Information for Heysham Energy Recovery Facility, Heysham Gateway, Imperial Road, Lancaster West Business Park

Status: Prevented
Planning Region: North West
Planning Sub-Region: Lancashire
Operator: Veolia
Capacity: 330,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Planning application submitted in March 2019 and approved in October 2019 (LCC/2019/0021). In September 2019 Veolia applied for an Environmental permit and this was issued in May 2020 (EPR/VP3437QR/A001). Proposals announced in November 2018 for an incinerator that is proposed to treat household and similar business waste arising in Lancashire. In March 2023 it was reported that progress had stalled and that construction had yet to commence [Source] and that according to Lancashire County Council planning permission had "expired with work not implemented" [Source]. It was reported in February 2024 that Veolia "pulled the plug" on this project and surrendered their environmental permit [Source]. (Entry updated 2024-04-30)

R1 status of incinerators - 8 April 2026 (Environment Agency)

Uses data from R1 status of incinerators in England released by the Environment Agency. © Environment Agency copyright and/or database right 2026. All rights reserved.

Permit: VP3437QR

OperatorInstallation nameInstallation addressPermit statusWaste input (000s tonnes per annum)Incinerator typeCalculated R1 valueApplication R1 status grantedSource of data used in R1 calculationsDate R1 application status granted
Veolia ES (UK) LimitedHeysham Gateway EFWImperial Road, Middleton Business Park, Middleton, LancashireIn determination350Municipal waste0.88YesDesign02/10/2019

Permit files:

82-Permit-2020.pdf

Permit Decision files:

82-PermitDecision-2020.pdf

Surrender Letter files:

82-SurrenderLetter-2024.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.