Information for North Lincolnshire Green Energy Park, Flixborough Wharf, Flixborough Industrial Estate

Status: Potential
Planning Region: Yorkshire & the Humber
Planning Sub-Region: North Lincolnshire
Operator: North Lincolnshire Green Energy Park Limited / Solar 21
Capacity: 650,000 (RDF)
Campaign Group(s): Residents Against Trent Incinerators.
Notes: Plans for the incinerator were announced in May 2020 when it was stated that: "The project is classified as a Nationally Significant Infrastructure Project [NSIP] due to the amount of energy the facility will generate" [Sourrce]. According to the NSIP website the application is currently in the pre-application stage and is not expected to be submitted to the Planning Inspectorage before July 2021 [NSIP entry]. (Entry updated 2020-08-07)

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.