Menu Close

Incinerator information library

Information for Land at former Templeborough Steel Works, Sheffield Road, Templeborough

Status: Potential
Planning Region: Yorkshire & the Humber
Planning Sub-Region: Rotherham
Operator: Rolton Kilbride / Cracknore Investment
Capacity: 215,000 (RDF)
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: ACT facility for RDF. Planning permission granted by Rotherham Metropolitan Borough Council in October 2016 (RB2016/0891). The applicant has stated that the facility would have the capacity to process feedstock including commercial and industrial waste, with an element of construction and demolotion and potentially municipal solid waste. It was anticipated that the feedstock would comprise waste from across the Rotheram and Sheffield area. It was reported that a Scoping Request was submitted in April 2016 (Source, Source). Not to be confused with the Templeborough Biomass Power Plant. (Entry updated 2019-03-13)

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.