Menu Close

Incinerator information library

Information for Granville Landfill Site, Grange Lane, Redhill, Telford

Status: Prevented
Planning Region: West Midlands
Planning Sub-Region: Telford and Wrekin
Operator: Suez Environment (formerly SITA) with Cyclerval UK (TIRU)
Capacity: 62,000
Campaign Group(s): Telford Protest Against Incinerator Now (TelfordPAIN) and Telford Friends of the Earth and Safe Waste Shropshire
Notes: Planning permission was refused in December 2009, when the Head of Planning recommended refusal and "all eight members of the Plans Board voted to reject Sita’s Granville incinerator proposal" [source]. (Entry updated 2011-06-30)

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.