valley ERF (TVERF / TV ERF), Grangetown Prairie, Land East of John Boyle Road and West of Tees Dock, GrangetownViridorStop Incineration North East (S.I.N.E), Newcastle Green Party, South Tees Green Party and Darlington Green PartyOutline planning permission granted in July 2020 (ref R/2019/0767/OOM) and various reserved matters were approved in August 2023. In July 2020, it was reported that a coalition of Local Authorities (Newcastle, Durham, Darlington, Hartlepool, Middlesbrough, Stockton, Redcar and Cleveland councils) were looking to progress a joint project to build an incinerator [Source, Source]. In January 2023 the Enviornment Agency published for consultation a permit application by FCC for an incinerator on the site with an increased capacity of 512ktpa (EPR/ZP3309LW/A001). Planning applications covering reserved matters and the discharge of planning conditions were submitted in March 2023 approved in August 2023 - Viridor's are reference R/2023/0247/OOM and R/2023/0246/RMM and R/2023/0227/CD, while Green Recovery Projects Ltd (FCC and iCON) has references R/2023/0253/RMM and R/2023/0224/CD. In August 2024 it was reported that the unstarted construction had been delayed and the project was not now expected to enter fully operation until 2029 [Source]. In January 2025 it was reported that Viridor was the only remaining bidder [Source]. In July 2025 a permit was issued to Viridor (EPR/AP3627SL). In August 2025 Viridor was named as the preferred bidder [Source]. In April 2026 it was reported that "Viridor and Tees Valley Energy Recovery Limited (TVERL) have reached financial close on the Tees Valley Energy Recovery Facility (TVERF)" and that "The contract has a value of £2 billion over 29 years, with the facility expected to be operational from 2030" [Source, Source]. (Entry updated 2026-06-30)
CLICK HERE FOR MORE DETAILS
STOCKTON ON TEES, NORTH EAST
Potential 200,000Land At New Road, BillinghamBillingham Energy Ltd and China Power Engineering (EPC Contractor)Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.In January 2025 Stockton-on-Tees Brorough Council received a Section 73 application to very conditions 4 and 6 of the planning application to remove the reference to gasificaiton from the description of the development to allow for a change of technology from the approved gasification plant to more conventional combustion, but this application was withdrawn in May 2026 - it is possible that this proposal could return in a different form as the reasons for withdrawal have not been stated (25/0148/VARY). A Shadow Habitats Regulations Assessment was submitted December 2025, and Natural England subsequently requested further information on 18 December 2025. Neither a Regulation 25 request or response are available on the Council website relating to this request for further informat as of 20 April 2026. Further information was subsequently provided. Planning permission for a gasification plant was issued to O2N Energy in February 2014 (13/2892/EIS). This was varied in January 2016 by O2N Energy to increase the capacity for the ERF including MRF from 150ktpa to 200ktpa (16/0195/VARY) and permission was technically implemented "through the demolition of buildings and works to construct the site access onto New Road". The permission was was varied again (20/2620/VARY) in January 2021, this time by EQtec, to "accommodate the proposed changes to the footprint and layout of the development", but retained the 200ktpa capacity and combination of gasification and MRF. (Entry updated 2026-06-30)
CLICK HERE FOR MORE DETAILS
TEES VALLEY UNITARY AUTHORITY, NORTH EAST
Potential 375,000 (RDF)Billingham Reach EfW, Billingham Reach Industrial Estate, StocktonTees Eco Energy Ltd (TeesEco)Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Original planning application for fluidised bed biomass-only plant approved in October 2009 (09/1562/EIS). Application to vary to being a moving grate (conventional incineration) RDF plant approved in November 2016 (16/2165/VARY). Permit application for RDF plant made in November 2017 and granted in September 2018 [EPR/NP3537YY/A001]. In November 2022 the operator "elected to defer permit review" and in October 2023 a permit variation was issued to requiring a report to be submitted showing compliance with the updated BAT Conclusions before the incinerator can be operated. Not to be confused with the two nearby Haverton Hill incinerators operated by Suez/Sita. (Entry updated 2023-10-24)
CLICK HERE FOR MORE DETAILS
TEESSIDE, NORTH EAST
Potential 200,000North East Energy Recovery Centre (Line 6), Haverton Hill Road, Billingham, TeessideSuez Environment (formerly SITA) Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.It was reported in September 2018 that "SUEZ is currently in the process of procuring an EPC contractor to build the new facility and it is anticipated that it will become operational in 2022" [Source]. Incinerator intended to treat household and business waste [Source]. Lines 1-3 are the Teesside Energy-from-Waste Facility, and Lines 4 and 5 are the North East Energy Recovery Centre. No sign of Line 6 enter construction as of February 2026. (Entry updated 2026-02-25)
CLICK HERE FOR MORE DETAILS
Potential ~1,000,000Lighthouse Green Fuels Project SAF Plant, Land at Port Clarence, near Stockton‐on‐TeesLighthouse Green Fuels Limited / alfanar Energy LtdContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.In February 2026 confirmed that they had yet to receive a permit review against the 2019 BAT Conclusions and so waste combustion is not yet permitted as this site. In October 2022 the Applicant applied for a direction from the Secretary of State that their proposed gasification facility to produce aviation fuel ("SAF") would be considered a proposal for an NSIP [Source]. Following this, in October 2022 the Secretary of State designated the proposa as an NSIP. In December 2022 it was announced that this project had been awarded Government funding from the Advanced Fuels Fund and it was claimed that the plant would use "black bag waste" and "gasification and Fischer-Tropsch technology", and that "the plant is expected to be operational in 2028 and produce 86.6 kt/y of SAF when at full operational capacity" [Source]. The development could be related to 23/0437/PICON registered in July 2023 but as of 29 August 2023 the name of the applicant had yet to be listed. In February 2026 Lighthouse Green Fuels posted an article stating that "Teesside...is moving from design into delivery" with "Front-End Engineering Design (FEED) close to completion and development consent progressing, the project is currently the most advanced second-generation SAF project in the UK", explaining that second-generation SAF meant their plant "converts solid biogenic waste and residues into fuel" and that "Second-generation SAF depends on sustainably-sourced biomass" such as forestry, sawmill and agricultural residues, and discussing the potential for carbon capture (Source). (Entry updated 2026-02-25)
CLICK HERE FOR MORE DETAILS
CARLISLE, NORTH WEST
Potential 15,000 (Tyres)Heathlands Tyre Pyrolysis Facility, Kingsmoor Park, Heathlands Industrial EstateCanigou PTD LtdCarlisle Residents Against Incinerator (CRAIN), Rockcliffe and District Action Group, and Sustainable CarlisleA proroposed D10 (disposal) tyre pyrolysis facility intended to treat granulated waste tyres to produce syngas, pelletised char, and pyrolysis oil. Classified as a Small Waste Incineration Plant (SWIP). Permit consultation held by Cumberland council in July 2024 [Source]. The December SWIP permit application stated that a planning application will be submitted to Cumbria County Council and that pre-application discussions have taken place. (Entry updated 2024-08-22)
CLICK HERE FOR MORE DETAILS
Potential 24,000Embedded Advanced Thermal Treatment and CHP Plant, Land adjacent to former Unit D, Kingmoor Park Rockcliffe Estate, RockcliffeNorth West Recycling / North West Regeneration LtdCarlisle Residents Against Incinerator (CRAIN) and Rockcliffe and District Action Group. Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning application for "Establishment of an Energy from Waste facility comprising of a Solid Recovered Fuel (SRF) fed Gasification Plant with a 20m high flue stack and associated synthetic gas fuelled Combined Heat & Power (CHP) generation engines..." submitted in November 2023 to Cumbria County Council (1/23/9005). The latest application amends the stack height to 23m. Planning Statement refers to "ETGAS Gasifier Units". Briefing Note from the Applicant states: "Due to the nature of the operations, the processes will require to be regulated either by the Local Authority as a Schedule 13A Small Waste Incineration (SWIP) Process or the Environment Agency (EA) as a Bespoke Waste Installation under Part A(1) Section 1.2(g) Combustion Activity of the Environmental Permitting Regulations (EPR regulations) dependent on scale". Section 1.2(g) relates to "Activities involving the liquefaction or gasification of other carbonaceous material". Planning application 1/23/9005 was refused by Cumberland Council in June 2025, with the applicant having lodging an appeal in December 2025. Campaigners are receiving support from a barrister to participate in the inquiry [Source, Source]. The hearings are due to begin on 2nd June 2026 and the appeal documents are on the Council website's appeal tab (3377058, 1/23/9005). (Entry updated 2026-02-25)
