Information for Clarion Close, Swansea Enterprise Park

Status: Potential
Planning Region: Wales
Planning Sub-Region: Swansea
Operator: Biffa
Capacity: 21,000
Campaign Group(s): Swansea Friends of the Earth (Swansea FoE Facebook)
Notes: In September 2018 (ref 2018/2059/FUL) a planning application was submitted to Swansea Council for a "small scale waste to energy recovery facility including extension to existing building, external plant, associated structures and 25m chimney stack". The planning application was refused by the planing committee in May 2019, and it was reported in November 2019 had appealed the refusal [Source] (Entry updated 2020-01-06)

Plume Plotter entry for Swansea


This pollution prediction was produced by Plume Plotter. Click here for more details.

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.