Information for Graythorp Energy Centre, Land to the South of Tofts Road, West Graythorp

Status: Potential
Planning Region: North East
Planning Sub-Region: Hartlepool
Operator: Graythorp Energy Ltd
Capacity: 560,000 (RDF)
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Incinerator proposed to treat "dry household and industrial waste" [Source]. Hartlepool Borough Council voted to approve planning permission H/2019/0275 in July 2020. No sign of an environmnetal permit application as of 8th March 2021. (Entry updated 2021-03-08)

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.