CLICK HERE FOR MORE DETAILS
CHESHIRE, NORTH WEST
Potential 600,000Fulcrum NorthPoint, Essar, Stanlow Manufacturing Complex, Ellesmere PortFulcrum BioEnergyContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.In January 2023 Fulcrum BioEnergy was awarded Advanced Fuel Fund support to develop a waste-to-aviation fuel (SAF) plant. According to media reports the facility is due to come on-stream in 2027. (Entry updated 2023-08-29)
CLICK HERE FOR MORE DETAILS
Potential 175,000 (RDF and Waste Wood)Bio-Substitute Renewable Fuels Facility / "Protos Energy Hub", Protos, Grinsome Road, Ellesmere PortPeel Environmental and Progressive EnergyContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning application for a gasification-type incinerator to treat waste wood and RDF and convert it into transport fuels was approved in November 2019 [Source, Source] (Planning reference 18/04671/WAS). It was reported in March 2019 that a planning had been submitted for a gasification facility intended to convert RDF and Grade B and C Waste Wood into a gas for possible injection in to the Grid [Source]. Planning permission18/04671/WAS approved in March 2022. It was reported in February 2024 that "construction work is yet to be confirmed on a bio-substitute natural gas renewable fuels facility" [Source]. As of August 2024 the project was not listed by the developer as an active project [Source]. (Entry updated 2024-08-22)
CLICK HERE FOR MORE DETAILS
LANCASHIRE, NORTH WEST
Potential 24,000 (pelletised SRF)Burnley gasification plant, land at Hapton Valley Transfer Station, Envirofuels site, Hapton Valley Estate, Accrington Road, BurnleyETGAS Burnley LtdContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning permission for a SRF gasification plant was approved by Lancashire County Council in November 2023 (LCC/2023/0024). The facility would be permitted as a SWIP. (Entry updated 2023-11-29)
CLICK HERE FOR MORE DETAILS
Potential c. 1,000 tpa of low and intermediate-level radioactive materialBulk Processing Unit, Clean Energy Technology Park, near the Sprinfields nuclear fuel production installation, Station Road, Salwick, PrestonPerma-Fix / WestinghouseRadiation Free LakelandAnnounced in March 2022 as a "refractory lined oven" called a "Bulk Processing Unit (BPU)" intended to treat "a wide range of low and intermediate-level radioactive material" [Source]. In April 2022 the Environment Agency stated: "The Environment Agency has been approached by Westinghouse UK and Springfields Fuels Limited to discuss the potential for a Perma-Fix waste treatment facility to be constructed and operated at the Springfields site. We have provided advice and guidance on the permitting requirements for such a facility, and the information that would need to be submitted to us in order to proceed with a permit determination. At this early stage, we have not had sight of detailed design proposals for the facility and we have not been given an indication of when a permit application could be submitted." [Source]. No sign of a planning or permit application as of August 2024. (Entry updated 2024-08-22)
CLICK HERE FOR MORE DETAILS
Potential 120,000Thornton Energy Recovery Centre (TERC), Hillhouse Business Park, Thornton-CleveleysSesona LtdContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.The planning application was submitted January 2023 (LCC/2023/0003), with further ecological and noise information published in July 2023. According to the application: "The TERC would generate electricity by way of an Organic Rankine Cycle (ORC) which would be driven through the combustion of up to 120,000 tonnes per annum (tpa) of residual waste / RDF". Environmental permit application launched by the Environment Agency in July 2023, with the permit issued in March 2024 (EPR/ZP3329SS/A001) . In April 2024 the Council resolved to approve the planning application (LCC/2023/0003) subject to a legal agreement to secure highway improvements and biodiversity enhancements and this position was confirmed in July 2025 when the application was reconsidered by the Planning Committee in light of the Defra Capacity Note. As of 16 January 2026 the planning permission has yet to be formally issued as the Section 106 agreement has yet to be signed. (Entry updated 2026-01-16)
CLICK HERE FOR MORE DETAILS
MERSEYSIDE, NORTH WEST
Potential 60,000 (RDF)Southport EfW Plant, Southport Hybrid Energy ParkEqtec and Rotunda Group (and its subsidiary Shankley Biogas)Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.In September 2020 it was reported that Eqtec had signed a co-development agreement with Rotunda Group and Shankley Biogas for the Southport Hybrid Energy Park project, which was said to be a gasification plant to treat "more than 55,000 tonnes of RDF" [Source]. The proposed site is the site of Southport Skip Hire (55 Crowland Street, Southport) which is where Iona Capital Ltd obtained a mix of full and outline permission for 80,000tpa of Anaerobic Digestion, Waste Transfer Station and biomass boiler capacity from Sefton Council in 2016 (ref DC/2016/00534). According to a July 2022 Fact File from Eqtec, by June 2022 they were co-developer and gasification technology provider of the project, working closely in partnership with Rotunda Group and its subsidiary Shankley Biogas at Watts Industrial Estate, Southport Hybrid Energy Park, Merseyside, UK, and had "selected Wood as our technology partner for design and deployment of a ...waste-to-hydrogen solution during Phase 2 development of the multi-technology project" [Source]. A project page last updated in September 2022 indicated that they had yet to reach financial close [Source]. (Entry updated 2024-08-22)
CLICK HERE FOR MORE DETAILS
WEST LANCASHIRE, NORTH WEST
Potential 3,650 (hazardous waste)Simonswood IncineratorCulzean W2E LtdStop the Simonswood Incinerator (Facebook Group)Planning application for a medical waste incinerator submitted to Lancashire County Council in January 2022 (LCC/2022/0003). Planning committee voted to approve the planning application (LCC/2022/0003) in December 2022, but as of August 2024 no section 106 had been agreed. (Entry updated 2024-08-22)
CLICK HERE FOR MORE DETAILS
ANTRIM AND NEWTONABBEY, NORTHERN IRELAND
Potential 4,6506A Caulside Drive, Newpark Industrial EstateMcQuillanContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning application LA03/2023/0131/F for a "thermal recovery building" approved in April 2024 - according to the report feedstocks would include "pharmaceutical waste, oil sludge, paint/adhesives, rags/wipes, polymer waste, laboratory smalls/solid toxic solvents and various liquid solvents" [Source, See planning page]. (Entry updated 2024-04-16)
CLICK HERE FOR MORE DETAILS
ARMAGH CITY BANBRIDGE AND CRAIGAVON, NORTHERN IRELAND
Potential 7,728Combined Heat & Power Thermal Treatment System, 113 Milltown Road, Tullymore Otra, Milltown, Armagh (near Benburb)AIC GroupResidents Against Incineration [FB Page]A pre-application "community engagement meeting" was held in December 2025 for a proposed small waste incineration plant (SWIP) intended to treat a mix of hazardous (10-15%) and non-hazardous (85-90%) waste from Northern Ireland [Source]. A revised Pre-Application Notification was approved in March 2026 to hold a drop-in event on 1st May 2026 and a webpage to be live for at least 28 days. As of 30 June 2026 the PAN webpage is no longer online. (Entry updated 2026-06-30)
CLICK HERE FOR MORE DETAILS
CO ANTRIM, NORTHERN IRELAND
