Information for Riverside Energy Park, Norman Road, Belvedere (London Borough of Bexley)

Status: Potential
Planning Region: London
Planning Sub-Region: South East London
Operator: Cory
Capacity: 655,000
Campaign Group(s): Not Another Incinerator In Bexley (NAIIB) / the Greenwich-Bexley Environment Alliance
Notes: Application for an incinerator with a nominal capacity 655ktpa and a maximum throughput of 805ktpa received by the Planning Inspectorate in November 2018 under the National Infrastructure Planning regime [See NIP website]. This facility would be next to the existing Cory incinerator. The DCO was granted in April 2020 [Source], however that decision may be subject to a judicial review brought by the Mayor of London [Source]. (Entry updated 2020-05-29)

Permit files:

55-Permit-2020.pdf

Permit Decision files:

55-PermitDecision-2020.pdf

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.