Menu Close

Incinerator information library

Information for Levenseat 2, By Forth, Lanark

Status: Prevented
Planning Region: Scotland
Planning Sub-Region: South Lanarkshire
Operator: Levenseat Limited
Capacity: 315,000
Campaign Group(s): Friends of the Earth Scotland
Notes: Planning permission granted in April 2017 for "an advanced thermal treatment process that will thermally treat refuse derived fuel (RDF) using gasification technology". As of mid-March 2024 it appears that no permit has been obtained for this facility and that construction had yet to commence. Planning permission granted in April 2017 for "an advanced thermal treatment process that will thermally treat refuse derived fuel (RDF) using gasification technology". As of mid-March 2024 it appears that no permit has been obtained for this facility and that construction had yet to commence. In April 2024 SEPA informed UKWIN that there is "...currently an active PPC Part A permit at this site (Ref no. PPC/A/1150156) that allows incineration of prescribed materials. The operator submitted an application to vary the permit on 14/12/2023. The application is in the process of being determined and when complete, SEPA will decide whether a to issue a variation to the permit". See public register for permit documents. In March 2026, Levenseat Resource Management confirmed that they had "no current plans" to develop Levenseat Phase Two [Source]. (Entry updated 2026-04-22)

APR Summary 2025

Details taken or derived from the Annual Performance Report submitted by the operator

Permit: PPC-A-1150156

EntryValueNotes
Plant Size TPA131,000.00Gladsmuir Resource Recovery
Plant Size MWth46.00
Plant Size MWe11.00
Power Generated Year Total10,744.93
Power Generated kWh per tonne904.03
Power Exported Year Total7,925.52
Power Exported kWh per tonne666.81
Power Imported Year Total3,166.39
Power Imported kWh per tonne266.40
Parasitic Load Year Total0.43
Thermal Energy Exported Year Total0.00
Total Waste Received Year Total21,361.02
Total Waste Combusted Year Total11,885.65Household / Local Authority (74.73%)
NCV Year Total12.84
Permit Breaches Year Total8.00
Annual CO2 Mass15,240.10CEMS data.
Annual CO2 Mass Per Tonne1.28
Annual CO2 Mass Per Mwh1.92
Annual N2O Mass0.69CEMS data.
Total CO2 N2O15,421.84
Biogenic CO2 Percentage0.56Biomass Content by CV (Selective Dissolution) - from RDF samples.
Biogenic Percentage NCV0.56Biomass Content by CV (Selective Dissolution) - from RDF samples.

Planning Consent files:

317-PlanningConsent-2017.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.