Potential 314,000 (pre-treated mixed waste and biomass such as waste wood)Kilroot Multi Fuel CHP Facility, Lands at Kilroot Power Station, Station Road, CarrickfergusEP Kilroot Ltd (subsidiary of EP UK Investments)Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning application received in April 2021 and granted in May 2022 (LA02/2021/0439/F). It was reported in May 2022 that "it is anticipated that the facility will be up-and-running by the end of 2025" [Source]. Various planning conditions were discharged in 2023 and 2024, including the Final (Contractors) Construction Environmental Management Plan (CEMP) which was approved in February 2024. The Construction Traffic Management Plan from May 2024 which is a supplement to the CEMP (LA02/2024/0152/DC) states that: "The proposed construction programme is expected to take 3 years. It is anticipated that construction will commence in Q4 2024". In April 2025 EPUKI implied that they have yet to enter construction and yet to secure waste contracts, stating that while "all pre-commencement planning conditions have now been discharged" that "comprehensive engagement with construction partners is ongoing", that "we are already in the process of securing waste contracts", and that the EPUKI "look forward to moving on to the next phase and the facility being operational in 2028" [Source]. As of December 2025 no announcement has been made that full construction has begun. (Entry updated 2025-12-09)
CLICK HERE FOR MORE DETAILS
COUNTY ANTRIM, NORTHERN IRELAND
Potential 211,000 nominal capacity (wider site has capacity for 300,000 of up capacity to be split between MBT and EfW)Hightown Quarry, Boghill Road, Mallusk, Newtonabbey, nr. BelfastArc21 / Becon Consortium (E.ON)NARC21 (No-ARC21), Friends of the Earth Northern Ireland, Green Party, Residents Against the Hightown Incinerator, Sinn FeinDirect combustion incinerator intended to burn RDF and untreated waste. Planning application currently under consideration again following a complex legal history (T/2014/0114/F). Updated Planning Statement and Environmental Statement Addendum submitted in April 2025. In September 2025 DAERA announced that "New information received from the applicant, consultation responses and representations will be published here on the Planning Register" and set out the position of various public bodies. On 6 March 2026 the Department for Infrastructure wrote to the applicant in a 49-page letter asking for additional information, setting out queries from various DAERA departments, with the applicant being given 3 months to submit a response [Source]. The proposal has a long history: Granted planning permission in September 2017, but a successful legal challenge was brought by NoArc21 in November 2017 and the decision was quashed by the High Court in May 2018 and this quashing was upheld by the Court of Appeal in July 2018 [Source, Source, Source]. Planning application submitted March 2014, refused September 2015 by the Environment Minister, and appealed to the Northern Ireland Planning Appeals Commission in October 2015 (T/2014/0114/F) [Source]. Proposals were announced in March 2013 as part of the arc21 Residual Waste Treatment Project (Source). arc21 is "the umbrella waste management group for 11 councils in the east of Northern Ireland". Planning permission was refused by the Infrastructure Minister for Northern Ireland in March 2021 [Source]. In May 2023 Northern Ireland's High Court quashed the refusal, meaning the planning application was "remitted back to the Department for the decision to be retaken" [Source, Source]. (Entry updated 2026-04-20)
CLICK HERE FOR MORE DETAILS
ABERDEENSHIRE, SCOTLAND
Potential 200,000Inverurie Energy Plant / "Thainstone Energy Plant", Paper Mill Building, 4 Kirkwood Commercial Park, Thainstone, InverurieAgile EnergyContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning application approved by Aberdeenshire Council on 25 June 2021 (ref APP/2020/1324). No sign of an environmental permit application as of mid-March 2024, indicating that the project might be stalled. Was previously the site for Kirkwood Homes Investments Ltd 's proposal for a "Small scale" plasma gasification incinerator intended for RDF derived from C&I and MSW back in 2012. The previous proposal was for "alterations and extension and change of use from General Industrial Class 5 (Paper Mill) to Energy From Waste Facility Utilising Plasma Gasification". SEPA stated in April 2024 that no pre-application discussions for a permit had taken place in the past year. IIn May 2024, the Applicant submited a request to delay the discharge requirement of Condition 9 (Landscaping) to allow proposal to be implemented prior to this condition being discharged (APP/2024/0902). This request was subsequently withdrawn, and instead the applicant has applied to discharge the planning condition through the original planning consent. The Council has accepted that development commenced on the site despite the pre-commencement condition for landscape not having been met. (Entry updated 2024-08-06)
CLICK HERE FOR MORE DETAILS
FALKIRK, SCOTLAND
Potential 176,000Avondale, Avondale Quarry, Avondale RoadNPL GroupFriends of the Earth ScotlandIn February 2024 it was reported that "the project construction is likely to commence in 2025 and is expected to enter into commercial operation in 2026" [Source]. Full planning permission was granted in November 2020. Avondale Holdings Ltd and Avondale Environmental Limited's 2023 company report submitted in January 2024 states that: "Avondale remains in advanced negotiations to take this project forward and implemented planning permission in late 2023". Implementing planning permission is not the same as building the facility, and typically means doing enough to prevent the permission from expiring. No sign of an environmental permit application as of mid-March 2024. It was previously stated that: "The construction is expected in 2022/2023 and the facility commissioned for use in mid-2024" but there appears to be no sign that any substantial has begun as of mid-March 2024 [Source]. SEPA stated in April 2024 that no pre-application discussions for a permit had taken place in the past year. In September 2025 Avondale Environmental Limited entered administration [Source] (Entry updated 2026-01-16)
CLICK HERE FOR MORE DETAILS
PERTHSHIRE, SCOTLAND
Potential 85,000Binn Eco Park, Binn Farm, near GlenfargBinn Group / Iona Capital / Paprec Energies BinnCommunities Against Toxics Scotland (CATsScotland) and Tayside Environmental Action Group and Green Alternatives to Incineration in Scotland (GAINS)In November 2023 it was reported that Martin GmbH will supply the grate system and that the plant could come online as early as 2026 [Source]. In January 2020 it was reported that the Binn Group intended to apply to vary the proposal to increase the capacity to nearly 85,000 tonnes per annum, and that they were hoping the facility would be operational by 2023 but in February 2021 this was delayed to 2024 [Source, Source]. In April 2020 it was reported that a proposal of application notice (PAN) had been submitted to Perth and Kinross Council [Source]. Permission to increase the capacity was approved in 2020 (20/01242/FLM) [Source]. Sita gained planning permission for a gasification-type incinerator at the site in October 2011 (10/01767/FLM). Supposedly "most of the material processed will be from households, with a small amount of business waste". Sita obtained planning permission for a mass-burn incinerator of the same capacity at the site in 2007 but reportedly had a change of heart regarding the type of thermal treatment [Source]. In March 2022 it was reported that "TIRU is to build and operate a £70 million facility near Perth on behalf of owners Binn Group and investment partners Iona Capital" and that the incinerator would not be operational before late 2024 at the earliest [Source]. In August 2023 it was reported that "Local authority Perth & Kinross Council awarded a £50m residual waste treatment contract to Paprec Energies Binn Ltd" for this incinerator. In April 2024 SEPA informed UKWIN that: "EfW plant is currently in the early stages of construction at Binn Eco Park however an application for a new PPC Permit has not yet been submitted to SEPA. On contacting the site operators over the last week, they have stated that an application is imminent". However, in October 2024 it was reported that Paprec had "been forced to dramatically halt work at its Scotland-based build due to a delay in securing grid connection" and that it was unclear when development would resume [Source]. In December 2025 it was reported that plans for the incinerator were "disarray" and that "Perth and Kinross Council has scrapped a £50m contract to send non-recyclable household waste to a controversial incinerator plant", with Perth and Kinross Council describing the move as a "mutual termination of the current contract" [Source, Source, Source] (Entry updated 2026-01-16)
CLICK HERE FOR MORE DETAILS
BERKSHIRE, SOUTH EAST
