Information for Land at Mossdown Road, Royton, Oldham

Status: Prevented
Planning Region: North West
Planning Sub-Region: Greater Manchester
Operator: The Connell Group / Woodhouse Properies Ltd
Capacity: 125,000 (RDF)
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Planning application for an incineration plant was refused in March 2018 (ref. PA/339409/16) [Source]. (Entry updated 2018-04-13)

Waste management for England 2018: Non-operational (Environment Agency)

Uses data from Waste Data Interrogator 2018 - 2018 Waste Summary Tables for England - Version 2 released by the Environment Agency under the Open Government License

PermitOperator NameSite NameSite AddressFormer Planning RegionFormer Planning Sub-RegionEA AreaTypePermitted Capacity (tonnes)Comment
CP3733QJHooton Bio Power LimitedHooton Park Sustainable Energy FacilityHooton Park Sustainable Energy Facility,North Road, Hooton Park,Eastham, Merseyside, CH651AJNorth westCheshireGreater Manchester, Merseyside and CheshireSRF266,000Permitted 14/12/2015 but not yet built. Construction commenced 2019

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.