Information for Land At Keypoint, Thornhill Road, South Marston

Status: Potential
Planning Region: South West
Planning Sub-Region: Swindon
Operator: Rolton Kilbride / Legal & General Properties
Capacity: 150,000 (RDF+)
Campaign Group(s): Stop Keypoint Incinerator Project (SKIP)
Notes: Planning permission granted on appeal in June 2019 with both R1 and climate change planning conditions. Originally proposed to use ENERGOS gasification technology, but at appeal the prospect of using Japanese gasification technology was raised (Source). Planning application submitted in June 2016 [S/16/1055] and refused in September 2017 [Source] and subsequently appealed in February 2018 (Appeal Ref. 3197964). Not to be confused with the Honda plant at the same industrial estate. (Entry updated 2019-06-07)

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.