Potential 440,000Lakeside Energy from Waste (Replacement), Land west of the Iver South Sludge dewatering Centre and south of the M4 motorway, Colnbrook, SloughS Grundon Waste and Viridor / KKRContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.In January 2025 the UK Government confirmed their plan to proceed with a third runway at Heathrow, and previous work indicated this would require the Lakeside incinerator to be replaced at a different location [Source]. A site on land west of the Iver South Sludge dewatering Centre and south of the M4 motorway was originally announced as the replacement site in February 2019 and this was subject to both a planning application (P/17826/000) and a permit application (EPR/PP3330QY/A001), but in October 2019 it was reported that "the intended site for Lakeside Energy interferes with its plans for a Heathrow rail link". Specifically: "Network Rail warns that the incinerator would interfere with a ventilation shaft and building for the tunnel, and states that the site will have to be redesigned". In August 2020 it was reported that the application had been withdrawn due to successful legal action against the third runway [Source]. However, it is possible that a new re-worked proposal on this site might be submitted in the future. (Entry updated 2025-05-30)
CLICK HERE FOR MORE DETAILS
KENT, SOUTH EAST
Potential 606,000Medway Energy Centre, MedwayOne Energy Hub, Site of the Former Kingsnorth Power Station, Hoo St Werburgh, Rochester, MedwayIndaver / Low Carbon / UniperContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.RDF/SRF incinerator granted outline planning permission by Medway council in August 2023 (MC/21/0979). Various reserved matters approved in July 2024 (MC/24/0489 and MC/24/0421). Advertised as being planned to have a 49 MW capacity. ENDS reported in December 2024 that this project had yet to reach financial close [Source]. In August 2025 the Environment Agency issued an environmental permit for the site (EPR/DP3126SA/A001) with a permitted capacity of 606,000 tonnes per year and a waste type of "RDF & SRF". In February 2026 Indaver announced that it had e[Source] "secured exclusive rights to acquire the Medway Energy Centre, from Low Carbon" and that "Indaver is also in advanced discussions with a leading EPC contractor to provide design, build and construction services" [Source] (Entry updated 2026-04-20)
CLICK HERE FOR MORE DETAILS
WEST BERKSHIRE, SOUTH EAST
Potential 150,000 (RDF)Reading Quarry, Berrys Lane, Burghfield, ReadingJ Mould (Reading) LtdReading Against the Incinerator (RATI). Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning permission granted on 2nd September 2022 [20/02029/COMIND]. According to the planning application's planning statement, it is intended to treat RDF from household, industrial and commercial sources "from the on-site Reading Quarry Waste Recycling and Transfer Facility (WRTF) and other sites in the locality" [Source]. The form of incineration technology is unclear - the environment statement claims: "RDF is gasified within a furnace before being combusted to create high pressure steam" which uses the term gasification but seems to more closely match a technical description of a conventional incinerator as it does not refer to thermal treatment taking place in the absence of oxygen. The REPD for January 2023 stated that the plant entered construction in 2023 [Source]. In May 2024 the Environment Agency did not include this facility in their list of plants that had a permit or outstanding permit application and there has been no sign of a permit application as of 23 September 2025. In September 2025 West Berks council confirms that: "we consider that the planning permission to have been implemented" because the applicant had notified them that development had technically commenced in August. (Entry updated 2025-09-23)
CLICK HERE FOR MORE DETAILS
Potential 104,000Advanced Conversion and Recovery Facility at Theale Quarry, Theale, ReadingVertigo (consultancy) and EPI (technology provider)Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.In March 2025 West Berkshire Council approved planning permission for a "Advanced Conversion and Recovery Facility" (24/00247/MINMAJ). According to the Planning Statement: "The proposal seeks to develop a facility which would include 12 pyrolysis units processing a total of 104,000tpa", with the output to be a "fuel gas and a solid carbon char" and it is stated that: "...the main commercial focus of the plant is to produce hydrogen and/or bio-naphtha (a precursor of Sustainable Aviation Fuels or other liquid fuels), it is quite possible that the gas engines will only be used occasionally, or not at all. They are however included in the scheme for purposes of commercial flexibility/resilience" but that: "The gas engines could be used if the hydrogen/bio-naphtha markets become unviable, or if there is a need for the creation of power for the use of the plant if electricity supplies become unreliable or uneconomic". Proposal discussed in 21 May 2024 in a presentation to West Berkshire's Environment Advisory Group Open Forum. According to the minutes, the site would use "EPI's pure pyrolysis technology" to treat "small pieces of card, wood, or other organics, plastic or films – Refuse derived fuel (RDF), that other Materials Recycling Facilities would not take" and "would take sustainable biomass, forestry, and agricultural waste. Such as short rotation willow, miscanthus" and would "Target the commercial and industrial construction and demolition markets run by private companies". (Entry updated 2025-07-31)
CLICK HERE FOR MORE DETAILS
WEST SUSSEX, SOUTH EAST
Potential 230,000Centre for Horsham Energy Recovery (CHER), Former Wealden Brickworks off Langhurst Wood Road, HorshamQairNo Incinerator 4 Horsham (Ni4H) [also see Ni4H Facebook Page]


Planning permission WSCC/062/16/NH allowed on appeal in Februay 2020 with 28 planning conditions, including an R1 condition (PINS Ref APP/P3800/W/18/3218965). Initial planning application withdrawn (with stated intention to re-submit) in July 2017 after planning officer recommended refusal [Source]. Second planning application submitted in March 2018 (ref: WSCC/015/18/NH and refused planning permission in June 2018 [Source]. Environmental Permit Consultation closed on 2nd August 2021 [See consultation]. Later in August the Environment Agency issued a Schedule 5 notice asking for further information about noise, site condition, waste input and effluent discharge. Permit issued in November 2022. ENDS reported in December 2024 that this project had yet to reach financial close [Source]. In August 2024 it was reported by ENDS that developers were targetting financial close in the first half of 2025, but as of 9th December 2025 financial close had yet to be announced [Source]. At the November 2025 Community Liaison Group for the Horsham incinerator QAIR stated that financial close had yet to be reached for the Horsham plant. ) (Entry updated 2025-12-09)
CLICK HERE FOR MORE DETAILS
Potential 15,000Hangar Building, Rudford Industrial Estate, FordSCS Waste (Hoare Construction Holdings Limited / South Coast Skips Limited)Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Vote to grant planning permission granted by West Sussex County Council passed on 10th January 2023. Application reference WSCC/015/22 for change of use of existing hangar building, with planning consent issued in September 2023. A SWIP incinerator intended to use RDF generated from the adjacent Waste Transfer Station. SWIP permit application is dated November 2023 (See consultation page) (Entry updated 2023-01-12)
CLICK HERE FOR MORE DETAILS
WINDSOR AND MAIDENHEAD, SOUTH EAST
Potential 150,000Hythe End Farm ERF, Fowles Crushed Concrete, Hythe End Farm, Hythe End Road, Wraysbury, StainesWraysbury Resource Management Limited (was previously listed as Fowles Crushed Concrete Limited)Hythe End Road Estate Limited and its chair Simon are a contact point for those opposing this development. Contact coordinator@ukwin.org.uk to be put in touch with others opposing this development.Scoping opinion issued by Royal Borough of Windsor and Maidenhead in May 2025 (24/02253/EIASCO) but no sign of planning application of May 2025. No indication within the scoping request that this site is intended as a replacement for the Lakeside incinerator, but the site is being proposed near to Heathrow airport. According to the applicant's scoping request: "The waste will be primarily commercial and industrial waste (C&I), but the facility will be capable of treating residual municipal waste in the event it is awarded a local authority contract". (Entry updated 2025-06-25)
CLICK HERE FOR MORE DETAILS
BCP, SOUTH WEST
