Information for Shepperton Eco Park, Charlton Lane, Shepperton

Status: Existing
Planning Region: South East
Planning Sub-Region: Surrey
Operator: Suez Environnement (formerly SITA)
Capacity: 60,000
Campaign Group(s): Spelthorne Against The Eco-Park (SATEP) and Capel Action Group
Notes: Listed as under construction as of May 2015 in BEIS database [Source]. In June 2018 it was reported that comissioning was due to begin late Summer 2018 [Source]. Planning permission granted in August 2014 (ref SP13/01553/SCC, and amended proposal approved September 2014 [Source, Source]. It was reported in July 2013 that planning permission was being sought for an RDF-fed fluidised-bed gasification-type incinerator [Source, Source]. New technology supplier chosen as Ascot Environmental were forced into administration on the 18th of May 2012, rendering the previous planning consent and contract out of date [Source, Source]. A series of amendments were approved in March 2017 (ref: SP13/01153/SCA1). (Entry updated 2018-07-26)

Plume Plotter entry for Shepperton_ge


This pollution prediction was produced by Plume Plotter. Click here for more details.