Information for Cleveland Street (former ADM Cocoa Plant) Dalton Street (Council Waste Depot Site) connecting to a strip of land alongside The River Hull

Status: Existing
Planning Region: Yorkshire & the Humber
Planning Sub-Region: Hull
Operator: C Spencer Ltd / Energy Works (including Bioenergy Infrastructure Group, Noy Fund, John Hancock Natural Resources)
Capacity: 250,000
Campaign Group(s): FoE Hull and EYE / CATs
Notes: Granted planning permission in October 2011 (Application reference: 11/00615/CM) for a 25 MWe Gasification plant to gasify materials including processed waste wood and Solid Recovered Fuel (SRF) produced onsite from commercial, industrial and municipal sources [Source]. It was reported in November 2015 that financial close had been reached and that construction would begin in January 2016 with the facility to be operational by 2018 [Source]. Spencer failed to win the Hull & East Riding PFI contract [Source]. Allocated Round One Contracts for Difference funding in February 2015 [Source]. Environmental permit granted in January 2016 [EPR/NP3837NV]. It was reported that hot commissioning began in April 2018 [Source]. (Entry updated 2018-06-07)

Waste management for England 2018: Non-operational (Environment Agency)

Uses data from Waste Data Interrogator 2018 - 2018 Waste Summary Tables for England - Version 2 released by the Environment Agency under the Open Government License

PermitOperator NameSite NameSite AddressFormer Planning RegionFormer Planning Sub-RegionEA AreaTypePermitted Capacity (tonnes)Comment
NP3837NVEnergy Works (Hull) LimitedHull Energy WorksHull Energy Works, Cleveland Street, Hull, East Yorkshire, HU8 8AD,Yorkshire & the HumberFormer HumbersideYorkshireMunicipal and/or Industrial & Commercial315,000Under Construction

Environment Agency 2018 Pollution Inventory: Substances

Uses data from the Pollution Inventory 2018 released by the Environment Agency under a special license

PermitEA AREA NAMEROUTE NAMESUBSTANCE NAMEREPORTING THRESHOLD (kg)QUANTITY RELEASED (kg)REGULATED INDUSTRY SECTORREGULATED INDUSTRY SUB SECTOR
NP3837NVYorkshireAirAmmonia10000.17EfWEfW
NP3837NVYorkshireAirCarbon monoxide10000034.22EfWEfW
NP3837NVYorkshireAirNitrous oxide100000.13EfWEfW
NP3837NVYorkshireAirNitrogen oxides (NO and NO2) as NO210000015.19EfWEfW
NP3837NVYorkshireAirChlorine and inorganic chlorine compounds - as HCl1000026.83EfWEfW
NP3837NVYorkshireAirFluorine and inorganic fluorine compounds - as HF10000.01EfWEfW
NP3837NVYorkshireAirSulphur oxides (SO2 and SO3) as SO210000030.44EfWEfW
NP3837NVYorkshireAirCarbon dioxide10000000213.09EfWEfW

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php?title=Energy_Works_(Hull)

Permit files:

226-Permit-2016.pdf

Permit Decision files:

226-PermitDecision-2016.pdf

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.