Incinerator information library

Information for Derby Alternative Energy Plant, Victory Road, Sinfin

Status: Prevented
Planning Region: East Midlands
Planning Sub-Region: Derby
Operator: Clean Electricity Generation (CEG) who are funded by Momentum Capital and Transformative Energy and Materials Capital (TEM Capital)
Capacity: 30,000
Campaign Group(s): Derby FoE and Sinfin and Spondon Against INcineration (SSAIN)
Notes: In January 2023 the operator "elected to defer permit review" and in October 2023 a permit variation was issued to CEG Technology UK for the Derby Alternative Energy Plant requiring a report to be submitted showing compliance with the updated BAT Conclusions before the incinerator can be operated. A "full scale demonstration plant" was built which uses "Proprietary Torrefaction Reactor Technology" to use generate syngas from biomass which is burned in a gas engine to supposedly generate electricity and "Torrefied Pellets" [Source, Source]. According to the operator, "Torrefaction is thermal treatment of biomass in an environment with low oxygen content" [Source]. The permit was surrendered in August 2024. (Entry updated 2024-09-02)

Waste management for England 2024: Pre-operational (Environment Agency)

Uses data from 2024 Waste Data Interrogator - Version 2 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: FP3739VA

Operator NameSite NameSite AddressFormer Planning RegionFormer Planning Sub-RegionTypePermitted Capacity (tonnes)
Clean Electricity Generation LtdDerby Alternative Energy PlantUnit 1 Victory Road Business Park,Victory Road,DERBY,Derbyshire DE24 8EJEast MidlandsDerbyshireBiomass / Waste wood30,000

Waste management for England 2023: Waste removed

Uses data from 2023 Waste Data Interrogator - Version 1 released by the Environment Agency under the Environment Agency Conditional Licence. © Environment Agency copyright

Permit: FP3739VA

Recorded Destination: Derbyshire

Destination WPA: Derbyshire

Destination Region: East Midlands

Fate: Recovery

EWC Sub ChapterEWC Waste DescWaste CodeR and D codeSOC CategorySOC Sub CategoryTonnes Removed
Separately collected fractions (except 15 01)metals20 01 40R0406 - Metallic wastesMixed metal wastes43.26
Mechanical treatment of waste (for example sorting - crushing - compacting - pelletising) not otherwise specifiedferrous metal19 12 02R0406 - Metallic wastesFerrous metal waste and scrap15.17
Metals (including their alloys)iron and steel17 04 05R0406 - Metallic wastesFerrous metal waste and scrap14.26
Soil (including excavated soil from contaminated sites) - stones and dredging spoilsoil and stones other than those mentioned in 17 05 0317 05 04R0312 - Mineral wastesNaturally occurring minerals7.38
Other construction and demolition wastesmixed construction and demolition wastes other than those mentioned in 17 09 01, 17 09 02 and 17 09 0317 09 04R0512 - Mineral wastesConstruction and demolition wastes6.05
Wood - glass and plasticwood17 02 01R0307 - Non-metallic wastesWood wastes4.9
Other municipal wastesmixed municipal waste20 03 01R0510 - Mixed ordinary wastesHousehold and similar wastes4.46
Gypsum-based construction materialgypsum-based construction materials other than those mentioned in 17 08 0117 08 02R0312 - Mineral wastesConstruction and demolition wastes1
Metals (including their alloys)copper, bronze, brass17 04 01R0406 - Metallic wastesNon-ferrous metal waste and scrap0.43

Permit Surrender Decision files:

8-PermitSurrenderDecision-2024.pdf

Permit Surrender Letter files:

8-PermitSurrenderLetter-2024.pdf

Permit Variation files:

8-PermitVariation-2023.pdf

Environment Agency Compliance Assessment Reports

Click here to see the incinerator compliance documents for existing English incinerators

Standard notice:

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in biomass incinerators (including waste wood plants) over 20MW then please see the Biofuelwatch map of UK Biomass Power Stations. Those concerned about biomass plants, including waste wood plants, should email Biofuelwatch at biofuelwatch[at]gmail.com.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.