Potential 260,000Canford Resource Park, Arena Way, Magna Road, WimborneMVVExtinction Rebellion Bournemouth, Christchurch & Poole (BCP) and MagwatchPlanning application refused by BCP in June 2025, and MVV has appealed. The appeal formally started on 8th January 2026, with interested party submissions due on or before the 12th of February 2026 and heargins scheduled to begin 2nd June 2026 (Appeal ref 6002440). In July 2023 MVV submitted a planning application BCP Council for their proposed incinerator (APP/23/00822/F). In January 2023 MVV announces that they would be running three information events in January 2023 for their proposed incinerator [Source]. Scoping Report submitted by MVV to BCP Council in April 2022 stated that the incinerator would use residual waste and Refuse Derived Fuel on land previously granted permission for a gasification and pyrolysis plant [Source]. Environmental permit issued by the Environment Agency in June 2025 (EPR/SP3127SF/A001). (Entry updated 2026-01-16)
CLICK HERE FOR MORE DETAILS
Potential 60,000 (consented) and 105,000 (planned)Chapel Gate ERF, Eco Park, Chapel Lane, Parley (near Bournemouth Airport)Eco Sustainable SolutionsStop Parley and Canford Incinerators (Facebook Group) and Hurn Parish Council, West Parley Parish Council, and Ferndown Town CouncilPlanning permission granted by BCP Council for 60,000 tpa plant in December 2022 (ref 8/21/0207/FUL). In October 2024 it was announced that there were plans to increase the capacity from 60,000 tpa of residual waste to 105,000tpa of Refuse Derived Fuel [Source], however as of 5th March 2025 no planning application has been advertised. In September 2020 it was reported that there Eco Sustainable Solutions had plans to build an incinerator [Source]. In May 2024 the Environment Agency did not include this facility in their list of plants that had a permit or outstanding permit application, and no permit application has been publicly advertised as of 25 September 2025. In November 2024 Eco Sustainable solutions Ltd submitted an EIA Scoping Request to increase the capacity to 105,000 tpa and increase the building height (8/24/0808/SCOPE). A scoping opinion was provided in January 2025. In June 2026 a planning consultation began on the proposed expansion to 105,000 tpa, which included the addition of a front-end process to extract up to 25,000 tpa of material prior to the 105,000 tpa of "thermal combustion" at the otherwise conventional incinerator (P/26/02462/FUL). The scheme would involve a higher stack height of 42m compared to the consented 38m. (Entry updated 2026-06-30)
CLICK HERE FOR MORE DETAILS
BRISTOL, SOUTH WEST
Potential 28,500Avonmouth High Temperature Incinerator / "Avonmouth Energy Facility", Kings Weston Lane, AvonmouthGrundonContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Permit consultation launched for High Temperature Incinerator in July 2024 to vary the permit from the historic "Non-hazardous waste incinerator pyrolysis facility" plant associated with New Earth Solutions (EPR/LP3505LQ/V002) [Source]. It was reported in July 2024 that: "...in February 2021 the facility was sold on to Grundon Waste Management, which has now removed the former-gasification technology and is replacing it with a rotary kiln combustion system" [Source]. Grundon secured permit for this variation in January 2026 (LP3505LQ). (Entry updated 2026-04-20)
CLICK HERE FOR MORE DETAILS
DEVON, SOUTH WEST
Potential 87,000 (RDF)Hill Barton Energy Generation Facility, Hill Barton Business Park, Stuart Way, Clyst St. Mary, ExeterExeter Waste to Energy LimitedContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning permission granted by Devon County Council in March 2010 (DCC/2909/2009) and varied in November 2019 (DCC/4150/2019). Permit application consultation announced in December 2020, which states that the plant would "process commercial and industrial waste in the form of RDF through gasification" (EPR/EP3105BJ/A001). The permit was issued in July 2021. In May 2022 it was reported that money had been set aside to provide heat from a "forthcoming plant" in East Devon which Letsrecycle understood to be the Hill Barton plant. [Source]. In May 2024 the Environment Agency listed the facility status as "construction not started". In February 2025 it was reported that this incinerator was granted money from the Green Heat Network Fund to develop a heat network. [Source]. (Entry updated 2025-03-05)
CLICK HERE FOR MORE DETAILS
DORSET, SOUTH WEST
Potential 202,000 (RDF)Portland Port, CastletownPowerfuel PortlandStop Portland Waste Incinerator, The Portland Association, Jurassic Coast Incinerator Action Group and Coalition Against The BurnerPlanning permission granted on appeal in September 2024 (APP/D1265/W/23/3327692), and in October 2024 it announced that legal challenge had been issued by a local campaigner [Source]. A legal challenge against the grant of planning permission is ongoing as of July 2025 with a hearing expected by Spring 2026. Plans for the incinerator intended to burn RDF were announced in November 2019 [Source, Source]. Planning application was submitted in September 2020 [See application ref WP/20/00692/DCC]. In March 2023 the Dorset council voted unanimously to refuse planning permission WP/20/00692/DCC (See video recording). Environmental permit AP3304SZ was issued in February 2025. On 5th November the Environment Agency opened a consultation on a variation to the permit that would increase the number of waste codes that could be incinerated, with the consultation closing on 18 December 2025, with a Fire Prevention Plan and other additional published in February 2026 in response to a Schedule 5 notice - people can make submissions to the EA on this additional information [EPR/AP3304SZ/V002]. (Entry updated 2026-02-25)
CLICK HERE FOR MORE DETAILS
PLYMOUTH, SOUTH WEST
Potential 60,000 (RDF, SRF and Waste Wood)Plymouth EfW Facility AKA "Biomass UK No 4", Units 21-29, 1 Belliver Way, RoboroughAviva / Biomass UK No.4 LimitedContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.According to a permit application consultation that began in February 2024, the applicant "intends to upgrade the existing facility and make changes to the combustion technology and boiler to enable the plant to operate reliably on a wider range of fuels to include refuse derived fuels (RDF), Solid Recovered Fuels (SRF) as well as mixed (PAS111:2012- Grade A – C) non-hazardouswaste wood feedstocks" and "previous plant owners and operators, Dartmoor Bio Power Limited (DBPL), under environmental permit number EPR/XP3134AW, using waste wood as a feedstock for gasification. Following DBPL entering into administration in 2018, the site was closed and permit duly surrendered by the Environment Agency (EA) on the behalf of the company" (EPR/BP3124SC/A001). Permit EPR/BP3124SC issues in November 2024. . (Entry updated 2025-03-05)
CLICK HERE FOR MORE DETAILS
WILTSHIRE, SOUTH WEST
Potential 243,000Northacre Renewable Energy Centre, Stephenson Road, Northacre Trading Estate, WestburyQairNorth Wiltshire FoE and Westbury Gasification Action Group (WGAG) / No Westbury Incinerator and South West Wiltshire Green Party
In July 2024 it was reported that, although Hills maintains a shareholding, Qair had brought the project from Evero and was expected to provide the majority of the feedstock  - it was also reported that "Qair is now aiming for financial close on the Northacre project next year and “expects” the plant operational in 2028" [Source]. In July 2022 Hills appealed on the grounds of non-determination, and subsequently on 27th July 2022 Wiltshire Councillors voted that their position was that planning application should be refused [Source]. The planning inquiry closed in December 2022, and on 21 February 2023 the grant of approval was announced. In June 2022 the EA granted permit ref EPR/CP3803LV/A001. In August 2020 a planning application was made to change the technology to conventional incineration and the Council voted to approve this in June 2021 subject to a potential call-in by the Secretary of State [Source] (20/06775/WCM / AP-36551). Not to be confused with the Honda plant at the same industrial estate. In January 2021 it was reported that Northacre Renewable Energy Ltd and Bioenergy Infrastructure Group (now known as Evero) had applied to increase the capacity from 160ktpa to 243ktpa and to move from advanced thermal technology to moving grate combustion [Source]. ENDS reported in December 2024 that this project had yet to reach financial close [Source]. While it was reported in June 2025 that the project was "making progress", as of 9th December 2025 no financial had been announced [Source]. At the November 2025 Community Liaison Group for the Horsham incinerator QAIR stated that financial close had yet to be reached for the Horsham plant. (Entry updated 2025-12-09)
CLICK HERE FOR MORE DETAILS
NORTH WALES, WALES
