Information for Barry Energy Production Facility, David Davies Road, Woodham Road, Barry Dock

Status: Potential
Planning Region: Wales
Planning Sub-Region: South Wales
Operator: Barry Biomass / Aviva
Capacity: ~80,000
Campaign Group(s): Barry & Vale Friends of the Earth
Notes: Planning application states the faciltiy is intended to treat waste wood using Outotec fluidised-bed gasification technology. Revised outline planning application submitted in April 2015 [2015/00031/OUT] and approved in July 2015. On the same site as that which obtained planning permission in July 2010 (ref APP/Z6950/A/09/2114605). Permit no AB3790ZB [See public register] (Entry updated 2020-04-09)

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.