Menu Close

Incinerator information library

Information for A303 Enviropark, near Andover in Test Valley

Status: Prevented
Planning Region: South West
Planning Sub-Region: Hampshire
Operator: Wheelabrator Harewood and the Raymond Brown Group
Capacity: 450,000
Campaign Group(s): STOP the Harewood Incinerator and Test Valley Friends of the Earth
Notes: Initial pre-application consultation events were scheduled for end of February 2019, but in February 2020 Wheelabrator announced that it would "no longer continue to invest in the development of the Wheelabrator Harewood waste-to-energy facility" [Source]. Appears the intention was for a conventional mass-burn incinerator, but due to size will be treated as a Nationally Significant Infrastructure Project (NSIP). Those involved in the project include Wheelabrator Technologies Inc, the Raymond Brown Group, Aecom, DWD LLP, Womble Bond Dickinson and Macquarie Infrastructure and Real Assets [Source]. (Entry updated 2019-02-20)

Plume Plotter entry for Harewood


This pollution prediction was produced by Plume Plotter. Click here for more details.

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.