Menu Close

Incinerator information library

Information for LRRE, Rear of 87 Beddington Lane / 79-85 Beddington Lane

Status: Potential
Planning Region: London
Planning Sub-Region: South London
Operator: London Recycling and Renewable Energy Limited (Foresight Group LLP and potentially DRENL)
Capacity: 85,000 - 150,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Advanced Thermal Treatment facility, presumably a gasification-type incinerator, possibly to treat biomass and low-grade waste wood. Planning permission granted on 17th September 2014 (refs D2014/69228/FUL and D2014/69227/FUL) [Source]. Intended to be instead of several previous planning permissions for the area, but unrelated to the nearby Viridor proposal. As of March 2016 the Foresight Grop’s website listed the facility as having planning consent, but unlike other facilities it does not state a year by which it is due to become operational (Entry updated 2016-03-15)