Incinerator information library

Information for Enviropower Energy from Waste / "Lancing Combustion Plant", Unit 2, Chartwell Road, Churchill Industrial Estate, Lancing

Status: Existing
Planning Region: South East
Planning Sub-Region: West Sussex
Operator: Rabbit Waste Management (formed of a merger between Sussex Waste Recycling and Enviropower) and potentially Biomass Power Ltd
Capacity: 60,350
Campaign Group(s): ?
Notes: Primarily used for Construction & Demolition waste from the Waste Transfer Station operated by Rabbit Waste Management Ltd, but could also take trade waste and skip waste collected by Rabbit. In June 2017 it was reported that a fire burnt "over 500 tonnes of wood chippings being stored ahead of incineration" []Source]. Permit number XP3030XX. (Entry updated 2019-06-06)

Waste management for England 2018: Operational (Environment Agency)

Uses data from Waste Data Interrogator 2018 - 2018 Waste Summary Tables for England - Version 2 released by the Environment Agency under the Open Government License

PermitDate PermittedOperator NameSite NameSite AddressFormer Planning RegionFormer Planning Sub-RegionEA AreaTypePermitted Capacity (tonnage)Tonnage Incinerated in 2006Tonnage Incinerated in 2007Tonnage Incinerated in 2008Tonnage Incinerated in 2009Tonnage Incinerated in 2010Tonnage Incinerated in 2011Tonnage Incinerated in 2012Tonnage Incinerated in 2013Tonnage Incinerated in 2014Tonnage Incinerated in 2015Tonnage Incinerated in 2016Tonnage Incinerated in 2017Tonnage Incinerated in 2018Comment
XP3030XX10/12/2007Enviropower LimitedLancing Combustion PlantUnit 2,Chartwell Road,Churchill Industrial Estate,Lancing,West Sussex BN15 8TUSouth EastWest SussexSolent and South DownsMunicipal and/or Industrial & Commercial60,350-----61,48060,31160,26857,27660,01159005 33280 59,629

Environment Agency 2018 Pollution Inventory: Substances

Uses data from the Pollution Inventory 2018 released by the Environment Agency under a special license

PermitEA AREA NAMEROUTE NAMESUBSTANCE NAMEREPORTING THRESHOLD (kg)QUANTITY RELEASED (kg)REGULATED INDUSTRY SECTORREGULATED INDUSTRY SUB SECTOR
XP3030XXSolent and South DownsAirArsenic12.06EfWEfW
XP3030XXSolent and South DownsAirParticulate matter - PM101.00E+032,567.00EfWEfW
XP3030XXSolent and South DownsAirDioxins and furans (PCDDs/PCDFs) - as ITEQ0.000010EfWEfW
XP3030XXSolent and South DownsAirParticulate matter - PM2.510002,567.00EfWEfW

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php?title=Lancing_EfW

Annual Performance Report files:

140-AnnualPerformanceReport-2018.pdf
140-AnnualPerformanceReport-2019.pdf

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.