Potential 80,000Deeside Refuse Derived Fuel Project gasification plant, Site of the former Gaz De France power station, land off Weighbridge Road, Deeside Industrial Estate, FlintshireEQTEC and the Rotunda GroupContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.It was announced in July 2020 that EQTEC and the Rotunda Group would seek permission for an "advanced gasification technology" plant to use waste from the nearby RDF plant which currently has a capacity for 182,000tpa as part of a deal with Logik Developments Limited [Source, Source]. Following the Welsh Government's moratorium on incinerators of 10MWe and over, the proposal was revised to be a gasification plant with a reduced capaicty of 9.9MWe and a reduced throughput of 80,000tpa and this was approved by Flintshire Council in October 2021 with a time limit which would only allow the facility to operate until 2050 [Source, Source]. In February 2023 it was reported that Eqtec "has been unable to offload its incomplete Deeside...gasification technology facility...." [Source, Source]. (Entry updated 2023-08-29)
CLICK HERE FOR MORE DETAILS
POWYS, WALES
Potential 23,150Combined heat and power CHP development at Ffaldau Waste Re-Cycling Centre, Landridnod WellsArgrivio / Powys Environmental LtdPenybont & Llandegley Community CouncilSmall Waste Incineration Plant granted planning permission granted in March 2025 with pre-operational conditions requiring of approval of ammonia scrubbing and SCR equipment to reduce impacts on the nearby ancient woodland (23/1484/FUL). This is a resubmission of planning application 22/1631/FUL which was withdrawn in April 2023. It is unclear whether or not a Schedule 13 permit application has been submitted to Powys Council for approval [Source]. The planning application references "Commercial and Industrial" waste, RDF, and biomass as potential feedstocks. (Entry updated 2025-11-13)
CLICK HERE FOR MORE DETAILS
SOUTH WALES, WALES
Potential 220,000+Newport Alexandra Dock, NewportVital EnergiContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning permission granted by Newport City Council in 2011 (10/1238) and subsequently varied multiple times. Variation 19/0599 granted in September 2019 states that the facility will "process biomass, wastes and residue feedstock" but the precise technology, which could be some form of gasification, has yet to be announced. It was reported in January 2020 that Andusia would be the "sole waste supplier" of around 220,000tpa of RDF a year to an unspecified incinerator under construction at Alexandra Docks, [Source]. In January 2022 it was reported that the facility was "12 months away from accepting waste" and that once constructed the plant would be operated by Harris Pye [Source]. In April 2023 it was reported that this project was 'paused' and in administration [Source]. In June 2023 it was reported that the abandoned project might be bought be bought up to be restarted or might be sold as scrap [Source]. In May 2024 it was reported that Vital Energy had purchased the facility from insolvency practitioners FRP who were acting on behalf of Aviva investors as part of a £1m deal, with Vital announcing that they were "now developing options for construction of an EfW plant on the site" - it was also reported that Vital would need to apply for a permit if they wished to operate an incinerator on the site [Source]. (Entry updated 2024-06-03)
CLICK HERE FOR MORE DETAILS
STOKE ON TRENT, WEST MIDLANDS
Potential 290,000Replace Stoke incinerator, site of the current Stoke Energy from Waste Facility, Campbell Road, Sideway, Stoke-on-TrentNorth Midlands Operations Ltd (NMOL) and/or a third partyContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.The Stoke-on-Trent City Council Energy Strategy published in July 2023 states that: "the facility is approaching the end of its planned lifespan and is due for replacement in the next decade. This presents an opportunity to redevelop the incinerator into a more efficient energy generation facility" [Source]. It was previously reported that the existing Stoke incinerator is due to reach end of life by around 2025, with replacement under consideration with procurement due to start in 2023 to potentially be operational by 2028 [Source]. In February 2026 it was reported that Stoke-on-Trent City Council was progressing towards procuring a replacement incinerator with a capacity of 230,000 tpa - 290,000 tpa which could become operational in 2032 [Source, Source]. The plans were consuted on between May and June 2026, with Stoke Council stating: "We will carefully consider any comments we receive during the consultation period and we'll publish a Statement of Community Involvement, which will include details of how the feedback has shaped the proposals and our responses to the key points raised" [Source]. (Entry updated 2026-06-30)
CLICK HERE FOR MORE DETAILS
TELFORD AND WREKIN, WEST MIDLANDS
Potential 25,500Green Energy Facility / "Halesfield EfW", Site 2, Halesfield 21, HalesfieldContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning permission approved in September 2021. Intended to treat pre-pared RDF (TWC/2021/0552). According to the planning application: "This fuel will be fired in a Rotary Kiln furnace from which the flue gases will go into a steam boiler". According to the April 2023 REPD database the plant had yet to enter construction. (Entry updated 2023-05-25)
CLICK HERE FOR MORE DETAILS
WALSALL, WEST MIDLANDS
Potential 478,300The WandE / "Walsall Energy From Waste Facility", Land off Fryers RoadEncyclisContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.The project started as a proposal for a gasification-type incinerator intended to burn mixed municipal commercial, industrial and municipal waste [Source]. Initial planning application approved in January 2009 and revised planning application approved in September 2013 (re 13/0725/WA) [Source]. Allocated Round One Contracts for Difference funding in February 2015 [Source]. The planning permission was varied in November 2015 and this included an increases stack height (15/1157). Planning application 19/1172 was registered by submitted to Walsall Council in September 2019 and on the 28th of May 2020 the Planning Committee voted in favour of planning consent [Source]. In June 2020 an application was made to vary the permit to change the technology to conventional incineration and to increase the maximum capacity to around 478,300 tonnes per annum [EPR/AP3832WS/V002]. In January 2024 it was reported that the West Midlands Combined Authority offered support for a district heating scheme [Source]. In November 2024 it was reported that the plant had moved from two to one lines, that construction was under way, and that the project as on track to be completed in 2026 [Source]. In May 2025 Enyclis announced "the start of full-scale construction" and stated that the facility was "due to begin operations in 2027" [Source]. (Entry updated 2025-07-31)
CLICK HERE FOR MORE DETAILS
WORCESTERSHIRE, WEST MIDLANDS
Potential 75,000Kidderminster Energy Park, Next to Liberty Aluminium, Stourport Road, KidderminsterPower Generation East Midlands / Bio Global IndustriesWyre Forest Against Incineration (see Facebook group)Incinerator announced in May 2020 to treat commercial and industrial waste. Planning appication submitted to Worcestershire County Council in August 2020 and approved in September 2021 (20/000034/CM). In May 2024 the Environment Agency did not include this facility in their list of plants that had a permit or outstanding permit application. Various planning conditions were discharged in 2024. In December 2025 it was reported that construction had begun on the site, including "the access road to the site and vegetation being cut back", but there has been no announcement that it has entered full construction [Source]. (Entry updated 2026-01-16)
CLICK HERE FOR MORE DETAILS
Potential UnknownHanley Swan Waste Incinerator, Hangmans Lane, Hanley CastleMr. Peter StylesContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Incinerator built in 1970s and shut down in 1995. Certificate of lawful use issued in on appeal in October 2016 (appeal ref APP/E1855/X/16/3147848). The site may be developed for housing rather than re-opening or replacing the disused incinerator. It was stated by a representative of Mr Styles in October 2016 that: "Mr Styles is in conversation with a couple of parties who are interested in reopening as some sort of incinerator" [Source]. If the site were to be brought back into use as an incinerator then the operator would need to apply for a new environmental permit. No sign of progress as of August 2023. (Entry updated 2023-08-31)
CLICK HERE FOR MORE DETAILS
BARNSLEY, YORKSHIRE AND THE HUMBER
