Incinerator information library

Information for Javelin Park, Haresfield

Status: Existing
Planning Region: South West
Planning Sub-Region: Gloucestershire
Operator: Urbaser and Balfour Beatty
Capacity: 190,000
Campaign Group(s): Gloucestershire Against Incinerators (GlosAIN) and Glos Rapid Earth Action Network (GREAN) and No Monster Incinerator in Gloucestershire (NoMoInGlo) and Extinction Rebellion
Notes: Commissioning completed in November 2019 with the facility transferred from UBB to Urbaser Environmental Limited. Secretary of State granted planning permission in January 2015 (appeal ref 2200210). Planning application refused by Gloucestershire Planning Committee on the 21st of March 2013 [Source, Source]. On the 20th of October 2010 the Government withdraw PFI funding for the project [Source]. The Council decided to go ahead with the project anyway, and on the 14th of December 2011 named Urbaser and Balfour Beatty as preferred bidder; the contract was awarded in September 2012 [Source]. (Entry updated 2019-11-27)

Plume Plotter entry for Glos


This pollution prediction was produced by Plume Plotter. Click here for more details.

Initial applications received for R1 status: 17 June 2019 (Environment Agency)

Uses data from https://ea.sharefile.com/share/view/sfc08f637d1644668 released by the Environment Agency under the Open Government License

PermitOperatorInstallation nameInstallation addressPermit statusWaste input (000s tonnes per annum)Incinerator typeCalculated R1 valueApplication R1 status grantedSource of data used in R1 calculationsDate R1 application status granted
CP3535CKUrbaser Environmental LtdJavelin Park Energy recovery FacilityJavelin Park, Gloucestershire, GL2 7NQ,Permit issued190Municipal waste0.75YesDesign3/7/2013

Waste management for England 2018: Non-operational (Environment Agency)

Uses data from Waste Data Interrogator 2018 - 2018 Waste Summary Tables for England - Version 2 released by the Environment Agency under the Open Government License

PermitOperator NameSite NameSite AddressFormer Planning RegionFormer Planning Sub-RegionEA AreaTypePermitted Capacity (tonnes)Comment
CP3535CKUrbaser Environmental LimitedJavelin Park ERFJavelin Park,Haresfield,Gloucestershire GL2 7NQWest MidlandsGloucestershireShropshire Herefordshire Worcestershire and GloucestershireMunicipal and/or Industrial & Commercial190,000Building work commenced August 2016

Entry on WikiWaste:

https://wikiwaste.org.uk/index.php?title=Javelin_Park_EfW

Annual Performance Report files:

163-AnnualPerformanceReport-2019.pdf

Permit files:

163-Permit-2013.pdf

Permit Decision files:

163-PermitDecision-2013.pdf

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.