Information for Rivenhall Airfield, Coggeshall Road (Braintree)

Status: Potential
Planning Region: East of England
Planning Sub-Region: Essex
Operator: Golder Associates/Gent Fairhead
Capacity: 595,000
Campaign Group(s): Parishes Against Incineration (PAIN), No Essex Incinerator and Essex and Colchester FoE / Eastern Green Party
Notes: Incinerator for municipal and C&I RDF and paper pulp granted planning permission in March 2010 after a public inquiry [Source]. Application to allow for a maximum of 595,000 capacity approved in February 2016 (ref ESS/34/15/BTE). Allocated Round One Contracts for Difference funding in February 2015 [Source]. In April 2015 permission was granted by Essex County Council for the facility to take SRF/RDF from further afield [Source]. An environmental permit application was made in November 2015 (EPR/KP3035RY/A001), with Schedule 5 notices issues by the Environment Agency in March 2016 and July 2016, and refused in December 2016 [Source]. Consultation on draft revised permit announced in March 2017 with stack height increased to 58 metres [EPR/FP3335YU/A001]. Planning application to increase stack height to 58 metres submitted in July 2017 and refused in April 2019 [ESS/36/17/BTE, Source]. Environmental permit issued in September 2017 with a 58 metre stack height [Source]. Permit variation application to allow a reduced stack height was approved in June 2020 (EPR/FP3335YU/V002). (Entry updated 2020-06-16)

Plume Plotter entry for Rivenhall


This pollution prediction was produced by Plume Plotter. Click here for more details.

Waste management for England 2018: Non-operational (Environment Agency)

Uses data from Waste Data Interrogator 2018 - 2018 Waste Summary Tables for England - Version 2 released by the Environment Agency under the Open Government License

PermitOperator NameSite NameSite AddressFormer Planning RegionFormer Planning Sub-RegionEA AreaTypePermitted Capacity (tonnes)Comment
FP3335YUGent Fairhead & Co LimitedRivenhall Integrated Waste Management FacilityRivenhall Airfield, Woodhouse Lane, Kelvedon, Colchester, Essex , CO5 9DF,East of EnglandEssexEssex Norfolk and SuffolkMunicipal and/or Industrial & Commercial595,000Permitted 2017 - preconstruction

Permit files:

38-Permit-2017.pdf

Permit Decision files:

38-PermitDecision-2017.pdf

Permit Variation files:

38-PermitVariation-2020.pdf

Permit Variation Decision files:

38-PermitVariationDecision-2020.pdf

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.