Potential 145,000Land off Houghton Main Colliery Roundabout, Park Spring Road, Little HoughtonGrid Powr (UK) LtdContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.In September 2023 a permit application was advertised to treat 145ktpa of RDF through gasification (EPR/BP3325SA/A001). Barnsley Metropolitan Borough Council refused planning permission for the initial iteration of the scheme in November 2014 (2014/0559) but an amended scheme was approved in February 2015 for a gasiifcation plant to treat "up to 150,000 tonnes per annum of waste wood and virgin timber through a gasification process" (2015/0137). The scheme was the ammended in 2018 to increase the capacity to 260,000 tonnes per annum and to switch the feedstock to RDF and waste wood (2018/1437). In 2019 a planning conditions were discharged and varied in 2019 (2019/0573 and 2019/0941), including a variation to allow alterations to the design, scale and layout. Permit EPR/BP3325SA issued in August 2024. The Applicant stated in their Planning Statement for application 2019/0941 (for the Variation of Condition 1 of application 2018/1437) to allow alterations to the design, scale and layout of the Renewable Energy Park that: "Commencement of development was implemented on 26 June 18". (Entry updated 2025-03-05)
CLICK HERE FOR MORE DETAILS
DONCASTER, YORKSHIRE AND THE HUMBER
Potential 350,000Land Off Sandall Stones Road, Kirk SandallLow Carbon (previously BH EnergyGap (Doncaster) Ltd)Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Permit issued in September 2021 (EPR/SP3904SR). Planning application 20/01774/TIPA was granted planning permission in August 2022. Earlier planning application submitted to Doncaster Council in August 2020 for a conventional incinerator to treat C&I and/or municipal waste (ref 19/00954/CPL). In December 2020 it was reported that "BH Energy Gap (Doncaster) Ltd has applied to the Environment Agency for a permit" and that "Energy bosses said it would [use] 'advanced thermal treatment technology'" [Source]. According to the August 2020 non-technical summary for the permit application the proposal appears to be for a conventional moving grate incineration, with the "advanced" claim seemingly being a reference to what the permit application describes as the intention to "incorporate the latest advances in control and instrumentation technology" (EPR/SP3904SR/A001). The non-technical summary states that while the nominal capacity is 301ktpa the facility could potentially treat up to around 384ktpa depending on the calorific value of the feedstock [Source], and the permit lists a maximum throughput of 426,612 tpa. In July 2009 (ref 09/00246/TIPA) planning permission was issued for a "Proposed energy recovery facility involving gasification of (household and commercial) waste". A different gasification proposal on the site was approved in May 2018 (17/00923/TIPA), but in May 2019 the Council refused to issue a certificate of lawfulness to operate the site with conventional incineration technology (19/00954/CPL). ENDS reported in December 2024 that this project had yet to reach financial close [Source]. In December 2025 it was reproted that CVC DIF would be refinancing the project's debt through DIF Infrastructure VIII "and is expected to close during the fourth quarter of 2025, subject to customary closing conditions", creating a new partnership alongside MassMutual. [Source]. (Entry updated 2025-12-09)
CLICK HERE FOR MORE DETAILS
HULL, YORKSHIRE AND THE HUMBER
Potential 48,000Saltend Chemicals Park, Saltend Lane, HullStandard Gas / PX GroupContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.In November 2023 it was reported that Standard Gas intends to install a pyrolysis plant at the Saltend Chemicals Park under an agreement with the site's owner and operator PX Group [Source]. The press release suggests that the plant would produce "gas for industrial use" (alongside biochar) and states that: "Product gas can be used in electricity or steam and heat generation, as a natural gas substitute, or further processed for renewable transport fuels, or chemical feedstock" [Source]. As such, the plant is different to close-couple ATT plants that immediately burn the gas produced to produce electricity and/or heat. (Entry updated 2023-11-29)
CLICK HERE FOR MORE DETAILS
LEEDS, YORKSHIRE AND THE HUMBER
Potential 24,000Knowsthorpe Way, Cross GreenSkelton Waste DisposalContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Small waste incineration plant (SWIP) using Fluidised Bed Combustion to treat RDF was granted planning permission in December 2023 (23/04970/FU) and varied in April 2024 (24/01127/FU). According to the original planning application: "The plant would be fuelled by a maximum 24,000 tonnes of Refuse Derived Fuel (RDF), manufactured at the applicants existing operations at the adjacent Waste Transfer Station". It appears that the site has yet to obtain it SWIP permit from Leeds council [See permits]. In 2025 planning permission was amended because the plant was proposed to be moved to a different part of the wider waste site (24/06068/FU). (Entry updated 2026-01-16)
CLICK HERE FOR MORE DETAILS
NORTH EAST LINCOLNSHIRE, YORKSHIRE AND THE HUMBER
Potential 676,000North Beck Energy Centre / "Centre from Refuse Derived Fuel", Queens Rd, ImminghamNorth Beck EnergyContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning application for a 30-year incinerator to take municipal and commercial waste in the form or RDF submitted in January 2018 for land owned by Able UK Ltd [Source]. Planning permission granted by NE LincS Council in October 2018 (DM/0026/18/FUL, Source). It appears to be a conventional waste incinerator. In November 2018 a consultation was announced for an environmental pemit (EA ref EPR/BP3739QT/A001). Permit issued in September 2021 [Source]. Planning application to discharge Conditions 4 and 17 validated in July 2023 (DM/0687/23/CND). It was reported in May 2023 that North Beck Energy Ltd was looking for a contractor to build the incinerator [Source]. In November 2022 the operator "elected to defer permit review" and in October 2023 a permit variation was issued requiring a report to be submitted by the operator showing compliance with the updated BAT Conclusions before the incinerator can be operated. In May 2024 the Environment Agency listed the facility status as "construction not started". In July 2025, North East Lincolnshire Council stated in a Scrutiny Panl report that: "A 24-acre site owned by Able UK. Approximately ten acres has potential to see a 25MW waste to energy plant developed by North Beck Energy which gained planning permission in 2018. The project has seen some challenges in securing the necessary funding, but all planning conditions were discharged in 2023...The remainder of the site is being actively marketed by the landowners" [Source]. (Entry updated 2026-01-16)
CLICK HERE FOR MORE DETAILS
Potential 753,500 (RDF)South Humber Bank Energy Centre, South Humber Bank Power Station, South Marsh Road, Stallingborough, GrimsbyEP UK Investments (EPUKI)Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.A Development Consent Order for the larger version of the scheme was issued in November 2021 [Source]. The scheme was announced in August 2018 [Source, Source]. Planning permission was granted for the facility to operate up to 49.9MWe in April 2019 [Source]. According to the National Infrastructure Planning website the application for operation above 50MWe was submitted in April 2020 and approved for examination in May 2020 with examination hearings due to start in February 2021 [See NIP page for the project]. According to the Scoping Opinion: "The design capacity is 616,500 tonnes of RDF per annum rising to a maximum of 753,500 tonnes, depending on the net calorific value of the RDF" [Source]. It appears that the proposal intends to use conventional incineration to treat Refuse Derived Fuels. An environmental permit variation was granted in May 2020 (ref EPR/MP3235LY/V009). In May 2024 the Environment Agency listed the facility status as "construction not started". (Entry updated 2024-05-13)
CLICK HERE FOR MORE DETAILS
Potential 600,000Waste to Sustainable Transport Fuels Plant, Portlink 180, Hobson Way, Stallingborough, GrimsbyAltalto Immingham Ltd / VelocysContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning application submitted in July 2019 and approved in June 2022 for a 600,000 waste to fuel plant (DM/0664/19/FUL). According to the Planning statement, approx 600ktpa is shredded and dried on-site to produce c. 375ktpa of SRF for the "steam reforming gasification" process. The Planning Statement also notes that the Fischer Tropsch process is intended to be used to convert the syngas into Synthetic Paraffinic Kerosene (SPK) and Naphtha to be turned into transport fuels. In December 2022 this project £27m from the Advanced Fuels Fund (AFF) and that the plant was expected to produce "produce 37.4kt/y of SAF when at full operational capacity" [Source, Source]. It was reported in April 2022 that Velocys "had completed site engineering, a geotechnical survey, and the integration of carbon sequestration of biogenic CO2" [Source]. (Entry updated 2023-01-16)
