Menu Close

Incinerator information library

Information for Longridge Road Energy Centre, Red Scar Industrial Estate, Ribbleton, Preston

Status: Prevented
Planning Region: North West
Planning Sub-Region: Lancashire
Operator: Miller Turner Group
Capacity: 395,000
Campaign Group(s): Residents Against Longridge Road Energy Centre (Facebook group, Twitter)
Notes: Planning application granted with an R1 condition for a conventional moving grant incinerator in November 2019 (LCC/2019/0029). Intended to treat both mixed waste and RDF. Lancashire County Council stated in March 2022 that: "Some works to commence the development are due to start in summer 2022 with the main construction works to follow once the remainder of the planning condition requirements have been addressed". According to the October 2021 REPD, planning permission expired in November 2022 however planning application LCC/2019/0029NM1 appears to have allowed construction to commence prior to the pre-commencement conditions having been met in order to prevent the permission from technically expiring [Source]. In April 2024, the Environment Agency confirmed to local campaigners that no application for an environmental permit had been received for this facility. In May 2024 the Environment Agency did not include this facility in their list of plants that had a permit or outstanding permit application. In November 2025 a liquidator was appointed to wind up Miller Turner Group (UK) Ltd [Source] (Entry updated 2026-01-16)

Plume Plotter entry for Preston


This pollution prediction was produced by Plume Plotter. Click here for more details.

Planning Consent files:

81-PlanningConsent-2019.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.