Incinerator information library

Information for Marlpit Lane, Hambrook (Near South Downs National Park)

Status: Prevented
Planning Region: South East
Planning Sub-Region: West Sussex
Operator: ABS Power Limited (Director: Adam Barton)
Capacity: 15,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: It was reported in February 2014 that West Sussex County Council confirmed that this proposal will not be pursued by the applicant beyond the pre-application discussion stage [Source]. Environmental Statement scoping opinion requested in December 2013 for the then proposed waste wood biomass gasification-type incinerator with waste intended to come from construction and demolition and civic amenity sites [Source] (Ref: 13/04018/EIA). (Entry updated 2014-02-20)

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.