Menu Close

Incinerator information library

Information for By the River Thames, East of the London Gateway Logistics Park, Thames Haven, Thurrock

Status: Prevented
Planning Region: East of England
Planning Sub-Region: Essex
Operator: Clean Power Properties Ltd (owned and fully funded by Mountgrange Real Estate Opportunity Fund) and Network Rail Infrastructure Ltd, and possibly Biomass Power Ltd and Bouygues (UK) LTD
Capacity: 180,000
Campaign Group(s): Contact coordinator@ukwin.org.uk to be put in touch with those opposing this development.
Notes: Proposed pyrolysis-type incinerator granted planning permission in May 2014 [Source]. Planning application submitted February/March 2014 (ref. 14/00215/FUL). Stated feedstock is "Mixed Source Waste (MSW) and Commercial and Industrial (C&I) Waste" [Source]. Permit application was withdrawn in December 2014, and it is anticipated that if it proceeds the operator will move to change the technology to the gasification technology proposed by CPP for Corby, however as of January 2020 there are no reports of this application being progressed. (Entry updated 2020-01-29)

UKWIN (and therefore the UKWIN map) focuses on Municipal Waste Incinerators, whereas our colleagues at Biofuelwatch focus on biomass projects. If you are interested in waste wood or dedicated biomass incinerators then please see the Biofuelwatch map of UK Biomass Power Stations.

Please be aware: There is always room for improvement, so please send updates to coordinator@ukwin.org.uk. Existing Incinerator means a facility that is operational or under construction/commissioning. A Potential Incinerator is a facility where there is a proposal for an incinerator (e.g. planning application or planning consent) or other reason to believe an incinerator might be built/proposed in the future. A Prevented Incinerator is something which used to be a proposal or expected incinerator which we do not believe is currently being progressed (e.g. because the project was cancelled, planning permission refused, or years have gone by since the permission was granted without any progress) - in some cases a facility marked as prevented is being progressed without us being aware or is subsequently revived. Capacity is usually the permitted or maximum advertised capacity of the facility.