CLICK HERE FOR MORE DETAILS
Potential 226,000 (RDF)Alpha Grimsby Renewable Energy Centre, Vireol Plc, Energy Park Way, GrimsbySynpower / Alpha Grimsby LtdContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning permission granted in January 2019 by North East Lincolnshire Council (DM/0329/18/FUL) for 170-200ktpa and then varied in July 2021 to increase the throughput to 226ktpa tpa of RDF (DM/0667/20/FUL). In May 2024 the Environment Agency did not include this facility in their list of plants that had a permit or outstanding permit application. In May 2024 it was reported by ENDS that this facility was "thought to be close to making financial close" [Source]. In April 2025 planning permission was varied to increase the overall height of the building (DM/0574/24/FUL). (Entry updated 2026-01-16)
CLICK HERE FOR MORE DETAILS
Potential 350,400 (RDF)Immingham Energy from Waste, Netherlands Way, Stallingborough, GrimsbyTEGCO Immingham LtdContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Proposed conventional RDF incinerator granted planning permission in 2018 by North East Lincolnshire council (DM/0628/18/FUL), with Section 73 variations granted in 2022 and 2023. Intended to replace existing CHP plant on adjacent industrial lane. Has yet to enter construction, but development might have technically commenced for planning purposes. Permit issued in December 2024 (EPR/RP3628SJ/A001). (Entry updated 2025-07-31)
CLICK HERE FOR MORE DETAILS
Potential 25,000Land At Great Coates Business Park, Humber Gate, Stallingborough, GrimsbyUnstated prospective applicantContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.High-temperature incinerator for specialist waste. Scoping report submitted to North East Lincolnshire Council in April 2024 states: "The thermal treatment plant would manage a diverse range of wastes from commercial and industrial processes, manufacturing, maintenance activities, education, research and development, provision of healthcare services, law enforcement, and agricultural activities, which require high temperature destruction and disposal" (DM/0423/24/SCO). According to the Scoping Report, the plant would be classified as a waste incinerator for regulatory purposes. The local newspaper notes that the applicant is unstated. [Source]. The metadata for the scoping report mentions 'GRG', which could be a reference to GRG Waste UK, but this has not been confirmed. (Entry updated 2024-07-01)
CLICK HERE FOR MORE DETAILS
NORTH LINCOLNSHIRE, YORKSHIRE AND THE HUMBER
Potential 650,000 - 760,000 (RDF)North Lincolnshire Green Energy Park, Flixborough Wharf, Flixborough Industrial EstateNorth Lincolnshire Green Energy Park Limited / Solar 21Residents Against Trent IncineratorsPlanning permission granted by Head of Energy Infrastructure Planning Delivery at DESNZ on 13th March 2025 despite Examining Authority recommendation for refusal (see NSIP page for application EN010116). Development Consent Order requires at least 50% or 350,000 tpa of waste (whichever of the two i the lower) to be sourced from the East Midlands. The applicant indiates that waste could also be sourced from a "good proportion" of the East of England region which is within the 100-mile catchment area for the plant. (Entry updated 2025-05-30)
CLICK HERE FOR MORE DETAILS
NORTH YORKSHIRE, YORKSHIRE AND THE HUMBER
Potential 130,000Knapton Green Energy Facility, Landfill Site Knapton Quarry, East Knapton, MaltonKnapton Green Energy, Tetragen and NCG Estates.Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning permission was granted in 2018 for a 65ktpa gasification plant (NY/2016/0194/ENV). In 2016 this project was promoted as diverting waste from incineration and as "more efficient" than incineration, with the company behind the scheme stating "It is important to note that this is not incineration" [Source]. The description of the technnology was changed in April 2019 to remove the reference to gasification (NY/2019/0038/NMT), and it seems possible that the plant will therefore ultimately use conventional incineration (although this has not been confirmed). In March 2021 planning permission was granted for an increase in capacity to 130ktpa (NY/2019/0078/73) for a non-gasification incinerator. According to the October 2020 GHG Assessment, the plant would treat prepared RDF and 54% of the carbon that of the waste intended to be used as feedstock would be from fossil sources such as plastic. It was reported in January 2024 that "A consented energy-from-waste project in Yorkshire - currently owned by Tetragen Knapton UK Limited (TKL) - has been put up for sale. Redbourn Capital has confirmed to EWB it is marketing 100% of TKL.." despite the fact that a permit had yet to be applied for with respect to this facility [Source]. (Entry updated 2024-01-25)
CLICK HERE FOR MORE DETAILS
Potential 240,000 (RDF and mixed waste)Selby Energy Recovery Plant, Aviation Road, Sherburn in ElmetEnergy Ventures No1 LtdSherburn-in-Elmet Parish Council. Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning permission 2016/1456/EIA for a conventional RDF and mixed waste incinerator techinically commenced in June 2020 to preserve the planning permission, but in In October 2025 planning permission was varied (ZG2025/0107/S73) to help make way for construction to actually commence. Permit application EPR/AP3526LV/A002, was submitted with documents dated August 2025, and a consultation ran between January 2026 and March 2026 [See consultation page], and the EA stated on 11 May 2026 that it was "currently in the application review stage". Planning history: The scheme is modified from the original application made in December 2016 for RDF gasification plant (ref 2016/1456/EIA) using a feedstock "sourced from recycling centres from outside of the Sherburn Industrial Estate" which was granted in October 2016. Some planning conditions were discharged by Selby District Council in 2020 (2020/0276/DOC) and a Section 73 application to vary conditions was approved in 2021 to increase the capacity to from 200ktpa to 240ktpa and changed the technology from "gasification" to "grate" technology (2021/1402/S73). (Entry updated 2026-06-30)
CLICK HERE FOR MORE DETAILS
Potential 350,000Southmoor Energy Centre, Kellingley Colliery, Weeland Road (near Knottingley)Peel Environmental / Harworth Estates (HEPGL) / Southmoor Energy Centre LimitedContact coordinator@ukwin.org.uk to be put in touch with those opposing this development.Planning application for an incinerator submitted in May 2013 (planning application NY/2013/0128/ENV), and planning consent was issued February 2016. Peel stated in 2013: "It will use up to 280,000 tonnes per year of non-hazardous residual waste including industrial, commercial and possibly household from across the region" [Source]. Peel announced in March 2019 that "Plans...are progressing, with the company expecting to be on site in Autumn 2019" and stated that: "Peel Environmental is proposing to make some changes to the existing planning permission, one of which is to increase the fuel for the facility from 280,000 tonnes to 350,000 tonnes per year" and that "A Section 73 planning application to amend the plans has been submitted to NYCC [North Yorkshire County Council] and is expected to be considered in Summer 2019" [Source]. Environmental Permit issued in October 2019 (EPR/FP3437QL/A001). A proposal to vary the planning consent (NY/2019/0005/73) was registered in January 2019 and granted in February 2020. Permit varied in November 2023 following a BAT review (EPR/FP3437QL/V002). (Entry updated 2024-08-14)
CLICK HERE FOR MORE DETAILS
WEST YORKSHIRE, YORKSHIRE AND THE HUMBER
Potential 148,000Land East Of Former Gas Works, Airedale Road, KeighleyHalton Group / JO Steel / Endless EnergyAire Valley Against Incineration (Facebook group, Website)Moving grate incinerator intended to burn RDF was granted planning permission in April 2014 (ref. 13/04217/FUL). The applicant did not appeal an August 2015 refusal to alter the planning consent (15/01381/FUL), but in November/December 2015 continued towards implementing the original planning consent by applying for non-material amendments and to discharge planning conditions (13/04217/NMA02 & 13/04217/SUB01) [Source]. These amendments/dischargements were subsequently approved [Source]. In August 2016 a new application was submitted for the plants anf these this was approved in February 2017 (Ref 16/06857/FUL). Environmental permit issued by the Environment Agency in December 2020 (EPR/ZP3537AT). In May 2024 it was reported by ENDS that this facility was "thought to be close to making financial close" [Source]. (Entry updated 2024-06-03)
CLICK HERE FOR MORE DETAILS

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.