Menu Close

Incinerator information library

Information for Fleetwood Energy Centre, Jameson Road, Fleetwood

Status: Prevented
Planning Region: North West
Planning Sub-Region: Lancashire
Operator: Reform Energy NW Limited
Capacity: 80,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: It was reported in April 2015 that "Construction is scheduled to take place during 2015 and the plant will become operational in 2017" [Source]. Related planning permission granted in December 2016 for a variation of the scheme (ref LCC/2016/0021). No sign of progress as of February 2020, e.g. planning conditions have not been discharged and an Environmental Permit application has not been made. (Entry updated 2020-02-19)

Planning Consent files:

80-PlanningConsent-2016.pdf

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.