Incinerator information library

Information for Bulwell Energy Recovery Facility, Nottingham Energy Park, Blenheim Gardens Allotments, Blenheim Lane, Bulwell

Status: Potential
Planning Region: East Midlands
Planning Sub-Region: Nottingham
Operator: Bulwell Energy Limited / Chinook Sciences
Capacity: 160,000
Campaign Group(s): Nottingham Friends of the Earth (FoE) and Nottingham Against Incineration and Landfill (NAIL)
Notes: Planning permission for 30ktpa granted in June 2013, and request for an extension to 160ktpa granted in June 2014 [Nottingham City Council planning ref 13/03051/PMFUL3]. Pyrolysis/gasification-type incinerator described as a "demonstrator plant" using RODECS® system to process MSW and C&I [Source]. Permit issued in April 2015 [ref EPR/LP3239NX/A001]. A planning condition requires the facility obtain Design-stage R1 status [Ref: P3239NX/A001]. A consolidatedpermit was issued in October 2018 [EPR/LP3239NX/V003]. The plant has yet to proceed as of February 2020. (Entry updated 2020-02-24)

Initial applications received for R1 status: 17 June 2019 (Environment Agency)

Uses data from https://ea.sharefile.com/share/view/sfc08f637d1644668 released by the Environment Agency under the Open Government License

PermitOperatorInstallation nameInstallation addressPermit statusWaste input (000s tonnes per annum)Incinerator typeCalculated R1 valueApplication R1 status grantedSource of data used in R1 calculationsDate R1 application status granted
LP3239NXBulwell Energy LimitedBulwell Energy Recovery FacilityFormer Allotments, Blenheim Lane, Nottingham, Nottinghamshire, NG6 8UR,Permit issuedApplication withdrawn
LP3239NXBulwell Energy LimitedBlenheim LaneBlenheim Lane, Bulwell in NottinghamPermit issued160Municipal waste0.7YesDesign5/12/2017

Waste management for England 2018: Non-operational (Environment Agency)

Uses data from Waste Data Interrogator 2018 - 2018 Waste Summary Tables for England - Version 2 released by the Environment Agency under the Open Government License

PermitOperator NameSite NameSite AddressFormer Planning RegionFormer Planning Sub-RegionEA AreaTypePermitted Capacity (tonnes)Comment
LP3239NXBulwell Energy LimitedBulwell Energy Recovery Facility Former Allotments,Blenheim Lane,Nottingham,Nottinghamshire NG6 8UREast MidlandsNottinghamshireDerbyshire Nottinghamshire and LeicestershireMunicipal and/or Industrial & Commercial160,000Permitted April 2015 - pre-construction

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php?title=Bulwell_Energy

Permit files:

12-Permit-2015.pdf

Permit Decision files:

12-PermitDecision-2015.pdf
12-PermitDecision-2018.pdf

Permit Variation files:

12-PermitVariation-2018.pdf

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.